Lampiran 1: Karakteristik Petani Sampel No Sampel Umur (Thn) Lama Pendidikan (Thn) Lama Bertani (Thn) Luas Lahan (Ha)
Lampiran 1: Karakteristik Petani Sampel No Sampel Umur (Thn) Lama Pendidikan (Thn) Lama Bertani (Thn) Luas Lahan (Ha)
9
0.50
20
9
42
18
1.00
10
12
39
17
1.00
15
46
40
16
0.50
20
9
40
15
0.50
30
9
52
14
0.60
19
12
6
9
0.50
40
9
65
24
0.50
18
6
42
23
0.50
20
42
10
22
1.00
45
6
72
21
0.25
30
9
53
20
0.60
30
1
52
9
0.25
20
9
45
6
0.25
70
2
81
5
0.25
10
40
54
4
0.25
20
9
50
3
6 2 0,25
35
2
0.25
30
9
7
6
13
12
1.00
10
12
42
12
1.00
50
1
79
11
0.50
10
37
30
10
0.50
10
12
38
9
0.25
30
6
59
8
0.25
51
Lampiran 2a:Jumlah dan Biaya Penggunaan Pupuk per Petani No Sampel Luas Lahan (Ha) Nama Pupuk
23
0.5 10.00 50,000.00 - - - - 5.00 20,000.00 - - - - 70,000.00
17 0.5 - - 10.00 80,000.00 - - - - 10.00 80,000.00 - - 160,000.00
18
1 10.00 50,000.00 - - - - 10.00 40,000.00 - - - - 90,000.00
19 0.6 - - - - - - - - - - - - -
20 0.25 - - - - - - - - - - - - -
21
1 10.00 50,000.00 - - - - 10.00 30,000.00 - - - - 80,000.00
22
0.25 3.00 15,000.00 - - - - 5.00 20,000.00 - - - - 35,000.00
0.5 15.00 45,000.00 - - - - - - - - - - 45,000.00
15 0.5 - - - - 2.00 16,000.00 - - - - 2.00 6,000.00 22,000.00
24 0.5 - - - - - - - - - - - - -
25
0.25 5.00 15,000.00 - - - - 2.00 8,000.00 - - - - 23,000.00
26 0.5 - - 5.00 40,000.00 5.00 40,000.00 - - - - - - 80,000.00
27
0.5 3.00 15,000.00 - - - - 2.00 8,000.00 - - - - 23,000.00
28
0.5 8.00 40,000.00 - - - - 3.00 15,000.00 - - - - 55,000.00
29
0.16 20.00 60,000.00 - - - - - - 15.00 120,000.00 - - 180,000.00
16
1 10.00 50,000.00 - - - - 10.00 40,000.00 - - - - 90,000.00
Total Biaya (Rp) Urea (Kg) Biaya (Rp) NPK (Kg) Biaya (Rp) SS (Kg)
Biaya
(Rp)
6
Phonska (Kg) Biaya (Rp) TSP (Kg) Biaya (Rp) ZA (Kg) Biaya (Rp)
1
0.25 5.00 25,000.00 - - 5.00 30,000.00 - - - - - - 55,000.00
2
0.25 5.00 20,000.00 - - - - 5.00 25,000.00 - - - - 45,000.00
3
0.25 3.00 15,000.00 - - - - - - 2.00 16,000.00 - - 31,000.00
4
0.25 3.00 9,000.00 - - - - 3.00 15,000.00 - - - - 24,000.00
5 0.04 - - - - - - - - - - - - -
0.25 2.00 10,000.00 4.00 32,000.00 - - - - - - - - 42,000.00
14
7
0.25 6.00 18,000.00 6.00 48,000.00 - - - - - - - - 66,000.00
8
0.25 2.00 10,000.00 2.00 16,000.00 - - - - - - - - 26,000.00
9
0.5 5.00 25,000.00 - - 5.00 40,000.00 - - - - - - 65,000.00
10
0.5 10.00 50,000.00 - - - - 10.00 40,000.00 - - - - 90,000.00
11 1 - - 5.00 40,000.00 - - - - - - - - 40,000.00
12 1 - - 15.00 120,000.00 - - 15.00 60,000.00 - - - - 180,000.00
13 0.6 - - - - - - - - - - - - -
30 1 - - - - 6.00 48,000.00 6.00 24,000.00 - - - - 72,000.00
Lampiran 2b:Jumlah dan Biaya Penggunaan Pupuk per Ha No Sampel Nama Pupuk
4.00 32,000.00 - - - - 4.00 12,000.00 44,000.00
43 16.00 80,000.00 - - - - 6.00 30,000.00 - - - - 110,000.00 44 125.00 375,000.00 - - - - - - 93.75 750,000.00 - - 1,125,000.00 45 - - - -
39 6.00 30,000.00 - - - - 4.00 16,000.00 - - - - 46,000.00
10.00 80,000.00 10.00 80,000.00 - - - - - - 160,000.00
31 30.00 90,000.00 - - - - - - - - - - 90,000.00 33 - - - - - - - - - - - - - 35 20.00 60,000.00 - - - - 8.00 32,000.00 - - - - 92,000.00 37 - -
29 12.00 60,000.00 - - - - 20.00 80,000.00 - - - - 140,000.00
27 10.00 50,000.00 - - - - 10.00 30,000.00 - - - - 80,000.00
22 10.00 50,000.00 - - - - 10.00 40,000.00 - - - - 90,000.00 23 - - - - - - - - - - - - - 24 - - - - - - - - - - - - -
20 20.00 100,000.00 - - - - 10.00 40,000.00 - - - - 140,000.00 21 - - 20.00 160,000.00 - - - - 20.00 160,000.00 - - 320,000.00
15.00 120,000.00 - - 15.00 60,000.00 - - - - 180,000.00 16 - - - - - - - - - - - - - 18 10.00 50,000.00 - - - - 10.00 40,000.00 - - - - 90,000.00 19 - - - -
Total Biaya (Rp) Urea (Kg) Biaya (Rp) NPK (Kg) Biaya (Rp) SS (Kg) Biaya (Rp) Phonska (Kg) Biaya (Rp) TSP (Kg) Biaya (Rp) ZA (Kg) Biaya (Rp)
13 20.00 100,000.00 - - - - 20.00 80,000.00 - - - - 180,000.00 14 - - 5.00 40,000.00 - - - - - - - - 40,000.00 15 - -
12 10.00 50,000.00 - - 10.00 80,000.00 - - - - - - 130,000.00
10 8.00 40,000.00 8.00 64,000.00 - - - - - - - - 104,000.00
9 24.00 72,000.00 24.00 192,000.00 - - - - - - - - 264,000.00
5 12.00 36,000.00 - - - - 12.00 60,000.00 - - - - 96,000.00 7 - - - - - - - - - - - - - 8 8.00 40,000.00 16.00 128,000.00 - - - - - - - - 168,000.00
3 12.00 60,000.00 - - - - - - 8.00 64,000.00 - - 124,000.00
2 20.00 80,000.00 - - - - 20.00 100,000.00 - - - - 180,000.00
1 20.00 100,000.00 - - 20.00 120,000.00 - - - - - - 220,000.00
6.00 48,000.00 6.00 24,000.00 - - - - 72,000.00
Lampiran3a: Biaya Penyusutan Peralatan per Petani No Sampel Luas Lahan (Ha) Cangkul Garpu Parang u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp)
u. ekonomis
(Thn)
23
17
0.5 5.00 80,000.00 16,000.00 5.00 - - 5.00 24,000.00 4,800.00
18
1 5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
19
0.6 5.00 120,000.00 24,000.00 5.00 40,000.00 8,000.00 5.00 48,000.00 9,600.00
20
0.25 5.00 40,000.00 8,000.00 5.00 - - 5.00 24,000.00 4,800.00
21
1 5.00 80,000.00 16,000.00 5.00 20,000.00 4,000.00 5.00 48,000.00 9,600.00
22
0.25 5.00 80,000.00 16,000.00 5.00 - - 5.00 24,000.00 4,800.00
0.5 5.00 120,000.00 24,000.00 5.00 35,000.00 7,000.00 5.00 48,000.00 9,600.00
16
24
0.5 5.00 120,000.00 24,000.00 5.00 35,000.00 7,000.00 5.00 96,000.00 19,200.00
25
0.25 5.00 80,000.00 16,000.00 5.00 - - 5.00 24,000.00 4,800.00
26
0.5 5.00 80,000.00 16,000.00 5.00 - - 5.00 - -
27
0.5 5.00 80,000.00 16,000.00 5.00 - - 5.00 24,000.00 4,800.00
28
0.5 5.00 120,000.00 24,000.00 5.00 40,000.00 8,000.00 5.00 72,000.00 14,400.00
29
0.16 5.00 120,000.00 24,000.00 5.00 35,000.00 7,000.00 5.00 24,000.00 4,800.00
30
0.5 5.00 80,000.00 16,000.00 5.00 - - 5.00 18,000.00 3,600.00
0.5 5.00 40,000.00 8,000.00 5.00 - - 5.00 24,000.00 4,800.00
Biaya-residu (Rp) Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp)
0.25 5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
1
0.25 5.00 80,000.00 16,000.00 5.00 - - 5.00 24,000.00 4,800.00
2
0.25 5.00 5,000.00 1,000.00 5.00 - - 5.00 14,000.00 2,800.00
3
0.25 5.00 40,000.00 8,000.00 5.00 - - 5.00 24,000.00 4,800.00
4
0.25 5.00 40,000.00 8,000.00 5.00 - - 5.00 24,000.00 4,800.00
5
0.25 5.00 80,000.00 16,000.00 5.00 - - 5.00 72,000.00 14,400.00
6
0.25 5.00 80,000.00 16,000.00 5.00 35,000.00 7,000.00 5.00 48,000.00 9,600.00
7
8
15
0.25 5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
9
0.5 5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
10
0.5 5.00 40,000.00 8,000.00 5.00 - - 5.00 24,000.00 4,800.00
11
1 5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
12
1 5.00 80,000.00 16,000.00 5.00 35,000.00 7,000.00 5.00 24,000.00 4,800.00
13
0.6 5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
14
1 5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
1 5.00 70,000.00 14,000.00 5.00 - - 5.00 24,000.00 4,800.00
Sambungan Lampiran3a: Biaya Penyusutan Peralatan per Petani No Sampel Luas Lahan (Ha) Ember Goni Mesin Babat u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp)
23
17
0.5 3.00 - - 1.00 30,000.00 30,000.00 10.00 - -
18
1 3.00 4,000.00 1,333.33 1.00 48,000.00 48,000.00 10.00 - -
19
0.6 3.00 - - 1.00 24,000.00 24,000.00 10.00 - -
20
0.25 3.00 - - 1.00 18,000.00 18,000.00 10.00 - -
21
1 3.00 - - 1.00 48,000.00 48,000.00 10.00 - -
22
0.25 3.00 9,000.00 3,000.00 1.00 15,000.00 15,000.00 10.00 - -
0.5 3.00 4,000.00 1,333.33 1.00 25,000.00 25,000.00 10.00 900,000.00 90,000.00
16
24
0.5 3.00 - - 1.00 15,000.00 15,000.00 10.00 1,400,000.00 140,000.00
25
0.25 3.00 9,000.00 3,000.00 1.00 18,000.00 18,000.00 10.00 - -
26
0.5 3.00 9,000.00 3,000.00 1.00 21,000.00 21,000.00 10.00 - -
27
0.5 3.00 - - 1.00 18,000.00 18,000.00 10.00 - -
28
0.5 3.00 18,000.00 6,000.00 1.00 45,000.00 45,000.00 10.00 - -
29
0.16 3.00 - - 1.00 30,000.00 30,000.00 10.00 - -
30
0.5 3.00 28,000.00 9,333.33 1.00 30,000.00 30,000.00 10.00 - -
0.5 3.00 - - 1.00 21,000.00 21,000.00 10.00 - -
1
0.25 3.00 9,000.00 3,000.00 1.00 15,000.00 15,000.00 10.00 - -
0.25 3.00 4,000.00 1,333.33 1.00 12,000.00 12,000.00 10.00 - -
2
0.25 3.00 - - 1.00 15,000.00 15,000.00 10.00 - -
3
0.25 3.00 - - 1.00 15,000.00 15,000.00 10.00 - -
4
0.25 3.00 - - 1.00 15,000.00 15,000.00 10.00 - -
5
0.25 3.00 45,000.00 15,000.00 1.00 12,500.00 12,500.00 10.00 - -
6
0.25 3.00 - - 1.00 15,000.00 15,000.00 10.00 - -
7
8
15
0.25 3.00 - - 1.00 15,000.00 15,000.00 10.00 - -
9
0.5 3.00 18,000.00 6,000.00 1.00 21,000.00 21,000.00 10.00 - -
10
0.5 3.00 - - 1.00 15,000.00 15,000.00 10.00 - -
11
1 3.00 - - 1.00 48,000.00 48,000.00 10.00 - -
12
1 3.00 9,000.00 3,000.00 1.00 48,000.00 48,000.00 10.00 1,700,000.00 170,000.00
13
0.6 3.00 - - 1.00 30,000.00 30,000.00 10.00 - -
14
1 3.00 - - 1.00 48,000.00 48,000.00 10.00 - -
1 3.00 14,000.00 4,666.67 1.00 30,000.00 30,000.00 10.00 700,000.00 70,000.00
Sambungan Lampiran3a: Biaya Penyusutan Peralatan per Petani No Sampel Luas Lahan (Ha) Bakul Total Biaya Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp)
23
17
0.5 2.00 21,000.00 10,500.00 61,300.00
18
1 2.00 21,000.00 10,500.00 85,433.33
19
0.6 2.00 21,000.00 10,500.00 76,100.00
20
0.25 2.00 21,000.00 10,500.00 41,300.00
21
1 2.00 16,000.00 8,000.00 85,600.00
22
0.25 2.00 21,000.00 10,500.00 49,300.00
0.5 2.00 - - 156,933.33
16
24
0.5 2.00 16,000.00 8,000.00 213,200.00
25
0.25 2.00 21,000.00 10,500.00 52,300.00
26
0.5 2.00 - - 40,000.00
27
0.5 2.00 21,000.00 10,500.00 49,300.00
28
0.5 2.00 21,000.00 10,500.00 107,900.00
29
0.16 2.00 21,000.00 10,500.00 76,300.00
0.5 2.00 21,000.00 10,500.00 69,433.33
1
0.25 2.00 16,000.00 8,000.00 42,133.33
8
2
0.25 2.00 16,000.00 8,000.00 26,800.00
3
0.25 2.00 - - 27,800.00
4
0.25 2.00 21,000.00 10,500.00 38,300.00
5
0.25 2.00 - - 57,900.00
6
0.25 2.00 21,000.00 10,500.00 58,100.00
7
0.25 2.00 21,000.00 10,500.00 54,100.00
0.25 2.00 21,000.00 10,500.00 51,100.00
15
9
0.5 2.00 21,000.00 10,500.00 63,100.00
10
0.5 2.00 21,000.00 10,500.00 38,300.00
11
1 2.00 21,000.00 10,500.00 84,100.00
12
1 2.00 21,000.00 10,500.00 259,300.00
13
0.6 2.00 21,000.00 10,500.00 66,100.00
14
1 2.00 21,000.00 10,500.00 84,100.00
0.5 2.00 21,000.00 10,500.00 44,300.00
Lampiran 3b: Biaya Penyusutan Peralatan per Ha No Sampel Cangkul Garpu Parang u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp)
5.00 320,000.00 64,000.00 5.00 - - 5.00 96,000.00 19,200.00
5.00 160,000.00 32,000.00 5.00 - - 5.00 36,000.00 7,200.00
17
5.00 160,000.00 32,000.00 5.00 - - 5.00 48,000.00 9,600.00
18
5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
19
5.00 200,000.00 40,000.00 5.00 66,666.67 13,333.33 5.00 80,000.00 16,000.00
20
5.00 160,000.00 32,000.00 5.00 - - 5.00 96,000.00 19,200.00
21
5.00 80,000.00 16,000.00 5.00 20,000.00 4,000.00 5.00 48,000.00 9,600.00
22
23
5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
5.00 240,000.00 48,000.00 5.00 70,000.00 14,000.00 5.00 96,000.00 19,200.00
24
5.00 240,000.00 48,000.00 5.00 70,000.00 14,000.00 5.00 192,000.00 38,400.00
25
5.00 320,000.00 64,000.00 5.00 - - 5.00 96,000.00 19,200.00
26
5.00 160,000.00 32,000.00 5.00 - - 5.00 - -
27
5.00 160,000.00 32,000.00 5.00 - - 5.00 48,000.00 9,600.00
28
5.00 240,000.00 48,000.00 5.00 80,000.00 16,000.00 5.00 144,000.00 28,800.00
29
16
15
1
5.00 320,000.00 64,000.00 5.00 - - 5.00 192,000.00 38,400.00
5.00 320,000.00 64,000.00 5.00 - - 5.00 96,000.00 19,200.00
2
5.00 20,000.00 4,000.00 5.00 - - 5.00 56,000.00 11,200.00
3
5.00 160,000.00 32,000.00 5.00 - - 5.00 96,000.00 19,200.00
4
5.00 160,000.00 32,000.00 5.00 - - 5.00 96,000.00 19,200.00
5
5.00 320,000.00 64,000.00 5.00 - - 5.00 288,000.00 57,600.00
6
5.00 320,000.00 64,000.00 5.00 140,000.00 28,000.00 5.00 192,000.00 38,400.00
7
8
5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
5.00 320,000.00 64,000.00 5.00 - - 5.00 192,000.00 38,400.00
9
5.00 160,000.00 32,000.00 5.00 - - 5.00 96,000.00 19,200.00
10
5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
11
5.00 80,000.00 16,000.00 5.00 - - 5.00 48,000.00 9,600.00
12
5.00 80,000.00 16,000.00 5.00 35,000.00 7,000.00 5.00 24,000.00 4,800.00
13
5.00 133,333.33 26,666.67 5.00 - - 5.00 80,000.00 16,000.00
14
5.00 750,000.00 150,000.00 5.00 218,750.00 43,750.00 5.00 150,000.00 30,000.00
Sambungan Lampiran 3b: Biaya Penyusutan Peralatan per Ha No Sampel Ember Goni Mesin Babat u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp)
16 3.00 56,000.00 18,666.67 1.00 60,000.00 60,000.00 10.00 - -
28 3.00 36,000.00 12,000.00 1.00 90,000.00 90,000.00 10.00 - -
27 3.00 - - 1.00 36,000.00 36,000.00 10.00 - -
26 3.00 18,000.00 6,000.00 1.00 42,000.00 42,000.00 10.00 - -
25 3.00 36,000.00 12,000.00 1.00 72,000.00 72,000.00 10.00 - -
24 3.00 - - 1.00 30,000.00 30,000.00 10.00 2,800,000.00 280,000.00
23 3.00 8,000.00 2,666.67 1.00 50,000.00 50,000.00 10.00 1,800,000.00 180,000.00
22 3.00 36,000.00 12,000.00 1.00 60,000.00 60,000.00 10.00 - -
21 3.00 - - 1.00 48,000.00 48,000.00 10.00 - -
20 3.00 - - 1.00 72,000.00 72,000.00 10.00 - -
19 3.00 - - 1.00 40,000.00 40,000.00 10.00 - -
18 3.00 4,000.00 1,333.33 1.00 48,000.00 48,000.00 10.00 - -
17 3.00 - - 1.00 60,000.00 60,000.00 10.00 - -
15 3.00 - - 1.00 42,000.00 42,000.00 10.00 - -
1 3.00 16,000.00 5,333.33 1.00 48,000.00 48,000.00 10.00 - -
14 3.00 - - 1.00 48,000.00 48,000.00 10.00 - -
13 3.00 - - 1.00 50,000.00 50,000.00 10.00 - -
12 3.00 9,000.00 3,000.00 1.00 48,000.00 48,000.00 10.00 1,700,000.00 170,000.00
11 3.00 - - 1.00 48,000.00 48,000.00 10.00 - -
10 3.00 - - 1.00 30,000.00 30,000.00 10.00 - -
9 3.00 36,000.00 12,000.00 1.00 42,000.00 42,000.00 10.00 - -
8 3.00 - - 1.00 60,000.00 60,000.00 10.00 - -
7 3.00 36,000.00 12,000.00 1.00 60,000.00 60,000.00 10.00 - -
6 3.00 - - 1.00 60,000.00 60,000.00 10.00 - -
5 3.00 180,000.00 60,000.00 1.00 50,000.00 50,000.00 10.00 - -
4 3.00 - - 1.00 60,000.00 60,000.00 10.00 - -
3 3.00 - - 1.00 60,000.00 60,000.00 10.00 - -
2 3.00 - - 1.00 60,000.00 60,000.00 10.00 - -
29 3.00 - - 1.00 187,500.00 187,500.00 10.00 - -
Sambungan Lampiran 3b: Biaya Penyusutan Peralatan per Ha No Sampel Bakul Total Biaya Penyusutan (Rp) u. ekonomis (Thn) Biaya-residu (Rp) Penyusutan (Rp)
16 2.00 42,000.00 21,000.00 138,866.67
28 2.00 42,000.00 21,000.00 215,800.00
27 2.00 42,000.00 21,000.00 98,600.00
26 2.00 - - 80,000.00
25 2.00 84,000.00 42,000.00 209,200.00
24 2.00 32,000.00 16,000.00 426,400.00
23 2.00 - - 313,866.67
22 2.00 84,000.00 42,000.00 197,200.00
21 2.00 16,000.00 8,000.00 85,600.00
20 2.00 84,000.00 42,000.00 165,200.00
19 2.00 35,000.00 17,500.00 126,833.33
18 2.00 21,000.00 10,500.00 85,433.33
17 2.00 42,000.00 21,000.00 122,600.00
1 2.00 64,000.00 32,000.00 168,533.33
2 2.00 64,000.00 32,000.00 107,200.00
14 2.00 21,000.00 10,500.00 84,100.00
13 2.00 35,000.00 17,500.00 110,166.67
12 2.00 21,000.00 10,500.00 259,300.00
11 2.00 21,000.00 10,500.00 84,100.00
10 2.00 42,000.00 21,000.00 76,600.00
9 2.00 42,000.00 21,000.00 126,200.00
8 2.00 84,000.00 42,000.00 204,400.00
7 2.00 84,000.00 42,000.00 216,400.00
6 2.00 84,000.00 42,000.00 232,400.00
5 2.00 - - 231,600.00
4 2.00 84,000.00 42,000.00 153,200.00
3 2.00 - - 111,200.00
15 2.00 42,000.00 21,000.00 88,600.00
Lampiran 4a: Penggunaan dan Biaya TKDK Per Petani No Sampel Luas Lahan (Ha) Pengolahan Lahan Penanaman Pemupukan Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
21
0.50
23
1.00 1.60 114,000.00 - 0.40 16,000.00
1.00 2.40 146,000.00
0.25
22
0.75 0.60 61,500.00
3.00 4.00 310,000.00
3.00 4.00 310,000.00
1.00
20 0.25 - 4.00 160,000.00 - 4.00 160,000.00 - - -
24 0.50 - - - - - - - - -
3.00 2.40 246,000.00 - - -
5.00 4.00 410,000.00
0.60
19
1.93 0.60 120,500.00
4.68 2.40 330,000.00
4.68 2.40 330,000.00
1.00
18
0.50 0.40 41,000.00
5.00 4.00 410,000.00 - 4.00 160,000.00 - 0.90 36,000.00
25 0.25 - 4.00 160,000.00 - 4.00 160,000.00 - 0.40 16,000.00
5.00 4.00 410,000.00
1.00 0.80 82,000.00
45.68 95.50 6,104,000.00
71.68 91.30 7,236,000.00
14.90
Total
0.25 0.40 28,500.00
1.00 3.20 178,000.00
3.00 3.20 278,000.00
1.00
30
1.00 0.80 82,000.00 - 0.60 24,000.00
0.16
26
29
1.00 4.00 210,000.00 - 0.60 24,000.00
5.00 4.00 410,000.00
0.50
28
3.00 4.00 310,000.00 - 8.00 320,000.00 - 0.40 16,000.00
0.50
27
5.00 4.00 410,000.00 - 8.00 320,000.00 - 0.60 24,000.00
0.50
5.00 4.00 410,000.00
0.50
1
2.00 1.60 164,000.00
2.00 1.60 164,000.00
2.00 1.60 164,000.00
0.25
8
0.25 0.20 20,500.00
3.00 2.40 246,000.00
3.00 2.40 246,000.00
0.25
7
0.25 0.20 20,500.00
2.00 1.60 164,000.00
9
0.25
6
5 0.04 - 2.40 96,000.00 - 0.80 32,000.00 - - -
4 0.25 - 4.00 160,000.00 - 3.20 128,000.00 - 0.60 24,000.00
2.00 2.40 196,000.00 - 4.80 192,000.00 - 1.60 64,000.00
0.25
3
2 0.25 - 4.00 160,000.00 - 1.60 64,000.00 - 0.80 32,000.00
1.00 0.80 82,000.00 - 1.60 64,000.00 - 0.80 32,000.00
0.25
0.50 0.40 41,000.00
0.50
17
12 1.00 - 0.90 36,000.00 - 0.90 36,000.00 - 0.60 24,000.00
16 0.50 - 4.00 160,000.00 - 4.00 160,000.00 - 0.40 16,000.00
5.00 4.00 410,000.00 - 0.40 16,000.00
5.00 4.00 410,000.00
0.50
15
14 1.00 - 4.00 160,000.00 - 4.00 160,000.00 - 0.60 24,000.00
5.00 4.00 410,000.00 - - -
5.00 4.00 410,000.00
0.60
13
0.50 0.40 41,000.00
4.00 4.00 360,000.00
3.00 5.00 350,000.00
5.00 4.00 410,000.00
1.00
11
2.00 1.60 164,000.00 - 0.60 24,000.00
2.00 2.40 196,000.00
0.50
10
0.25 0.20 20,500.00
4.00 4.00 360,000.00
5.18 13.70 807,000.00
Sambungan Lampiran 4a: Penggunaan dan Biaya TKDK Per Petani No Sampel Luas Lahan (Ha) Penyiangan Pemberantasan Hama dan Penyakit Panen Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
21
23 0.50 - 8.00 320,000.00 - - -
1.00 2.40 146,000.00
22 0.25 - 3.20 128,000.00 - - -
3.00 4.00 310,000.00
3.00 4.00 310,000.00 - - -
1.00
2.00 4.00 260,000.00
24 0.50 - 4.00 160,000.00 - - - - - -
20 0.25 - 8.00 320,000.00 - - -
5.00 4.00 410,000.00
5.00 4.00 410,000.00 - - -
0.60
19
5.68 4.00 444,000.00
5.00 4.00 410,000.00
25 0.25 - 4.00 160,000.00 - - -
1.00
2.00 4.00 260,000.00
1.29 4.19 231,791.67 - - -
0.50
14.90 38.56 125.65 6,953,750.00 - - - 65.68 106.30 7,536,000.00 Rata-Rata
Total
2.00 4.00 260,000.00
30 1.00 - 4.00 160,000.00 - - -
29 0.16 - 8.00 320,000.00 - - -
2.00 4.00 260,000.00
28 0.50 - 4.00 160,000.00 - - - - 4.00 160,000.00
5.00 4.00 410,000.00
27 0.50 - 8.00 320,000.00 - - -
3.00 4.00 310,000.00
2.00 4.00 260,000.00 - - -
0.50
26
5.68 4.00 444,000.00 - - -
18
1 0.25 - 4.00 160,000.00 - - -
2.00 1.60 164,000.00 - - - - 3.20 128,000.00
4.00 4.00 360,000.00
4.00 4.00 360,000.00 - - -
0.50
9
8 0.25 - 3.20 128,000.00 - - - - 2.40 96,000.00
7 0.25 - 8.00 320,000.00 - - - - 4.00 160,000.00
0.25
3.00 2.40 246,000.00
6
5 0.04 - 1.60 64,000.00 - - - - 2.40 96,000.00
2.00 2.40 196,000.00
4 0.25 - 3.20 128,000.00 - - -
3 0.25 - 2.40 96,000.00 - - - - 2.40 96,000.00
2 0.25 - 2.40 96,000.00 - - - - 4.80 192,000.00
1.00 2.40 146,000.00
10 0.50 - 2.40 96,000.00 - - -
11
5.00 4.00 410,000.00
15
5.00 4.00 410,000.00 - - -
0.50
17
16 0.50 - 4.00 160,000.00 - - - - 4.00 160,000.00
1.88 4.75 283,750.00 - - - - 4.00 160,000.00
0.50
14 1.00 - 4.00 160,000.00 - - - - 4.00 160,000.00
1.00
5.00 4.00 410,000.00
5.00 4.00 410,000.00 - - -
0.60
13
12 1.00 - 0.90 36,000.00 - - - - 1.50 60,000.00
10.00 8.00 820,000.00
5.00 4.00 410,000.00 - - -
2.19 3.54 251,200.00
Sambungan Lampiran 4a: Penggunaan dan Biaya TKDK Per Petani No Sampel Luas Lahan (Ha)
Pencucian &Penjemuran
Biaya Total TKDKBiaya (Rp)
1 0.25 - 0.40 16,000.00 500,000.00
0.38 0.40 16,000.00 1,317,500.00
1.00
0.80 0.60 24,000.00 1,692,500.00
19 0.60 - 0.40 16,000.00 1,492,000.00
20 0.25 - 0.40 16,000.00 916,000.00
21
1.00
22 0.25 - 0.40 16,000.00 566,000.00
17 0.50 - 0.60 24,000.00 1,705,000.00
23 0.50 - 0.40 16,000.00 1,352,000.00
24 0.50 - 0.40 16,000.00 176,000.00
25 0.25 - 0.60 24,000.00 780,000.00
26 0.50 - 1.60 64,000.00 1,388,000.00
27 0.50 - 0.80 32,000.00 1,408,000.00
28 0.50 - 0.80 32,000.00 996,000.00
18
16 0.50 - 0.40 16,000.00 672,000.00
2 0.25 - 1.60 64,000.00 608,000.00
9 0.50 - 0.40 16,000.00 1,476,500.00
3 0.25 - 0.80 32,000.00 676,000.00
4 0.25 - 0.80 32,000.00 668,000.00
5 0.04 - 0.40 16,000.00 304,000.00
6 0.25 - 0.40 16,000.00 656,500.00
7 0.25 - 0.40 16,000.00 1,008,500.00
8 0.25 - 0.40 16,000.00 609,000.00
10 0.50 - 0.40 16,000.00 742,000.00
(Rp) Pria (HKP)
Wanita
(HKP)
11 1.00 - 0.80 32,000.00 2,063,000.00
12 1.00 - 0.60 24,000.00 216,000.00
13 0.60 - 0.60 24,000.00 1,664,000.00
14 1.00 - 0.40 16,000.00 680,000.00
15
0.50
0.25 0.40 16,000.00 1,295,750.00
0.30 1.25 64,950.00
3.00 4.00 310,000.00
10.00 8.00 820,000.00 - 8.00 320,000.00 - 1.80 72,000.00 24 - - - - - - - - -
23
4.00 6.40 456,000.00 - 1.60 64,000.00
4.00 9.60 584,000.00
22
0.75 0.60 61,500.00
3.00 4.00 310,000.00
16.00 640,000.00 - 1.60 64,000.00
21
16.00 640,000.00 - - -
20
5.00 4.00 410,000.00 - - -
8.33 6.67 683,333.33
19
1.93 0.60 120,500.00
25
26
4.68 2.40 330,000.00
30
3.24 8.13 487,394.44
5.02 9.15 616,905.56
8.93 37.55 1,948,500.00 Rata-Rata
Total 150.60 274.43 18,507,166.67 97.26 243.97 14,621,833.33
0.25 0.40 28,500.00
1.00 3.20 178,000.00
3.00 3.20 278,000.00
6.25 5.00 512,500.00 - 3.75 150,000.00
10.00 8.00 820,000.00 - 16.00 640,000.00 - 1.20 48,000.00
6.25 5.00 512,500.00
29
2.00 8.00 420,000.00 - 1.20 48,000.00
10.00 8.00 820,000.00
28
6.00 8.00 620,000.00 - 16.00 640,000.00 - 0.80 32,000.00
27
4.68 2.40 330,000.00
18
Lampiran 4b: Penggunaan dan Biaya TKDK Per Ha No Sampel Pengolahan Lahan Penanaman Pemupukan Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
7
2.00 1.60 164,000.00
8.00 6.40 656,000.00
8.00 6.40 656,000.00
8
1.00 0.80 82,000.00
12.00 9.60 984,000.00
12.00 9.60 984,000.00
1.00 0.80 82,000.00
8.00 8.00 720,000.00
8.00 6.40 656,000.00
8.00 6.40 656,000.00
6
8.00 9.60 784,000.00 - 19.20 768,000.00 - 6.40 256,000.00 4 - 16.00 640,000.00 - 12.80 512,000.00 - 2.40 96,000.00 5 - 60.00 2,400,000.00 - 20.00 800,000.00 - - -
3
4.00 3.20 328,000.00 - 6.40 256,000.00 - 3.20 128,000.00 2 - 16.00 640,000.00 - 6.40 256,000.00 - 3.20 128,000.00
1
9
8.00 8.00 720,000.00
1.00 0.80 82,000.00
8.33 6.67 683,333.33
10.00 8.00 820,000.00
10.00 8.00 820,000.00
17
10.00 8.00 820,000.00 - 0.80 32,000.00 16 - 8.00 320,000.00 - 8.00 320,000.00 - 0.80 32,000.00
10.00 8.00 820,000.00
15
8.33 6.67 683,333.33 - - - 14 - 4.00 160,000.00 - 4.00 160,000.00 - 0.60 24,000.00
13
0.50 0.40 41,000.00
0.50 0.40 41,000.00 12 - 0.90 36,000.00 - 0.90 36,000.00 - 0.60 24,000.00
3.00 5.00 350,000.00
5.00 4.00 410,000.00
11
4.00 3.20 328,000.00 - 1.20 48,000.00
4.00 4.80 392,000.00
10
- 16.00 640,000.00 -
- 16.00 640,000.00 -
- 9.60 384,000.00 - - - -
- 12.80 512,000.00 - - -
- 8.00 320,000.00 - - - -
8.00 16.00 1,040,000.00
8.33 6.67 683,333.33
20
8.00 16.00 1,040,000.00
21
3.00 4.00 310,000.00 - - -
3.00 4.00 310,000.00
22
4.00 9.60 584,000.00
23
10.00 8.00 820,000.00
24
25
26
19
4.00 8.00 520,000.00 - - -
6.00 8.00 620,000.00
27
10.00 8.00 820,000.00
28
8.00 320,000.00
29
12.50 25.00 1,625,000.00
30
2.00 4.00 260,000.00
Total 64.10 378.53 18,346,166.67 - - - 131.85 320.63 19,417,666.67 Rata-Rata
2.14 12.62 611,538.89 - - -
8.33 6.67 683,333.33 - - -
5.68 4.00 444,000.00
4.39 10.69 647,255.56
6.00 4.80 492,000.00
Sambungan Lampiran 4b: Penggunaan dan Biaya TKDK Per Ha No Sampel Penyiangan Pemberantasan Hama dan Penyakit Panen Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
1 - 16.00 640,000.00 - - -
4.00 9.60 584,000.00
2
19.20 768,000.00 3 - 9.60 384,000.00 - - - - 9.60 384,000.00
4
8.00 9.60 784,000.00 5 - 40.00 1,600,000.00 - - - - 60.00 2,400,000.00
6
8.00 6.40 656,000.00 - - - - 12.80 512,000.00 7 - 32.00 1,280,000.00 - - - - 16.00 640,000.00 8 - 12.80 512,000.00 - - - - 9.60 384,000.00
9
8.00 8.00 720,000.00 - - -
8.00 8.00 720,000.00 10 - 4.80 192,000.00 - - -
11
5.68 4.00 444,000.00 - - -
5.00 4.00 410,000.00 - - -
10.00 8.00 820,000.00 12 - 0.90 36,000.00 - - - - 1.50 60,000.00
13
8.33 6.67 683,333.33 - - -
8.33 6.67 683,333.33 14 - 4.00 160,000.00 - - - - 4.00 160,000.00
15
3.75 9.50 567,500.00 - - - - 8.00 320,000.00
16
8.00 320,000.00
17
10.00 8.00 820,000.00 - - -
10.00 8.00 820,000.00
18
- 32.00 1,280,000.00 - - -
- 12.80 512,000.00 - - -
- 16.00 640,000.00 - - -
- 8.00 320,000.00 - - - - - -
- 16.00 640,000.00 - - -
- 16.00 640,000.00 - - -
- 8.00 320,000.00 - - - -
- 50.00 2,000,000.00 - - -
- 4.00 160,000.00 - - -
Sambungan Lampiran 4b: Penggunaan dan Biaya TKDK Per Ha No Sampel Pencucian &Penjemuran Biaya Total TKDK (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
1 - 1.60 64,000.00 2,000,000.00 2 - 6.40 256,000.00 2,432,000.00 3 - 3.20 128,000.00 2,704,000.00 4 - 3.20 128,000.00 2,672,000.00 5 -
10.00 400,000.00 7,600,000.00 6 - 1.60 64,000.00 2,626,000.00 7 - 1.60 64,000.00 4,034,000.00 8 - 1.60 64,000.00 2,436,000.00 9 - 0.80 32,000.00 2,953,000.00 10 - 0.80 32,000.00 1,484,000.00 11 - 0.80 32,000.00 2,063,000.00 12 - 0.60 24,000.00 216,000.00 13 - 1.00 40,000.00 2,773,333.33 14 - 0.40 16,000.00 680,000.00
15
0.50 0.80 32,000.00 2,591,500.00 16 - 0.80 32,000.00 1,344,000.00 17 - 1.20 48,000.00 3,410,000.00
18
0.80 0.60 24,000.00 1,692,500.00 19 - 0.67 26,666.67 2,486,666.67 20 - 1.60 64,000.00 3,664,000.00
21
0.38 0.40 16,000.00 1,317,500.00 22 - 1.60 64,000.00 2,264,000.00 23 - 0.80 32,000.00 2,704,000.00 24 - 0.80 32,000.00 352,000.00 25 - 2.40 96,000.00 3,120,000.00 26 - 3.20 128,000.00 2,776,000.00 27 - 1.60 64,000.00 2,816,000.00 28 - 1.60 64,000.00 1,992,000.00 29 - 5.00 200,000.00 5,000,000.00
Lampiran 5a: Penggunaan dan Biaya TKLK Per Petani No Sampel Luas Lahan (Ha) Pengolahan Lahan Penanaman Pemupukan Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
27 0.50 - - - - - - - - -
21 1.00 - 4.00 160,000.00 - 4.00 160,000.00 - - -
22 0.25 - - - - - - - - -
23 0.50 - - - - - - - - -
24
0.50
4.00 3.20 328,000.00 - 1.60 64,000.00 - - -
25 0.24 - - - - - - - - -
26 0.50 - - - - - - - - -
28
19 0.60 - - - - - - - - -
0.50
5.00 3.20 378,000.00
1.00 0.80 82,000.00 - - -
29 0.16 - - - - - - - - -
30 1.00 - 3.20 128,000.00 - 3.20 128,000.00 - - -
Total
14.89
11.00 52.80 2,662,000.00
20 0.25 - 4.00 160,000.00 - 4.00 160,000.00 - - -
18 0.50 - - - - - - - - -
1 0.25 - 0.80 32,000.00 - 0.80 32,000.00 - - -
10 0.50 - 2.40 96,000.00 - 0.80 32,000.00 - - -
2 0.25 - 4.00 160,000.00 - - - - - -
3 0.25 - - - - - - - - -
4 0.25 - - - - - - - - -
5 0.04 - - - - - - - - -
6 0.25 - 0.80 32,000.00 - - - - - -
7 0.25 - - - - - - - - -
8 0.25 - 0.80 32,000.00 - - - - - -
9 0.50 - - - - - - - - -
11 1.00 - 8.00 320,000.00 - 8.00 320,000.00 - - -
17 1.00 - - - - - - - - -
12
1.00
2.00 2.40 196,000.00
2.00 2.40 196,000.00 - - -
13 0.60 - - - - - - - - -
14 1.00 - 8.00 320,000.00 - 8.00 320,000.00 - - -
15 0.50 - - - - - - - - -
16 0.50 - 8.00 320,000.00 - 8.00 320,000.00 - - -
3.00 41.60 1,814,000.00 - - -
- 2.40 96,000.00 - - - -
- 0.80 32,000.00 - - - -
- 2.40 96,000.00 - - - - - -
- 8.00 320,000.00 - - - - - -
- 3.20 128,000.00 - - - -
- 4.00 160,000.00 - - - -
- 4.00 160,000.00
- 8.00 320,000.00 - - - -
- 4.00 160,000.00
- 4.00 160,000.00
- 4.00 160,000.00 - - - -
- 1.60 64,000.00 - - - - - -
- 4.00 160,000.00 - - - -
- 4.00 160,000.00 - - - - - -
- 3.20 128,000.00 - - - -
- 3.20 128,000.00 - - - -
0.60
22
4.00 160,000.00
1.00
21
0.25
20
19
23
0.50
18
1.00
17
8.00 320,000.00
0.50
0.25
0.50
1.00
0.50
30
0.16
29
3.20 128,000.00
0.50
28
27
16
0.50
26
0.24
25
8.00 320,000.00
0.50
24
15
0.50
0.25
0.25
6
0.04
5
0.25
4
3
0.25
4.00 160,000.00
0.25
2
0.25
1
Sambungan Lampiran 5a: Penggunaan dan Biaya TKLK Per Petani No Sampel Luas Lahan (Ha) Penyiangan Pemberantasan Hama dan Penyakit Panen Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
7
8
4.00 160,000.00
12
1.00
14
0.60
13
12.00 480,000.00
1.00
1.00
0.25
11
0.50
10
0.50
9
0.80 32,000.00
3.20 128,000.00
Sambungan Lampiran 5a: Penggunaan dan Biaya TKLK Per Petani No Sampel Luas Lahan (Ha) Pencucian &Penjemuran Biaya Total TKLK (Rp) Pria (HKP) Wanita (HKP) Biaya (Rp)
17 1.00 - - - 160,000.00
30 1.00 - - - 512,000.00
29 0.16 - - - -
28 0.50 - - - 716,000.00
27 0.50 - - - -
26 0.50 - - - -
25 0.24 - - - 160,000.00
24 0.50 - - - 872,000.00
23 0.50 - - - -
22 0.25 - - - 64,000.00
21 1.00 - - - 640,000.00
20 0.25 - - - 480,000.00
19 0.60 - - - -
18 0.50 - - - -
16 0.50 - - - 1,280,000.00
1 0.25 - - - 64,000.00
15 0.50 - - - 160,000.00
14 1.00 - - - 960,000.00
13 0.60 - - - -
12 1.00 - - - 1,000,000.00
11 1.00 - - - 960,000.00
10 0.50 - - - 224,000.00
9 0.50 - - - -