DAFTAR ANALISA HARGA SATUAN UPAH BAHAN A

  CI VI L. ENGI NEERI NG Jalan Kabayan No. 50 Sumbawa Besar

DAFTAR ANALI SA HARGA SATUAN UPAH BAHAN

  SNVT : PENATAAN BANGUNAN DAN LI NGKUNGAN PROV. NTB KEGI ATAN : PELAKSANAANPENATAAN BANGUNANDAN LI NGKUNGAN PROV. NTB PEKERJAAN : PEMBANGUNAN PSD REVI TALI SASI KAWASAN PUSAT KOTA SUMBAWA LOKASI : KAWASAN PUSAT KOTA SUMBAWA BESAR KAB. SUMBAWA TAHUN :

  2O13

ANALI SA BI AYA KONSTRUKSI PEKERJAAN PERSI APAN

  No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga

  Analisa jaan Bahan A.1 1 m' Pengukuran dan pemasangan Bowplang

  Bahan 0.012 M³ Kayu Klas I I I Rp. 1,750,000.00 21,000.00 0.020 Kg Paku Rp. 17,500.00 350.00 0.007 M³ Papan Kayu Klas I I Rp. 2,500,000.00 17,500.00

  Jumlah (I ) 38,850.00 Tenaga

  0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00 0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.010 Hari Kepala tukang Rp. 65,000.00 650.00 0.005 Hari Mandor Rp. 72,820.00 364.10

  Jumlah (I I ) 11,414.10 Jumlah (I ) + (I I ) 50,264.10 Over Head 7.5 % 7,539.62 Harga Satuan 57,803.72

  A.2 1 m3 Bongkar Dinding Bata & Konstin Tenaga

  0.100 Hari Tukang Bongkar Rp. 44,000.00 4,400.00 0.100 Hari Mandor Rp. 72,820.00 7,282.00

  Jumlah (I I ) 11,682.00 Jumlah (I ) + (I I ) 69,485.72 Over Head 15 % 10,422.86 Harga Satuan 79,908.57

  A.3 1 m2 Pembersihan Lapangan dan Lokasi Tenaga

  0.050 Hari Tukang Batu Rp. 60,000.00 3,000.00 0.005 Hari Pekerja Rp. 44,000.00 220.00

  Jumlah (I I ) 3,220.00 Jumlah (I ) + (I I ) 3,220.00 Over Head 15 % 483.00 B.1 1m

  3 Galian tanah biasa sedalam 1 meter

  1 m

  0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.010 Hari Mandor Rp. 72,820.00 728.20

  Jumlah (I ) 33,000.00 Tenaga

  Bahan 1.200 M³ Tanah Urug Rp. 27,500.00 33,000.00

  3 Urugan tanah (konversi dari analisa urugan pasir)

  B.6 1 m

  Jumlah (I I ) 13,928.20 Jumlah (I ) + (I I ) 43,928.20 Over Head 15 % 6,589.23 Harga Satuan 50,517.43

  0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.010 Hari Mandor Rp. 72,820.00 728.20

  Jumlah (I ) 30,000.00 Tenaga

  Bahan 1.200 M³ Pasir Rp. 25,000.00 30,000.00

  3 Urugan pasir bawah penutup lantai

  Jumlah (I ) 25,641.00 Over Head 15 % 3,846.15 Harga Satuan 29,487.15 B.5.

  Tenaga 0.750 Hari Pekerja Rp. 44,000.00 33,000.00 0.025 Hari Mandor Rp. 72,820.00 1,820.50

  Tenaga 0.500 Hari Pekerja Rp. 44,000.00 22,000.00 0.050 Hari Mandor Rp. 72,820.00 3,641.00

  3 Pemadatan tanah

  1m

  Mengurug Kembali 1 m3 dihitung dari 1,3 kali dari indek pekerjaan Galian B.4

  3 Urugan kembali

  B.3 1m

  Jumlah (I ) 42,876.90 Over Head 15 % 6,431.54 Harga Satuan 49,308.44

  Tenaga 0.900 Hari Pekerja Rp. 44,000.00 39,600.00 0.045 Hari Mandor Rp. 72,820.00 3,276.90

  3 Galian tanah biasa sedalam 2 meter

  B.2 1m

  Jumlah (I ) 34,820.50 Over Head 15 % 5,223.08 Harga Satuan 40,043.58

  Jumlah (I I ) 13,928.20 Jumlah (I ) + (I I ) 46,928.20 Over Head 15 % 7,039.23 C. ANALI SA BI AYA KONSTRUKSI PONDASI (SNI DT-91-0007-2007)

  Bahan 1.200 M³ Batu belah Rp. 80,000.00 96,000.00

  202.000 Kg Semen Portland Rp. 1,200.00 242,400.00 0.485 M³ pasir pasang Rp. 80,000.00 38,800.00

  Jumlah (I ) 377,200.00 Tenaga

  1.500 Hari Pekerja Rp. 44,000.00 66,000.00 0.600 Hari Tukang batu Rp. 60,000.00 36,000.00 0.060 Hari Kepala Tukang Rp. 65,000.00 3,900.00 0.075 Hari Mandor Rp. 72,820.00 5,461.50

  Jumlah (I I ) 111,361.50 Jumlah (I ) + (I I ) 488,561.50 Over Head 15 % 73,284.23 Harga Satuan 561,845.73

  3

  1m Pasangan Pondasi Batu belah campuran 1 Pc : 5 Ps C.3

  Bahan 1.200 M³ Batu belah Rp. 80,000.00 96,000.00

  136.000 Kg Semen Portland Rp. 1,200.00 163,200.00 0.544 M³ pasir pasang Rp. 80,000.00 43,520.00

  Jumlah (I ) 302,720.00 Tenaga

  1.500 Hari Pekerja Rp. 44,000.00 66,000.00 0.600 Hari Tukang batu Rp. 60,000.00 36,000.00 0.060 Hari Kepala Tukang Rp. 65,000.00 3,900.00 0.075 Hari Mandor Rp. 60,000.00 4,500.00

  Jumlah (I I ) 110,400.00 Jumlah (I ) + (I I ) 413,120.00 Over Head 15 % 61,968.00 Harga Satuan 475,088.00

  C.4 1m3 Pasangan batu kosong (aanstanping) Bahan

  1.200 M³ Batu belah Rp. 80,000.00 96,000.00 0.432 M³ pasir pasang Rp. 80,000.00 34,560.00

  Jumlah (I ) 130,560.00 Tenaga

  0.780 Hari Pekerja Rp. 44,000.00 34,320.00 0.390 Hari Tukang batu Rp. 60,000.00 23,400.00 0.039 Hari Kepala Tukang Rp. 65,000.00 2,535.00 0.075 Hari Mandor Rp. 72,820.00 5,461.50

  Jumlah (I I ) 65,716.50 Jumlah (I ) + (I I ) 196,276.50 Over Head 15 % 29,441.48 Harga Satuan 225,717.98 Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan

  D.1 1m

  Tenaga 0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.100 Hari Tukang batu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.015 Hari Mandor Rp. 72,820.00 1,092.30

  0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.100 Hari Tukang batu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.015 Hari Mandor Rp. 72,820.00 1,092.30

  Jumlah (I ) 46,556.00 Tenaga

  9.680 Kg Semen Portland Rp. 1,200.00 11,616.00 0.043 M³ pasir pasang Rp. 80,000.00 3,440.00

  Bahan 70.000 Bh Bata merah Rp. 450.00 31,500.00

  2 Pasangan bata merah tebal ½ bata. 1 Pc : 5 Ps

  D.3 1m

  Jumlah (I I ) 20,942.30 Jumlah (I ) + (I I ) 72,886.30 Over Head 15 % 10,932.95 Harga Satuan 83,819.25

  0.040 M³ pasir pasang Rp. 80,000.00 3,200.00 Jumlah (I ) 51,944.00

  2 Pasangan bata merah tebal 1 bata. 1 Pc : 3 Ps

  Bahan 70.000 Bh Bata merah Rp. 450.00 31,500.00 14.370 Kg Semen Portland Rp. 1,200.00 17,244.00

  2 Pasangan bata merah tebal ½ bata. 1 Pc : 3 Ps

  D.2 1m

  Jumlah (I I ) 41,884.60 Jumlah (I ) + (I I ) 153,504.60 Over Head 15 % 23,025.69 Harga Satuan 176,530.29

  0.600 Hari Pekerja Rp. 44,000.00 26,400.00 0.200 Hari Tukang batu Rp. 60,000.00 12,000.00 0.020 Hari Kepala Tukang Rp. 65,000.00 1,300.00 0.030 Hari Mandor Rp. 72,820.00 2,184.60

  Jumlah (I ) 111,620.00 Tenaga

  32.950 Kg Semen Portland Rp. 1,200.00 39,540.00 0.091 M³ pasir pasang Rp. 80,000.00 7,280.00

  Bahan 144.000 Bh Bata merah Rp. 450.00 64,800.00

  Jumlah (I I ) 20,942.30 Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan

  E.1 1m

  Jumlah (I I ) 25,686.66 Jumlah (I ) + (I I ) 35,850.66 Over Head 15 % 5,377.60 Harga Satuan 41,228.26

  2 Finishing siar pasangan batu kali 1Pc : 2 Ps

  E.6 1m

  Jumlah (I I ) 19,503.20 Jumlah (I ) + (I I ) 26,460.80 Over Head 15 % 3,969.12 Harga Satuan 30,429.92

  0.200 Hari Pekerja Rp. 44,000.00 8,800.00 0.150 Hari Tukang batu Rp. 60,000.00 9,000.00 0.015 Hari Kepala Tukang Rp. 65,000.00 975.00 0.010 Hari Mandor Rp. 72,820.00 728.20

  Jumlah (I ) 6,957.60 Tenaga

  Bahan 5.148 Kg Semen Portland Rp. 1,200.00 6,177.60 0.026 M³ Tanah Paras Rp. 30,000.00 780.00

  2 Plesteran 1 Pc : 5 Ps tebal 15 mm.

  E.3 1m

  0.260 Hari Pekerja Rp. 44,000.00 11,440.00 0.200 Hari Tukang batu Rp. 60,000.00 12,000.00 0.020 Hari Kepala Tukang Rp. 65,000.00 1,300.00 0.013 Hari Mandor Rp. 72,820.00 946.66

  2 Plesteran 1 Pc : 3 Ps tebal 15 mm.

  Jumlah (I ) 10,164.00 Tenaga

  Bahan 7.070 Kg Semen Portland Rp. 1,200.00 8,484.00 0.021 M³ Pasir pasang Rp. 80,000.00 1,680.00

  2 Plesteran 1 Pc : 3 Ps tebal 15 mm.

  E.2 1m

  Jumlah (I I ) 19,503.20 Jumlah (I ) + (I I ) 30,655.20 Over Head 15 % 4,598.28 Harga Satuan 35,253.48

  0.200 Hari Pekerja Rp. 44,000.00 8,800.00 0.150 Hari Tukang batu Rp. 60,000.00 9,000.00 0.015 Hari Kepala Tukang Rp. 65,000.00 975.00 0.010 Hari Mandor Rp. 72,820.00 728.20

  Jumlah (I ) 11,152.00 Tenaga

  Bahan 7.760 Kg Semen Portland Rp. 1,200.00 9,312.00 0.023 M³ Pasir pasang Rp. 80,000.00 1,840.00

  Bahan Analisa jaan Bahan E.7

  1m

  Jumlah (I ) 2,796,875.00 Tenaga

  0.8000 Hari Pekerja Rp. 44,000.00 35,200.00 2.0000 Hari Tukang kayu Rp. 60,000.00 120,000.00 0.2000 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00 0.0400 Hari Mandor Rp. 72,820.00 2,912.80

  , Jumlah (I ) 178,750.00 Tenaga

  Bahan 0.0240 m³ Papan Kayu Klas I I Rp. 2,500,000.00 60,000.00 0.3000 Kg Lem kayu Rp. 25,000.00 7,500.00 0.8900 M2 Kaca 3 mm (bening) Rp. 125,000.00 111,250.00

  2 Membuat dan memasang Pintu dan jendela kaca kayu klas I I

  F.3 1m

  Jumlah (I I ) 1,615,846.00 Jumlah (I ) + (I I ) 4,412,721.00 Over Head 15 % 661,908.15 Harga Satuan 5,074,629.15

  2.000 Hari Kepala Tukang kayu Rp. 65,000.00 130,000.00 0.300 Hari Mandor Rp. 72,820.00 21,846.00

  6.000 Hari Pekerja Rp. 44,000.00 264,000.00 20.000 Hari Tukang kayu Rp. 60,000.00 1,200,000.00

  Bahan 1.100 m³ Kayu Klas I I Rp. 2,500,000.00 2,750,000.00 1.250 Kg Paku Rp. 17,500.00 21,875.00 1.000 Kg Lem Kayu Rp. 25,000.00 25,000.00

  2

  3 Membuat dan memasang Kusen Pintu dan kusen Jemdela kayu I I

  1m

  F. ANALI SA BI AYA KONSTRUKSI PEKERJAAN KAYU (SNI DT 91-0011-2007) F.1

  Jumlah (I I ) 13,832.56 Jumlah (I ) + (I I ) 17,732.56 Over Head 15 % 2,659.88 Harga Satuan 20,392.44

  Tenaga 0.150 Hari Pekerja Rp. 44,000.00 6,600.00 0.100 Hari Tukang batu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.008 Hari Mandor Rp. 72,820.00 582.56

  0.00 Jumlah (I ) 3,900.00

  

0.031 M³ Pasir pasang Rp. 80,000.00

  3.250 Kg Semen Portland Rp. 1,200.00 3,900.00

  memasang acian Bahan

  Jumlah (I I ) 171,112.80 Analisa jaan Bahan F.4 1m2 Memasang jelusi kayu klas I I

  Bahan 0.060 m³ Papan Kayu Kls I I Rp. 2,500,000.00 150,000.00 0.150 Kg Paku Rp. 17,500.00 2,625.00

  Jumlah (I ) 152,625.00 Tenaga

  0.5000 Hari Pekerja Rp. 44,000.00 22,000.00 2.0000 Hari Tukang kayu Rp. 60,000.00 120,000.00 0.2000 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00 0.0250 Hari Mandor Rp. 72,820.00 1,820.50

  Jumlah (I I ) 156,820.50 Jumlah (I ) + (I I ) 309,445.50 Over Head 15 % 46,416.83 Harga Satuan 355,862.33

  F.5 1m2 Membuat daun pintu double tacwood rangka kayu klas I I Bahan

  0.025 m3 Papan Kayu Kls I I Rp. 2,500,000.00 62,500.00 0.030 Kg Paku Rp. 17,500.00 525.00 0.500 Kg Lem Kayu Rp. 25,000.00 12,500.00 1.000 Lbr Tecwood 90 x220 x 4 mm Rp. 75,000.00 75,000.00

  Jumlah (I ) 150,525.00 Tenaga

  0.800 Hari Pekerja Rp. 44,000.00 35,200.00 2.000 Hari Tukang kayu Rp. 60,000.00 120,000.00 0.200 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00 0.030 Hari Mandor Rp. 72,820.00 2,184.60

  Jumlah (I I ) 170,384.60 Jumlah (I ) + (I I ) 320,909.60 Over Head 15 % 48,136.44 Harga Satuan 369,046.04

  F.10 1m

  Bahan 1.1000 m3 Kayu Klas I I Rp. 2,500,000.00 2,750,000.00

  15.0000 Bh Begel Plat Rp. 3,500.00 52,500.00 5.6000 Kg Paku Rp. 17,500.00 98,000.00

  Jumlah (I ) 2,900,500.00 Tenaga

  4.0000 Hari Pekerja Rp. 44,000.00 176,000.00 12.0000 Hari Tukang kayu Rp. 60,000.00 720,000.00

  1.2000 Hari Kepala Tukang kayu Rp. 65,000.00 78,000.00 0.2000 Hari Mandor Rp. 72,820.00 14,564.00

  Jumlah (I I ) 988,564.00 Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan

  F.11 1m

  Jumlah (I ) 3,955,000.00 Tenaga

  2.4000 Hari Pekerja Rp. 44,000.00 105,600.00 7.2000 Hari Tukang kayu Rp. 60,000.00 432,000.00 0.7200 Hari Kepala Tukang Rp. 65,000.00 46,800.00 0.1200 Hari Mandor Rp. 72,820.00 8,738.40

  Jumlah (I ) 2,855,000.00 Tenaga

  15.000 Bh Begel Plat Rp. 3,500.00 52,500.00 3.000 Kg Paku Rp. 17,500.00 52,500.00

  Bahan 1.100 m³ Kayu Klas I Rp. 2,500,000.00 2,750,000.00

  3 Memasang Konstruksi gording kayu klas I I

  F.12a 1m

  Jumlah (I I ) 593,138.40 Jumlah (I ) + (I I ) 4,548,138.40 Over Head 15 % 682,220.76 Harga Satuan 5,230,359.16

  2.4000 Hari Pekerja Rp. 44,000.00 105,600.00 7.2000 Hari Tukang kayu Rp. 60,000.00 432,000.00 0.7200 Hari Kepala Tukang kayu Rp. 65,000.00 46,800.00 0.1200 Hari Mandor Rp. 72,820.00 8,738.40

  15.000 Bh Begel Plat Rp. 3,500.00 52,500.00 3.000 Kg Paku Rp. 17,500.00 52,500.00

  3

  Bahan 1.100 m³ Kayu Klas I Rp. 3,500,000.00 3,850,000.00

  3 Memasang Konstruksi gording kayu klas I

  F.12 1m

  Jumlah (I I ) 1,615,846.00 Jumlah (I ) + (I I ) 4,766,346.00 Over Head 15 % 714,951.90 Harga Satuan 5,481,297.90

  20.000 Hari Tukang kayu Rp. 60,000.00 1,200,000.00 2.000 Hari Kepala Tukang kayu Rp. 65,000.00 130,000.00 0.300 Hari Mandor Rp. 72,820.00 21,846.00

  Tenaga 6.000 Hari Pekerja Rp. 44,000.00 264,000.00

  5.600 Kg Paku Rp. 17,500.00 98,000.00 Jumlah (I ) 3,150,500.00

  1.200 m3 Kayu Klas I I Rp. 2,500,000.00 3,000,000.00 15.000 Bh Begel Plat Rp. 3,500.00 52,500.00

  memasang Konstruksi kuda-kuda ekspose kayu klas I I Bahan

  Jumlah (I I ) 593,138.40 Jumlah (I ) + (I I ) 3,448,138.40 Over Head 15 % 517,220.76

  3 F.13 1m Memasang rangka atap multi roof usuk klas I I dan reng kayu Klas I

  Bahan 0.014 m³ Kayu Klas I I Rp. 2,500,000.00 35,000.00 0.009 m³ Kayu Klas I Rp. 3,500,000.00 31,500.00 1.200 kg Paku Rp. 17,500.00 21,000.00

  Jumlah (I ) 87,500.00 Tenaga

  0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.005 Hari Mandor Rp. 72,820.00 364.10

  Jumlah (I I ) 11,414.10 Jumlah (I ) + (I I ) 98,914.10 Over Head 15 % 14,837.12 Harga Satuan 113,751.22

  3 F.14 1m Memasang rangka langit-langit (60x60) cm kayu klas I I

  Bahan 0.016 m³ Kayu Klas I I Rp. 2,500,000.00 40,000.00 0.250 Kg Paku Rp. 17,500.00 4,375.00

  Jumlah (I ) 44,375.00 Tenaga

  0.200 Hari Pekerja Rp. 44,000.00 8,800.00 0.300 Hari Tukang kayu Rp. 60,000.00 18,000.00 0.030 Hari Kepala Tukang Rp. 65,000.00 1,950.00 0.010 Hari Mandor Rp. 72,820.00 728.20

  Jumlah (I I ) 29,478.20 Jumlah (I ) + (I I ) 73,853.20 Over Head 15 % 11,077.98 Harga Satuan 84,931.18

  Bahan 0.011 m³ Kayu klas I Rp. 3,500,000.00 38,500.00 0.100 Kg Paku Rp. 17,500.00 1,750.00 Jumlah (I) 40,250.00

  Tenaga 0.010 Oh Pekerja Rp. 44,000.00 440.00 0.200 Oh Tukang kayu Rp. 60,000.00 12,000.00 0.025 Oh Kepala Tukang Rp. 65,000.00 1,625.00 0.005 Oh Mandor Rp. 72,820.00 364.10 Jumlah (II) 14,429.10

  Jumlah (I) + (II) 54,679.10

  Over Head 15 % 8,201.87

  Harga Satuan 62,880.97 Analisa jaan Bahan G.1 1 m

  3 Membuat lantai kerja beton mutu (K100) stum (3-6) cm wc = 0,87

  Tenaga 1.650 Hari Pekerja Rp. 44,000.00 72,600.00 0.275 Hari Tukang batu Rp. 60,000.00 16,500.00 0.280 Hari Kepala Tukang Batu Rp. 65,000.00 18,200.00

  Tenaga 1.650 Hari Pekerja Rp. 44,000.00 72,600.00 0.275 Hari Tukang batu Rp. 60,000.00 16,500.00 0.280 Hari Kepala Tukang Batu Rp. 65,000.00 18,200.00

  215.000 liter Air Bersih Rp. 250.00 53,750.00 Jumlah (I ) 601,310.00

  0.622 m³ Pasir Cor Rp. 80,000.00 49,760.00 0.754 m³ Kerikil Rp. 100,000.00 75,400.00

  Bahan 352.000 Kg Semen Rp. 1,200.00 422,400.00

  3 Membuat lantai kerja beton mutu Fc = 16,9 (K200) stum (12-2) cm wc = 0,61

  G.3 1 m

  0.8300 Hari Mandor Rp. 72,820.00 60,440.60 Jumlah (I I ) 167,740.60 Jumlah (I ) + (I I ) 732,341.39 Over Head 15 % 109,851.21 Harga Satuan 842,192.60

  215.000 liter Air Bersih Rp. 250.00 53,750.00 Jumlah (I ) 564,600.79

  Bahan 230.000 Kg Semen Rp. 1,200.00 276,000.00

  0.543 m³ Pasir Cor Rp. 80,000.00 43,428.57 0.762 m³ Kerikil Rp. 100,000.00 76,222.22

  Bahan 326.000 Kg Semen Rp. 1,200.00 391,200.00

  3 Membuat lantai kerja beton mutu Fc = 14,5 (K175) stum (12-2) cm wc = 0,66

  G.2 1 m

  0.8800 Hari Mandor Rp. 72,820.00 64,081.60 Jumlah (I I ) 130,181.60 Jumlah (I ) + (I I ) 533,821.60 Over Head 15 % 80,073.24 Harga Satuan 613,894.84

  1.200 Hari Pekerja Rp. 44,000.00 52,800.00 0.200 Hari Tukang batu Rp. 60,000.00 12,000.00 0.020 Hari Kepala Tukang Batu Rp. 65,000.00 1,300.00

  Jumlah (I ) 403,640.00 Tenaga

  0.638 M³ Pasir Cor Rp. 80,000.00 51,040.00 0.761 M³ Kerikil Rp. 100,000.00 76,100.00 2.000 Ltr Air Kerja Rp. 250.00 500.00

  0.0830 Hari Mandor Rp. 72,820.00 6,044.06 Jumlah (I I ) 113,344.06 Jumlah (I ) + (I I ) 714,654.06 Over Head 15 % 107,198.11 Bahan 1.050 Kg Besi beton Rp. 9,500.00 9,975.00 0.015 Kg Kawat Beton Rp. 17,500.00 262.50

  Jumlah (I ) 10,237.50 Tenaga

  5.300 Hari Pekerja Rp. 44,000.00 233,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.300 Hari Tukang kayu Rp. 60,000.00 78,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.262 Hari Kepala Tukang Besi Rp. 65,000.00 17,030.00 0.265 Hari Mandor Rp. 72,820.00 19,297.30

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00

  139.236 Kg Besi Beton Rp. 9,500.00 1,322,742.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00

  Bahan 0.200 M³ Kayu klas I I I Rp. 1,750,000.00 350,000.00 1.500 Kg Paku Rp. 17,500.00 26,250.00 0.400 Ltr Minyak bekisting Rp. 3,500.00 1,400.00

  3 Membuat Pondasi Beton Bertulang (PI )= Besi + 139,236 Kg

  G.6.a 1 m

  Jumlah (I I ) 427,027.30 Jumlah (I ) + (I I ) 2,073,521.30 Over Head 15 % 311,028.20 Harga Satuan 2,384,549.50

  Jumlah (I ) 1,646,494.00 Tenaga

  0.007 Hari Pekerja Rp. 44,000.00 308.00 0.007 Hari Tukang besi Rp. 60,000.00 420.00 0.007 Hari Kepala Tukang Besi Rp. 65,000.00 455.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00

  73.902 Kg Besi Beton Rp. 9,500.00 702,069.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00

  Bahan 0.200 M³ Kayu klas I I I Rp. 1,750,000.00 350,000.00 1.500 Kg Paku Rp. 17,500.00 26,250.00 0.400 Ltr Minyak bekisting Rp. 3,500.00 1,400.00

  3 Membuat Pondasi Beton Bertulang (PI )= Besi + 133,06 Kg

  G.6 1 m

  0.0040 Hari Mandor Rp. 72,820.00 291.28 Jumlah (I I ) 1,474.28 Jumlah (I ) + (I I ) 11,711.78 Over Head 15 % 1,756.77 Harga Satuan 13,468.55

  Jumlah (I ) 2,267,167.00 G.7.a 1 m

  3 Membuat sloof Beton Bertulang 20/ 35 Besi = 190,316 Kg

  Bahan 0.267 M³ Kayu klas I I I Rp. 1,750,000.00 467,250.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00

  252.850 Kg Besi Beton Rp. 9,500.00 2,402,075.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00

  Jumlah (I ) 3,486,325.00 Tenaga

  5.600 Hari Pekerja Rp. 44,000.00 246,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06

  Jumlah (I I ) 482,103.06 Jumlah (I ) + (I I ) 3,968,428.06 Over Head 15 % 595,264.21 Harga Satuan 4,563,692.27

  G.7.b 1 m

  3 Membuat sloof Beton Bertulang 20/ 35 Besi = 243,389 Kg

  Bahan 0.267 M³ Kayu klas I I I Rp. 1,750,000.00 467,250.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00

  243.000 Kg Besi Beton Rp. 9,500.00 2,308,500.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00

  Jumlah (I ) 3,392,750.00 Tenaga

  5.600 Hari Pekerja Rp. 44,000.00 246,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06

  Jumlah (I I ) 482,103.06 Jumlah (I ) + (I I ) 3,874,853.06 Over Head 15 % 581,227.96 Harga Satuan 4,456,081.02 G.7.c 1 m

  3 Membuat sloof Beton Bertulang 15/ 20 Besi = 157,961 Kg

  Bahan 0.308 M³ Kayu klas I I I Rp. 1,750,000.00 539,000.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00

  157.961 Kg Besi Beton Rp. 9,500.00 1,500,629.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00

  Jumlah (I ) 2,656,629.50 Tenaga

  5.650 Hari Pekerja Rp. 44,000.00 248,600.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06

  Jumlah (I I ) 484,303.06 Jumlah (I ) + (I I ) 3,140,932.56 Over Head 15 % 471,139.88 Harga Satuan 3,612,072.44

  G.7.d 1 m

  3 Membuat sloof/ ring balok/ baok latai Beton Bertulang 10/ 15 279.88 Kg besi + bekesting

  Bahan 0.400 M³ Kayu klas I I I Rp. 1,750,000.00 700,000.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00

  279.890 Kg Besi Beton Rp. 9,500.00 2,658,955.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00

  Jumlah (I ) 3,975,955.00 Tenaga

  5.650 Hari Pekerja Rp. 44,000.00 248,600.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06

  Jumlah (I I ) 484,303.06 Jumlah (I ) + (I I ) 4,460,258.06 Over Head 15 % 669,038.71 Harga Satuan 5,129,296.77 G.7.d1 1 m

  3 Membuat sloof Beton Bertulang 20/ 30 132.43 kg Besi begisting

  Bahan 0.200 M³ Kayu klas I I I Rp. 1,750,000.00 350,000.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00

  252.850 Kg Besi Beton Rp. 9,500.00 2,402,075.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00

  Jumlah (I ) 3,369,075.00 Tenaga

  5.650 Hari Pekerja Rp. 44,000.00 248,600.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06

  Jumlah (I I ) 484,303.06 Jumlah (I ) + (I I ) 3,853,378.06 Over Head 15 % 578,006.71 Harga Satuan 4,431,384.77

  G.8.b 1 m

  3 Membuat kolom beton Bertulang 20/ 20 = 421.72 kg (lantai I )

  Bahan 0.250 M³ Kayu klas I I I Rp. 1,750,000.00 437,500.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00

  156.030 Kg Besi Beton Rp. 9,500.00 1,482,285.00 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas I I Rp. 2,500,000.00 375,000.00 3.600 Lbr triplek 9 mm Rp. 125,000.00 450,000.00

  20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I ) 3,597,935.00

  Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46

  Jumlah (I I ) 603,600.46 Jumlah (I ) + (I I ) 4,201,535.46 Over Head 15 % 630,230.32 G.8.c 1 m

  3 Membuat kolom beton Bertulang 20/ 20 = 219.088 kg (lantai I I )

  Bahan 0.200 M³ Kayu klas I I I Rp. 1,750,000.00 350,000.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00

  156.030 Kg Besi Beton Rp. 9,500.00 1,482,285.00 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas I I Rp. 2,500,000.00 375,000.00 3.500 Lbr triplek 9 mm Rp. 125,000.00 437,500.00

  20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I ) 3,497,935.00

  Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46

  Jumlah (I I ) 603,600.46 Jumlah (I ) + (I I ) 4,101,535.46 Over Head 15 % 615,230.32 Harga Satuan 4,716,765.78

  G.8.h 1 m

  3 Membuat kolom beton Bertulang 15/ 20 besi = 170.667 kg

  Bahan 0.400 M³ Kayu klas I I I Rp. 1,750,000.00 700,000.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00

  170.667 Kg Besi Beton Rp. 9,500.00 1,621,336.50 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas I I Rp. 2,500,000.00 375,000.00 3.500 Lbr triplek 9 mm Rp. 125,000.00 437,500.00

  20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I ) 3,986,986.50

  Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46 G.8.j 1 m

  3 Membuat kolom beton Bertulang 13/ 13 besi = 187.574 kg

  Bahan 0.267 M³ Kayu klas I I I Rp. 1,750,000.00 467,250.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00

  187.574 Kg Besi Beton Rp. 9,500.00 1,781,953.00 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas I I Rp. 2,500,000.00 375,000.00 5.340 Lbr triplek 9 mm Rp. 125,000.00 667,500.00

  20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I ) 4,144,853.00

  Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46

  Jumlah (I I ) 603,600.46 Jumlah (I ) + (I I ) 4,748,453.46 Over Head 15 % 712,268.02 Harga Satuan 5,460,721.48

  G.9.b 1 m

  3 Membuat balok beton bertulang 20/ 30 = 193.98 besi + begisting

  Bahan 0.167 M³ Kayu klas I I I Rp. 1,750,000.00 292,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  193.977 Kg Besi Beton Rp. 9,500.00 1,842,781.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I ) 3,612,531.50

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 G.9.c 1 m

  3 Membuat balok beton bertulang 13/ 30 = 169.94 besi + begisting

  Bahan 0.167 M³ Kayu klas I I I Rp. 1,750,000.00 292,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  169.940 Kg Besi Beton Rp. 9,500.00 1,614,430.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I ) 3,384,180.00

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76

  Jumlah (I I ) 523,701.76 Jumlah (I ) + (I I ) 3,907,881.76 Over Head 15 % 586,182.26 Harga Satuan 4,494,064.02

  G.9.d 1 m

  3 Membuat balok beton bertulang 13/ 80 = 132.05 besi + begisting

  Bahan 0.500 M³ Kayu klas I I I Rp. 1,750,000.00 875,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  132.053 Kg Besi Beton Rp. 9,500.00 1,254,503.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I ) 3,607,003.50

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 G.9.e 1 m

  3 Membuat balok beton bertulang 25/ 40 = 202.72 besi + begisting

  Bahan 0.200 M³ Kayu klas I I I Rp. 1,750,000.00 350,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  202.720 Kg Besi Beton Rp. 9,500.00 1,925,840.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I ) 3,753,340.00

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76

  Jumlah (I I ) 523,701.76 Jumlah (I ) + (I I ) 4,277,041.76 Over Head 15 % 641,556.26 Harga Satuan 4,918,598.02

  G.9.f 1 m

  3 Membuat balok beton bertulang 25/ 50 = 240.76kg besi + begisting

  Bahan 0.200 M³ Kayu klas I I I Rp. 1,750,000.00 350,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  240.760 Kg Besi Beton Rp. 9,500.00 2,287,220.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I ) 4,114,720.00

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 G.9.h 1 m

  3 Membuat balok beton bertulang 20/ 30 = 238.19 besi + begisting

  Bahan 0.250 M³ Kayu klas I I I Rp. 1,750,000.00 437,500.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  238.190 Kg Besi Beton Rp. 9,500.00 2,262,805.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I ) 4,177,805.00

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76

  Jumlah (I I ) 523,701.76 Jumlah (I ) + (I I ) 4,701,506.76 Over Head 15 % 705,226.01 Harga Satuan 5,406,732.77

  G.10 1 m

  3 Membuat kolom praktis (10/ 10) cm

  Bahan 0.008 M³ Kayu klas I I I Rp. 1,750,000.00 14,000.00 0.010 Kg Paku Rp. 17,500.00 175.00 2.689 Kg Besi Beton Rp. 9,500.00 25,545.50 0.450 Kg Kawat Beton Rp. 17,500.00 7,875.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 2,500,000.00 7,000,000.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 125,000.00 2,000,000.00 Jumlah (I ) 924,995.50

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 0.020 Hari Tukang Besi Rp. 60,000.00 1,200.00 0.006 Hari Kepala Tukang Besi Rp. 65,000.00 390.00 0.003 Hari Mandor Rp. 72,820.00 218.46

  Jumlah (I I ) 396,708.46 G.11 1 m

  3 Membuat balok beton bertulang (10/ 15) cm

  Bahan 0.385 M³ Kayu klas I I I Rp. 1,750,000.00 673,750.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  207.619 Kg Besi Beton Rp. 9,500.00 1,972,380.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas I I Rp. 2,500,000.00 350,000.00 8.940 Lbr triplek 9 mm Rp. 125,000.00 1,117,500.00

  16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I ) 4,891,130.50

  Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76

  Jumlah (I I ) 523,701.76 Jumlah (I ) + (I I ) 5,414,832.26 Over Head 15 % 812,224.84 Harga Satuan 6,227,057.10

  G.12a 1 m

  3 Membuat lantai beton bertulang tebal 12 cm 162.252 kg besi + begisting

  Bahan 0.250 M³ Kayu klas I I I Rp. 1,750,000.00 437,500.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  162.252 Kg Besi Beton Rp. 9,500.00 1,541,394.00 2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas I I Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I ) 3,513,444.00

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 G.12b 1 m

  3 Membuat lantai beton bertulang tebal 10 cm 181.49 kg besi + begisting

  Bahan 0.300 M³ Kayu klas I I I Rp. 1,750,000.00 525,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  181.490 Kg Besi Beton Rp. 9,500.00 1,724,155.00 2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas I I Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I ) 3,783,705.00

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70

  Jumlah (I I ) 547,971.70 Jumlah (I ) + (I I ) 4,331,676.70 Over Head 15 % 649,751.51 Harga Satuan 4,981,428.21

  G.12c 1 m

  3 Membuat lantai beton bertulang tebal 15 cm 241.51 kg besi + begisting

  Bahan 0.200 M³ Kayu klas I I I Rp. 1,750,000.00 350,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  241.515 Kg Besi Beton Rp. 9,500.00 2,294,392.50 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas I I Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I ) 4,174,567.50

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 G.12d 1 m

  3 Membuat lantai beton bertulang tebal 20 cm 181.14 kg besi + begisting

  Bahan 0.150 M³ Kayu klas I I I Rp. 1,750,000.00 262,500.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  181.140 Kg Besi Beton Rp. 9,500.00 1,720,830.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas I I Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I ) 3,513,505.00

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70

  Jumlah (I I ) 547,971.70 Jumlah (I ) + (I I ) 4,061,476.70 Over Head 15 % 609,221.51 Harga Satuan 4,670,698.21

  G.14a 1 m

  3 Membuat lantai rabat beton bertulang tebal 10 cm 181.49 kg besi + begisting

  Bahan 53.303 Kg Besi Beton Rp. 9,500.00 506,378.50

  2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 323.000 Kg Semen Rp. 1,200.00 387,600.00

  0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas I I Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00

  32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I ) 1,974,953.50

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70

  Jumlah (I I ) 547,971.70 Jumlah (I ) + (I I ) 2,522,925.20 Over Head 15 %

  0.00 G.14b 1 m

  3 Membuat lantai rabat beton bertulang tebal 12 cm 162.252 kg besi + begisting

  Bahan 83.266 Kg Besi Beton Rp. 9,500.00 791,027.00

  2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 323.000 Kg Semen Rp. 1,200.00 387,600.00

  0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00

  Jumlah (I ) 1,337,602.00 Tenaga

  5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70

  Jumlah (I I ) 379,971.70 Jumlah (I ) + (I I ) 1,717,573.70 Over Head 15 % 257,636.06 Harga Satuan 1,975,209.76

  G.12f 1 m

  3 Membuat plat topian tebal 8 cm 150.62 kg besi + begisting

  Bahan 0.375 M³ Kayu klas I I I Rp. 1,750,000.00 656,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  150.622 Kg Besi Beton Rp. 9,500.00 1,430,909.00 2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas I I Rp. 2,500,000.00 300,000.00 4.340 Lbr triplek 9 mm Rp. 125,000.00 542,500.00

  32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I ) 3,814,209.00

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70

  Jumlah (I I ) 547,971.70 Jumlah (I ) + (I I ) 4,362,180.70 Over Head 15 % 654,327.11 Harga Satuan 5,016,507.81 G.12g 1 m

  3 Membuat beton Lisplank tebal 7/ 50 cm 139.16 kg besi + begisting

  Bahan 0.375 M³ Kayu klas I I I Rp. 1,750,000.00 656,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00

  150.622 Kg Besi Beton Rp. 9,500.00 1,430,909.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas I I Rp. 2,500,000.00 300,000.00 9.920 Lbr triplek 9 mm Rp. 125,000.00 1,240,000.00

  32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I ) 4,507,334.00

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70

  Jumlah (I I ) 547,971.70 Jumlah (I ) + (I I ) 5,055,305.70 Over Head 15 % 758,295.86 Harga Satuan 5,813,601.56

  G.13b 1 m

  3 Membuat Foot beton bertulang 150 x150 139.16 Kg besi + Begisting

  Bahan 0.120 M³ Kayu klas I I I Rp. 1,750,000.00 210,000.00 3.000 Kg Paku Rp. 17,500.00 52,500.00 1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00

  139.160 Kg Besi Beton Rp. 9,500.00 1,322,020.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.105 M³ Kayu klas I I Rp. 2,500,000.00 262,500.00 2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00

  14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00 Jumlah (I ) 2,842,420.00

  Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.300 Hari Tukang kayu Rp. 60,000.00 138,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.405 Hari Kepala Tukang Besi Rp. 65,000.00 26,325.00 0.202 Hari Mandor Rp. 72,820.00 14,709.64 G.13c 1 m

  3 Membuat Foot beton bertulang 120 x120 155.43 Kg besi + Begisting

  Bahan 0.120 M³ Kayu klas I I I Rp. 1,750,000.00 210,000.00 3.000 Kg Paku Rp. 17,500.00 52,500.00 1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00

  155.430 Kg Besi Beton Rp. 9,500.00 1,476,585.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00

  323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.105 M³ Kayu klas I I Rp. 2,500,000.00 262,500.00 2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00

  14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00 Jumlah (I ) 2,996,985.00