ANALISIS KAPASITAS PELABUHAN BAKAUHENI SETELAH PEMBANGUNAN DERMAGA VI

ABSTRACT

ANALYZING CAPACITY OF BAKAUHENI PORT AFTER
PIER VI CONSTRUCTION

Oleh

Galuh pramita

Bakauheni port located in Lampung Province has a very important role for the
growth and development of Lampung Province. Bakauheni port - Merak is one of
busy ferry ports. Bakauheni port - Merak separated by the Sunda Straits which
has a distance of 16 miles (25.75 km) can be reached with 120 minutes, but if it
was an increase in passenger flow travel time can be increased to 3 hours for
dock not available well.
Amount of pier in the port of Bakauheni to meet the needs of the crossing, causing
a queue of vehicles, especially if it's going peak. Therefore, it is necessary to
increase the dock in the port of Bakauheni in order to reduce queues of vehicles
wanting to cross over to the island of Java.
The calculations were performed by analyzing the capacity of the Port Bakauheni
existing conditions, analyzing Bakauheni Port capacity after construction of piers

VI and analyze the capacity of the Port of Bakauheni in 2020. The results

obtained Bakauheni Port at this point the mixture can take across 11 891 vehicles
during peak, port capacity after Pier VI is as much a mixture of 13.066 vehicles in
one day and amount of vehicles in the Port Bakauheni are blends of 15 144
vehicles at peak flow in 2020.
Key words : Port Capacity, crossing

ABSTRAK

ANALISIS KAPASITAS PELABUHAN BAKAUHENI SETELAH
PEMBANGUNAN DERMAGA VI

Oleh

Galuh pramita

Pelabuhan Bakauheni yang terletak di Provinsi Lampung memiliki peranan yang
sangat penting bagi pertumbuhan dan perkembangan Provinsi Lampung.
Pelabuhan penyeberangan Bakauheni – Merak merupakan salah satu pelabuhan

penyeberangan yang sangat padat. Pelabuhan Bakauheni – Merak dipisahkan
oleh Selat Sunda yang mempunyai jarak 16 mil (25.75 km) dapat ditempuh
dengan 120 menit namun jika sedang terjadi peningkatan arus penumpang waktu
tempuh bisa bertambah hingga 3 jam karena dermaga yang tersedia belum
optimal berjalan.
Jumlah dermaga yang tidak mencukupi di Pelabuhan Bakauheni untuk memenuhi
kebutuhan penyeberangan sehingga menyebabkan terjadi antrian kendaraan
terutama jika sedang terjadi arus puncak. Oleh karena itu perlu dilakukan
penambahan dermaga di Pelabuhan Bakauheni agar dapat mengurangi antrian
kendaraan yang ingin menyeberang ke Pulau Jawa.
Perhitungan yang dilakukan dengan menganalisis kapasitas Pelabuhan
Bakauheni kondisi sekarang, menganisis kapasitas Pelabuhan Bakauheni setelah
pembangunan dermaga VI dan menganalisis kapasitas Pelabuhan bakauheni

pada tahun 2020 . Hasil yang didapat Pelabuhan Bakauheni pada saat ini dapat
menyeberangkan 11.891 kendaraan campuran pada waktu arus puncak ,kapasitas
pelabuhan setelah Dermaga VI adalah sebanyak 13,066 kendaraan campuran
dalam satu harinya dan jumlah arus kendaraan di Pelabuhan Bakauheni adalah
15.144 kendaraan canpuran pada arus puncak di tahun 2020.


Kata kunci : Kapasita Pelabuhan, Penyeberangan

ANALISIS KAPASITAS PELABUHAN BAKAUHENI SETELAH
PEMBANGUNAN DERMAGA VI

Oleh
GALUH PRAMITA

Skripsi
Sebagai Salah Satu Syarat Untuk Mencapai Gelar
Sarjana Teknik
Pada
Jurusan Teknik Sipil
Fakultas Teknik Universitas Lampung

FAKULTAS TEKNIK
UNIVERSITAS LAMPUNG
BANDAR LAMPUNG
2015


ANALISIS KAPASITAS PELABUHAN BAKAUHENI SETELAH
PEMBANGUNAN DERMAGA VI
(Skripsi)

Oleh
GALUH PRAMITA

JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS LAMPUNG
2015

DAFTAR GAMBAR

Halaman
Gambar 1. Layout Pelabuhan Penyeberangan Bakauheni .............................. ..6
Gambar 2. Kondisi Eksisting Pelabuhan Penyeberangan Bakauheni .................23
Gambar 3. Diagram Alir Penelitian ....................................................................28
Gambar 4. Layout Dermaga dan Lapangan Parkir Pelabuhan Penyeberangan
Bakauheni ..........................................................................................31

Gambar 5. Kendaraan di kantong Parkir A Pelabuhan Penyeberangan
Bakauheni ..........................................................................................32
Gambar 6. Kendaraan di pintu loket ...................................................................32
Gambar 7. Grafik Data Angkutan kendaraan 2010-2014 Pelabuhan
Penyeberangan Bakauheni.................................................................35
Gambar 8. Angkutan Penyeberangan Dermaga VI pada siang hari dan malam
hari di Pelabuhan Bakauheni .............................................................35
Gambar 9. Grafik Angkutan Lebaran pada Hari Puncak tahun 2012 - 2014......36
Gambar 10. Arus Angkutan Lebaran di kantong parkir A dan G tahun 2015 ....37
Gambar 11. Diagram Data Angkutan Lebaran tahun 2012.................................39
Gambar 12. Diagram Data Angkutan Lebaran tahun 2013.................................40
Gambar 13. Diagram Data Angkutan Lebaran tahun 2014.................................42
Gambar 14. Diagram Data Angkutan Lebaran tahun 2015.................................43
Gambar 15. Diagram Data Angkutan Kendaraan yang Melintasi Pelabuhan
Bakauheni pada Lebaran tahun 2012-2015.....................................44
Gambar 16. Dermaga VI Pelabuhan Bakauheni .................................................48

v

Gambar 17. Model Perhitungan Jumlah Kendaraan yang Melintasi

Pelabuhan Bakuheni .......................................................................58
Gambar 18. Hasil Perhitungan Jumlah Kendaraan yang Melintasi
Pelabuhan Bakauheni .....................................................................59
Gambar 19. Model Perhitungan Jumlah Kendaraan yang Melintasi Pelabuhan
Bakauheni pada Arus Puncak Hari Lebaran ................................ ..60
Gambar 20. Hasil Perhitungan Jumlah Kendaraan yang Melintasi
Pelabuhan Bakauheni pada Arus Puncak Hari Lebaran..................61

DAFTAR ISI

Halaman
HALAMAN JUDUL…….....……………………………………………….......i
DAFTAR ISI……………………………………………………………………ii

DAFTAR GAMBAR……………………………………………………….iv
DAFTAR TABEL…………………………………………………………..vi
I.

PENDAHULUAN
A.

B.
C.
D.
E.

Latar Belakang ................................................................................... 1
Rumusan Masalah.............................................................................. 3
Tujuan Penelitian ............................................................................... 3
Batasan Masalah ................................................................................ 3
Manfaat Penelitian ............................................................................. 4

II. TINJAUAN PUSTAKA
A.
B.
C.
D.
E.
F.
G.


Pelabuhan Penyeberangan Bakauheni dan Merak ............................. 5
Fasilitas Pelabuhan Bakauheni .......................................................... 6
Klasifikasi Rute Penyeberangan Pelabuhan....................................... 15
Sistem Angkutan Penyeberangan dan Rencana Operasi ................... 17
Strategi Penyediaan Dermaga ............................................................ 21
Pengembangan Pelabuhan Penyeberangan Bakauheni ...................... 22
Penelitian Terdahulu ......................................................................... 24

III. METODE PENELITIAN
A.
B.
C.
D.
E.
F.

Umum ................................................................................................ 25
Lokasi dan Waktu Penelitian ............................................................. 25
Data .................................................................................................... 25
Pengumpulan Data ............................................................................. 26

Tahapan Penelitian............................................................................. 26
Bagan Alir Penelitian......................................................................... 28

vii

IV. HASIL DAN PEMBAHASAN
A.
B.
C.
D.

Pengumpulan Data ............................................................................. 33
Data Arus Penyeberangan.................................................................. 34
Arus Angkutan Lebaran Tahun 2012 sampai 2015 ........................... 38
Formasi Kapal yang Bersandar di Dermaga dan Kapasitas Dermaga
di Pelabuhan Penyeberangan Bakauheni ........................................... 45
E. Kapasitas Pelabuhan Penyeberangan Bakauheni setelah
pembangunan Dermaga VI ................................................................ 48
F. Perhitungan Jumlah Arus Kendaraan Pelabuhan Penyeberangan
Bakauheni 2015 -2020 ...................................................................... 58


V. PENUTUP
A. Kesimpulan ........................................................................................ 63
B. Saran .................................................................................................. 64

DAFTAR PUSTAKA

DAFTAR TABEL

Halaman
Tabel 1. Spesifikasi Dermaga I ........................................................................ 7
Tabel 2. Spesifikasi Dermaga II....................................................................... 8
Tabel 3. Spesifikasi Dermaga III ..................................................................... 9
Tabel 4. Spesifikasi Dermaga IV ..................................................................... 10
Tabel 5. Spesifikasi Dermaga V....................................................................... 10
Tabel 6. Daftar Kapal Ro-Ro Lintas Bakuheni-Merak .................................... 11
Tabel 7. Port Time dan Waktu Manuver pada Pelabuhan Penyeberangan
Bakauheni .......................................................................................... 33
Tabel 8. Data Angkutan Penyeberangan 20120-2014 Pelabuahn Bakauheni.. 34
Tabel 9. Data Angkutan Lebaran pada Hari Puncak tahun 2012-2015............ 36

Tabel 10. Data Angkutan Lebaran 2012 .......................................................... 38
Tabel 11. Data Angkutan Lebaran 2013 .......................................................... 40
Tabel 12. Data Angkutan Lebaran 2014 .......................................................... 41
Tabel 13. Data Angkutan Lebaran 2015 .......................................................... 38
Tabel 14. Data Kendaraan yang Melintasi Pelabuhan Bakauheni pada
Lebaran tahun 2012-2015................................................................ 44
Tabel 15. Daftar Formasi Kapal yang Bersandar dan Kapasitas Dermaga
di Pelabuhan Bakauheni .................................................................. 46
Tabel 16. Rencana Formasi Kapal di Dermaga VI ......................................... 49
Tabel 17. Waktu Menurunkan Kendaraan pada Setiap Kapal ......................... 50

vii

Tabel 18. Waktu Menurunkan Kendaraan pada Kapal di Pelabuhan
Penyebrangan Lembar ..................................................................... 51
Tabel 19. Waktu Menaikkann Kendaraan pada Setiap Kapal.......................... 52
Tabel 20. Waktu Menaikkan Kendaraan pada Kapal di Pelabuhan
Penyeberangan Lembar ................................................................... 52
Tabel 21. Waktu Manuver kapal di Pelabuhan Bakauheni ............................. 53
Tabel 22. Headway Minimum masing-masing kapal di Dermaga................... 54
Tabel 23. Headway Minimum masing-masing kapal di Pelabuha
Penyeberangan Lembar ................................................................... 55
Tabel 24. Waktu Berlabuh masing – masing Kapal......................................... 55
Tabel 25. Waktu Berlabuh masing – masing Kapal di Pelabuhan
Penyeberangan Lembar ................................................................... 56
Tabel 26. Waktu Siklus Masing – Masing Kapal ............................................ 57
Tabel 27. Jumlah Kendaraan yang Mampu diseberangkan di
Dermaga VI dalam satu hari............................................................ 58
Tabel 28. Hasil Perhitungan Jumlah Kendaraan yang Melintasi
Pelabuhan Bakauheni tahun 2015-2020. ......................................... 61
Tabel 29. Hasil Perhitungan Jumlah Kendaraan yang Melintasi
Pelabuhan Bakauheni pada Arus Puncak tahun 2016 – 2020 ......... 62

PERSEMBAHAN

Karya sederhana ini kupersembahkan bagi semua yang
pernah menjadi bagian dalam hidupku dan orang orang
yang selalu menyayangiku.

Bapak dan Ibuku,
Kakak dan Keluargaku tersayang,
Terimakasih atas perhatian dan pengertiannya.
Sahabat-sahabatku yang telah memberiku inspirasi untuk selalu
optimis dan percaya diri,
Seseorang yang menemaniku,
dan Almamater tercinta.
Tanpa kalian semua, karya ini mungkin hanya ada dalam angan

I Love You..

i

MOTO

“Sungguh... atas kehendak Allah semua ini terwujud, tiada
kekuatan kecuali dengan pertolongan Allah”
(QS. Al-Kahfi : 39)

Semua yang kita lakukan dalam hidup ini harus dilandasi
rasa sayang.
Sayang kepada tuhan,
Jadi kita tidak lupa bersyukur dan malu berdosa.
Sayang sama diri sendiri,
Jadi kita tidak melakukan hal-hal yang merusak diri dan
masa depan
Sayang sama masa depan
Jadi selalu punya rencana yang jelas untuk hidup lenih baik
(Twivortiare 2)

Always be yourself and never be anyone else even if they
look better than you.
(Marthin Luther King)
“Sesungguhnya sesudah kesulitan itu ada kemudahan”.
(QS. Alam Nasyroh : 6)

RIWAYAT HIDUP

Penulis dilahirkan di Tanjung Karang pada tanggal 30 Januari
1993. Penulis merupakan putri dari pasangan Bapak Agus
Daryanto dan Ibu Leli Hestiati, anak ketiga dari tiga
bersaudara.

Dengan rahmat Allah SWT penulis menyelesaikan pendidikan di Taman Kanakkanak Kesuma pada tahun 2000, pendidikan Sekolah Dasar Negeri 1 Rawa Laut
pada tahun 2005, Sekolah Menengah Pertama Negeri 10 Bandar Lampung pada
tahun 2008, dan Sekolah Menengah Atas Negeri YP UNILA tahun 2011. Terakhir
Penulis tercatat sebagai mahasiswa Fakultas Teknik, Jurusan Teknik Sipil
Universitas Lampung melalui Seleksi Nasional Masuk Perguruan Tinggi Negeri
(SNMPTN) Jalur Undangan pada tahun 2011.

Pada tahun 2014, penulis melakukan Kerja Praktek di Proyek Rumah Sakit Ibu
dan Anak Belleza

Bandar Lampung selama 3 bulan.

Penulis juga telah

melaksanakan Kuliah Kerja Nyata (KKN) di desa Way Tuba, Kecamatan Gunung
Labuhan, Kabupaten Waykanan selama 40 hari pada periode Januari-Maret 2015
dengan tema POSDAYA (Pos Pemberdayaan Keluarga).

Penulis mengambil

tugas akhir dengan judul Analisis Kapasitas Pelabuhan Bakauheni Setelah
Pembangunan Dermaga VI.

Selama menjadi mahasiswa penulis aktif dalam organisasi UKMF Himpunan
Mahasiswa Teknik Sipil (HIMATEKS) divisi Kominfo periode tahun 2012-2013.

SANWACANA

Puji dan syukur penulis panjatkan kepada Allah SWT atas berkat dan karuniaNya,
sehingga penulis dapat menyelesaikan skripsi ini sesuai dengan yang diharapkan.

Melalui kesempatan ini, Penulis hendak mengucapkan terima kasih yang tak
terhingga kepada semua pihak yang telah memberikan dukungan moril, maupun
spiritual.

Banyak pengalaman dan masukan yang didapat Penulis dalam

menyelesaikan penelitian ini, baik hal-hal yang bersifat mendidik dan kritikan
yang berguna bagi Penulis.

Dengan teriring salam dan doa serta ucapan terima kasih yang tak terhingga
Penulis sampaikan kepada :
1.

Bapak Prof. Dr. Suharno, M.sc., selaku Dekan Fakultas Teknik Universitas
Lampung.

2.

Bapak Ir. Idharmahadi Adha, M.T., selaku ketua jurusan Teknik Sipil
Fakultas Teknik Universitas Lampung.

3.

Bapak Ir. Dwi Heriyanto, M.T., selaku dosen pembimbing 1 atas pemberian
judul, masukan, dan bimbingan yang diberikan selama penyusunan skripsi
ini.

4.

Ibu Dr. Rahayu Sulistiyorini, S.T.,M.T., selaku dosen pembimbing 2 atas
masukan dan bimbingan yang diberikan selama penyusunan skripsi ini.

ii

5.

Bapak Ir. Ahmad Zakaria, M.T. Ph.D., atas kesempatannya untuk menguji
sekaligus membimbing Penulis dalam seminar skripsi.

6.

Bapak Subuh Tugiono. S.T. M.T., selaku pembimbing akademis yang telah
banyak membantu Penulis selama ini.

7.

Bapak dan Ibu Dosen Jurusan Teknik Sipil Fakultas Teknik Universitas
Lampung atas ilmu bidang sipil yang telah diberikan selama perkuliahan.

8.

Keluargaku terutama orangtuaku tercinta, Bapak Agus dan Ibu Leli Hestiati,
serta Kakakku Galih dan Lingga beserta keluarga atas doanya.

9.

Indah, Nyoman, Trinovita, Yohana, Fera, Vivi, Karina, Ira yang selalu
mendengar keluh kesal dan memberi semangat.

10. Anggarani, Ekanto, Fahri, Krisna, Kimul, Novindio dan Salman yang telah
menyediakan waktu untuk pengambilan data di Pelabuhan Bakauheni.
11. Prayoga

yang dengan ikhlas meluangkan waktu untuk menemani dan

memberi semangat.
12. Serta teman – teman dan rekan – rekan sipil, kakak – kakak, adik – adik yang
telah banyak membantu dan mendukung dalam pengerjaan skripsi ini serta
yang paling utama angkatan 2011 yang tidak bisa saya sebutkan satu persatu
dan teman-teman KKN Desa Way Tuba untuk bantuan moril, tempat, waktu,
doa dan dukungannya selama ini. Saya ucapkan terima kasih banyak semoga
sukses selalu mengiringi kita semua.

iii

Penulis menyadari bahwa skripsi ini masih banyak kekurangan dan keterbatasan,
oleh karena itu saran dan kritik yang bersifat membangun sangat diharapkan.
Akhir kata semoga Tuhan membalas semua kebaikan semua pihak yang telah
membantu dalam penyelesaian tugas akhir ini dan semoga skripsi ini dapat
bermanfaat bagi penulis dan pembaca.
Bandar Lampung,

Desember 2015
Penulis,

Galuh Pramita

iv

I. PENDAHULUAN

A.

Latar Belakang

Kebutuhan pelayanan akan jasa transportasi merupakan hasil interaksi
antara aktivitas sosial dan ekonomi yang tersebar didalam ruang atau tata
guna

lahan

(Suparsa,

2009).

PT.

Angkutan

Sungai

Danau

dan

Penyeberangan (PT. ASDP) Cabang Utama Bakauheni merupakan
pelabuhan penyeberangan di Propinsi Lampung. Pelabuhn Bakauheni selalu
berkembang menuju terwujudnya pelabuhan penyeberangan yang dapat
melayani kebutuhan masyarakat. PT. ASDP Cabang Utama Bakauheni
berusaha memenuhi kebutuhan masyarakat indonesia dan terutama
masyarakat di pulau Sumatera dan sekitarnya akan fasilitas sosial berupa
fasilitas

penyeberangan,

perpakiran,

keamanan,

transportasi

dan

kenyamanan.

Pelabuhan Bakauheni yang terletak di Provinsi Lampung memiliki peranan
yang sangat penting bagi pertumbuhan dan perkembangan Provinsi
Lampung. Pelabuhan penyeberangan Bakauheni – Merak merupakan salah
satu pelabuhan penyeberangan yang sangat padat. Pelabuhan Bakauheni –
Merak dipisahkan oleh Selat Sunda yang mempunyai jarak 16 mil (25.75
km) dapat ditempuh dengan 120 menit namun jika sedang terjadi

2

peningkatan arus penumpang waktu tempuh bisa bertambah hingga 3 jam
karena dermaga yang tersedia belum optimal berjalan. Hal ini dapat
menghambat

perpindahan

barang

atau

jasa

yang

menyebabkan

meningkatnya waktu perpindahan dari tempat asal menuju tempat tujuan
sehingga menghambat pertumbuhan ekonomi di Pulau Sumatera.

Untuk mewujudkan transportasi yang efektif dan efisien harus ditingkatkan
pelayanan dengan mempertemukan kepentingan dari sisi penyedia maupun
dari sisi pengguna jasa angkutan penyeberangan. Peningkatan pelayanan
yang dimaksud adalah dengan cara meningkatkan prasarana maupun sarana
yang merupakan penunjang penting menuju penyelenggara transportasi
yang efektif, dan efisien.

Berdasarkan keadaan dermaga yang ada Pelabuhan Bakauheni masih
memiliki banyak kekurangan. Saat ini dermaga yang tersedia di Pelabuhan
Bakauheni sebanyak 5 dermaga. Jumlah tersebut dirasa belum mencukupi
untuk memenuhi kebutuhan penyeberangan di Pelabuhan Bakauheni.
Sehingga, sering terjadi antrian kendaraan yang akan menyeberang ke Pulau
Jawa. Jika musim liburan dan lebaran tiba sering terjadi lonjakan
penumpang yang menyebabkan penumpukkan penumpang dan antrian
kendaraan yang akan menyeberang ke Pulau Jawa. Untuk itu pemerintah
berencana menambah jumlah dermaga di pelabuhan bakauheni. Dengan
ditambahkannya jumlah dermaga di pelabuhan bakauheni diharapkan dapat
meminimalkan waktu bongkar muat (port time) dan mempercepat waktu
berlayar (sailing time).

3

B.

Rumusan Masalah

Berdasarkan latar belakang penelitian yaitu kurangnya jumlah dermaga di
Pelabuhan Bakauheni untuk memenuhi kebutuhan penyeberangan sehingga
sering terjadi antrian kendaraan terutama jika sedang terjadi arus puncak.
Oleh karena itu perlu dilakukan penambahan dermaga di Pelabuhan
Bakauheni agar dapat mengurangi antrian kendaraan

yang ingin

menyeberang ke Pulau Jawa. Dalam konteks ini penelitian yang dilakukan
hanya setelah pembangunan dermaga VI di Pelabuhan Bakauheni.

C.

Tujuan Penelitian

Penelitian tentang kapasitas Pelabuhan Bakauheni ini memiliki beberapa
tujuan yaitu :
1. Mengetahui kapasitas Pelabuhan Bakauheni pada kondisi existing tahun
2014.
2. Mengetahui kapasitas Pelabuhan Bakauheni apabila ditambah satu
dermaga ( Dermaga VI ).
3. Memprediksi kapasitas Pelabuhan Bakauheni sampai tahun 2020.

D.

Batasan Masalah

Penelitian yang akan dilakukan mengarah pada analisa kapasitas Pelabuhan
Bakauheni, terutama pada saat arus puncak penumpang yang akan
menyeberang

ke

permasalahannya :

Pulau

Jawa,

sehingga

perlu

dibatasi

pokok

4

1. Lokasi penelitian atau wilayah pengambilan data hanya dilingkup
Pelabuhan Bakauheni.
2. Hanya melihat dan memperhitungkan jumlah kendaraan ≥ roda empat.

E.

Manfaat Penelitian

Manfaat Penelitian ini adalah :
1. Memperkirakan pelayanan pelabuhan bakauheni setelah pembangunan
dermaga VI.
2. Mengetahui kebutuhan pelabuhan bakauheni setelah pembangunan
dermaga VI.

II. TINJAUAN PUSTAKA

A.

Pelabuhan Penyeberangan Bakauheni dan Merak

Pelabuhan Penyeberangan Bakauheni adalah pelabuhan yang terletak di
kecamatan Bakauheni, Kabupaten Lampung Selatan. Pelabuhan Bakauheni
menghubungkan Pulau Sumatera dan Pulau Jawa melalui via laut.
Pelabuhan Penyeberangan Bakauheni memiliki luas 452.458 m2 (Badan
Penelitian dan Pengembangan Perhubungan Kementrian Perhubungan,
November 2010). Adapun batas-batas fisik kewilayahan Pelabuhan
Penyeberangan Bakauheni sebagai berikut :
a. Sebelah utara berbatasan dengan Kecamatan Ketapang
b. Sebelah timur berbatasan dengan Selat Sunda
c. Sebelah barat berbatasan dengan Kecamatan Kalianda
d. Sebelah selatan berbatasan dengan Selat Sunda
Pelabuhan penyeberangan Merak yang terletak di Provinsi Banten adalah
pelabuhan umum yang melayani penyeberangan antara Pulau Jawa dan
Sumatera (Andriani, 2011). Pelabuhan Penyebarangan Merak memiliki Luas
150.615 m2. Pelabuhan Penyeberangan Merak memiliki 5 dermaga dan
dilengkapi dengan Moveable Bridge.

6

Penyeberangan Bakauheni – Merak ini dilayani oleh kapal feri ro-ro. Setiap
harinya, ratusan trip feri melayani arus penumpang dan kendaraan dari dan
ke Pulau Sumatra melalui Pelabuhan Penyeberangan Bakauheni di
Lampung. Rata-rata durasi perjalanan yang diperlukan antara Merak Bakauheni atau sebaliknya dengan feri ini adalah sekitar 120 menit.

Gambar 1. Layout Pelabuhan Penyeberangan Bakauheni
B.

Fasilitas Pelabuhan Bakauheni

Untuk mendukung kelancaran pelayanan Pelabuhan Penyeberangan
Bakauheni ada beberapa fasilitas yang diberikan oleh pihak PT. ASDP
Indonesia Ferry selaku pengelola pelabuhan tersebut adalah :
1.

Dermaga
Dermaga adalah suatu bangunan pelabuhan yang digunakan untuk
merapat dan menambatkan kapal yang melakukan bongkar muat
barang dan menaik-turunkan penumpang (Triatmojo, 1996). Dimensi
dermaga didasarkan pada jenis dan ukuran kapal yang merapat dan

7

bertambat pada dermaga tersebut (Solossa, 2013). Pelabuhan
Penyeberangan Bakauheni memiliki dermaga dengan tipe Qual Wall,
Dolphin dan Jetty. Pelabuhan Penyeberangan Bakuheni pada saat ini
memiliki lima dermaga yang beroperasi yaitu dermaga I,II, II, IV dan
V yang digunakan untuk bongkar muat barang dan menaik-turunkan
penumpang. Dermaga-dermaga tersebut memiliki spesifikasi sebagai
berikut:
a.

Dermaga I
Dermaga I di Pelabuhan Penyeberangan Bakauheni di bangun
pada tahun 1981 dan mulai dioperasikan tahun 1987.
Mempunyai panjang dermaga 172,8 M dan kedalaman kolam
sandar 10 – 12 M Dermaga I di Pelabuhan Penyeberangan
Bakauheni merupakan dermaga dengan tipe Quay Wall. Untuk
lebih jelasnya dibawah ini adalah spesifiksi dari Dermaga I.
Tabel 1. Spesifikasi Dermaga I
No
Uraian
1 Panjang Dermaga

Spesifikasi
172,8 M
L = 50 M
2 Kolam
d = 10 - 12 M
3 Dolphin
12 buah
L=2M
4 Gang Way
P = 14 M
Kapasitas = 1 T
L = 11,6 M
5 Moveable Bridge
P= 16 M
Kapasitas = 50 T
L= 2,8 M
6 Side Ramp
P= 16 M
Kapasitas = 20 T
7 Kapasitas Dermaga
6000 GRT
8 Luas Areal Parkir
11237 M2
(Sumber: Profil dan Kinerja Kantor OPP Merak, 2014)

8

b.

Dermaga II
Dermaga II di Pelabuhan Penyeberangan Bakauheni di bangun
pada tahun 1988 dan mulai dioperasikan tahun 1991.
Mempunyai panjang dermaga 134,66 M dan kedalaman kolam
sandar 8 – 10 M

Dermaga II di Pelabuhan Penyeberangan

Bakauheni merupakan dermaga dengan tipe Quay Wall. Untuk
lebih jelasnya dibawah ini adalah spesifiksi dari Dermaga II.
Tabel 2. Spesifikasi Dermaga II
No
Uraian
1 Panjang Dermaga

Spesifikasi
134,66 M
L = 20 M
2 Kolam
d = 8 - 10 M
3 Dolphin
12 buah
L = 1,5 M
4 Gang Way
P = 14 M
Kapasitas = 1 T
L=9M
5 Moveable Bridge
P= 16 M
Kapasitas = 50 T
L= 3 M
6 Side Ramp
P= 17 M
Kapasitas = 20 T
7 Kapasitas Dermaga
6000 GRT
8 Luas Areal Parkir
9.594 M2
(Sumber: Profil dan Kinerja Kantor OPP Merak, 2014)
c.

Dermaga III
Dermaga III di Pelabuhan Penyeberangan Bakauheni di bangun
pada tahun 2001 dan mulai dioperasikan tahun 2001.
Mempunyai panjang dermaga 166,83 M dan kedalaman kolam
sandar 10 – 12 M Dermaga II di Pelabuhan Penyeberangan

9

Bakauheni merupakan dermaga dengan tipe Quay Wall. Untuk
lebih jelasnya dibawah ini adalah spesifiksi dari Dermaga III.
Tabel 3. Spesifikasi Dermaga III
No
Uraian
1 Panjang Dermaga

Spesifikasi
166,83 M
L = 25 M
2 Kolam
d = 10 - 12 M
3 Dolphin
12 buah
L = 1,8 M
4 Gang Way
P= 16 M
Kapasitas = 1,5 T
L = 10 M
5 Moveable Bridge
P= 16 M
Kapasitas = 45 T
L= 2.8 M
6 Side Ramp
P= 21 M
Kapasitas = 2 T
7 Kapasitas Dermaga
12000 GRT
8 Luas Areal Parkir
13.965 M2
(Sumber: Profil dan Kinerja Kantor OPP Merak, 2014)
d.

Dermaga IV
Dermaga IV di Pelabuhan Penyeberangan Bakauheni dibangun
tahun 1998 dan mulai dioperasikan tahun 2001. Mempunyai
panjang dermaga 57,69 M dan kedalaman kolam sandar 10 – 12
M

Dermaga IV di Pelabuhan Penyeberangan Bakauheni

merupakan dermaga dengan tipe Dolphin. Dermaga ini adalah
dermaga milik swasta yaitu milik KSO. PT. Infinity Indosakti.
Untuk lebih jelasnya dibawah ini adalah spesifiksi dari Dermaga
IV.

10

Tabel 4. Spesifikasi Dermaga IV
No
Uraian
1
Panjang Dermaga

Spesifikasi
57,69 M
L = 20 M
2
Kolam
d = 10 - 12 M
3
Dolphin
3 buah
L = 7,9 M
4
Moveable Bridge
P= 17,82 M
Kapasitas = 60 T
5
Kapasitas Dermaga
6000 GRT
6
Luas Areal Parkir
10.519 M2
7
Mooring Dolphin
2 buah
(Sumber: Profil dan Kinerja Kantor OPP Merak, 2014)
e. Dermaga V
Dermaga V di Pelabuhan Penyeberangan Bakauheni di bangun
pada tahun 2009 dan mulai dioperasikan tahun 2012. Mempunyai
panjang dermaga 125 M dan kedalaman kolam sandar 10 – 12 M
Dermaga II di Pelabuhan Penyeberangan Bakauheni merupakan
dermaga dengan tipe Dolphin dan Jetty. Untuk lebih jelasnya
dibawah ini adalah spesifiksi dari Dermaga V.
Tabel 5. Spesifikasi Dermaga V
No
Uraian
1
Panjang Dermaga
2

Kolam

3

Dolphin

4

Moveable Bridge

Spesifikasi
125 M
L = 20 M
d = 10 - 12 M
5 buah
L = 7,8 M
P= 17,8 M
Kapasitas = 80
T

Kapasitas
5
12000 GRT
Dermaga
6
Luas Areal Parkir 13.464 M2
7
Mooring Dolphin 4 buah
(Sumber: Profil dan Kinerja Kantor OPP Merak, 2014)

11

2.

Kapal yang beroperasi
Jenis kapal yang digunakan untuk menyeberang dari Pelabuhan
Penyeberangan Bakauheni ke Pelabuhan Penyeberangan Merak adalah
kapal Ro-Ro (Roll on – Roll off). Kapal Ro-Ro (Roll on – Roll off)
adalah kapal yang bisa memuat kendaraan yang berjalan masuk ke
dalam kapal. Kapal ini dilengkapi dengan pintu rampa yang
dihubungkan dengan moveble bridge atau dermaga apung ke dermaga.
Kapal Ro-Ro selain digunakan untuk angkutan truk juga digunakan
untuk mengangkut mobil penumpang, sepeda motor dan pejalan kaki.

Tabel 6. Daftar Kapal Ro-Ro Lintas Bakauheni-Merak

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Nama Kapal
KMP. Jatra I
KMP. Jatra II
KMP. Jatra III
KMP. Portlink
KMP. Portlink 3
KMP. Portlink 5
KMP. Sebuku
KMP. Legundi
KMP. Batu Mandi
KMP. Menggala
KMP. Duta Banten
KMP. Jagantara
KMP. Rajakarta
KMP. Virgo 18
KMP. Mufidah
KMP. Titian Murni
KMP. Nusa Dharma
KMP. Nusa Bahagia
KMP. Nusa Mulia
KMP. Nusa Agung
KMP. Nusa Jaya
KMP. Nusa Setia

Perusahaan

PT. ASDP
Indonesia Ferry

PT. JL Ferry

PT. Putera
Master Sarana
Penyeberangan

Tahun

GRT

1980
1980
1985
1979
1986
2011
2012
2012
2012
1987
1979
1984
1989
1990
1973
1982
1973
1979
1979
1986
1987
1988

3,871
3,902
3,123
12,517
15,351
4,028
5,330
5,330
5,330
4,330
8,011
9,956
8,886
9,989
5,584
3,614
3,282
3,555
5,873
5,730
4,564
4,678

Kapasitas
Kendaraan
≥ roda 4
70
70
70
172
262
68
202
202
202
138
162
212
227
252
94
100
58
68
132
127
148
140

12

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

KMP. Prima Nusantara
KMP. Panorama
Nusantara
KMP. Mitra Nusantara
KMP. Royal Nusantara
KMP. Farina Nusantara
KMP. Safira Nusantara
KMP. Mustika Kencana
KMP. Dharma Kencana
IX
KMP. Dharma Rucitra
1
KMP. Kirana II
KMP. Windu Karsa
Pratama
KMP. Windu Karsa
Dwitya
KMP. SMS
Kartanegara
KMP. SMS
Mulawarman
KMP. SMS Sagita

38
39

KMP. HM Baruna I
KMP. Rajabasa 1

40
41

KMP. Tribuana 1
KMP. Bahuga Pratama
KMP. Mutiara Persada
1
KMP. Mutiara Persada
2
KMP. Shalem
KMP. Salvatore
KMP. Caitlyn
KMP. Munic 1
KMP. Elysia
KMP. Rosmala
KMP. Suki 2

42
43
44
45
46
47
48
49
50
51

KMP. Trimas Laila

52

KMP. Raputra Jaya 888

53

KMP. BSP 1

PT. Jembatan
Nusantara
PT. Prima
Eksekutif

PT. Dharma
Lautan Utama

PT. Windu
Karsa

PT. Sekawan
Maju Sekawan
PT. Hasta Mitra
Baruna
PT. GMP
PT. Tribuana
Antar Nusa
PT. Atosim
Lampung
Pelayaran
PT. Surya
Timur Line
PT. Munic Line
PT. BPR
PT. Trisakti
Lautan Mas
PT. Raputra
Jaya
PT. Tri Sumaja
Lines

1990

2,773

46

1995
1994
1992
1994
1995
1992

8,915
5,813
6,034
5,002
6,345
4,183

172
118
112
88
122
88

1988

2,627

46

1990
1989

11,479
6,370

247
152

1985

3,123

88

1997

2,553

83

1975

4,449

76

1988
1988

3,388
5,373

56
180

1985
1987

4,432
4,611

103
93

1984
1993

6,186
3,531

182
63

1996

9,081

187

1994
1989
1996
1986
1987
1986
1990
1993

3,965
3,964
9,131
2,905
2,640
4,823
4,377
4,330

46
66
182
83
46
103
48
128

1994

3,006

96

2013

5,110

156

1973

5,057

115

13

54 KMP. BSP 2
55 KMP. BSP 3
56 KMP. Victorius
57 KMP. Sakura
(Sumber : PT. ASDP , 2015)

PT. Budi
Samudera
Perkasa
PT. BMNL

1983
1973
1990
1989

5,227
12,498
4,280
3,681

Pelabuhan Penyeberangan Bakauheni memiliki

120
210
115
50

57 kapal yang

tersedia dilintasan Bakauheni – Merak dengan kapal yang beroperasi
setiap harinya sebanyak 24 kapal. Kapal – kapal yang beroperasi di
lintasan Bakauheni – Merak telah memiliki jadwal operasi dan
formasi kapal yan bersandar pada masing-masing dermaga yang ada
di Pelabuhan Bakauheni.
3.

Lapangan Parkir
Lapangan parker berfungsi sebagai tempat kendaraan yang menunggu
untuk

dapat

dilayani

masuk

kedalam

kapal.

Di

Pelabuhan

Penyeberangan Bakauheni terdapat lapangan parkir untuk mendukung
kelancaran arus bongkar muat penumpang dan kendaraan bermotor
dari dan ke dalam kapal sebagai berikut :
Dermaga I :
1. Parkir A

= 360 Bus dan Pribadi

2. Parkir B

= 360 Bus dan Pribadi

Dermaga II :
1. Parkir C

= 260 Bus dan Pribadi

2. Parkir D

= 380 Bus dan Pribadi

Dermaga III :
1. Parkir E, F, dan G

= 1200 Bus dan Pribadi

14

Dermaga IV dan V :

4.

1. Parkir H

= 440 Bus dan Pribadi

Total keseluruhan

= 2940 Kendaraan Campuran

Fasilitas Loket Penumpang dan Fasilitas Terminal Bus
Di Pelabuhan Penyeberangan Bakauheni ini ada dua jenis loket, yaitu
loket untuk penumpang dan loket untuk kendaraan. Pelabuhan
Penyeberangan Bakauheni mempunyai 9 loket untuk penumpang
(tanpa kendaraan). Pada loket penumpang yang menggunakan
kendaraan terdapat 8 loket yaitu terdiri dari satu loket untuk sepeda
motor, tiga loket untuk kendaraan pribadi dan pick-up, satu loket
untuk bus dan tiga loket untuk truk. Pelabuhan Penyeberangan
Bakauheni juga memiliki terminal bus untuk penumpang pejalan kaki.
Sebagian besar bus - bus yang ada di terminal tersebut merupakan
angkutan dalam propinsi dimana berfungsi untuk membawa
penumpang pejalan kaki yang akan menuju Pelabuhan Penyeberangan
Bakauheni

maupun

yang

akan

meninggalkan

Pelabuhan

Penyeberangan Bakauheni.
5.

Fasilitas Penunjang lainnya
Fasilitas penunjang lainnya yang ada di Pelabuhan Penyebrerangan
Bakauheni yaitu ruang tunggu penumpang, CCTV di sebagian titik
pelabuhan, dan toilet. Dalam pelayanannya, Pelabuhan Bakauheni
Penyeberangan merupakan pelabuhan yang beroperasi 24 jam dalam
sehari.

15

C.

Klasifikasi Rute Penyeberangan Pelabuhan

Klasifikasi rute penyeberangan dapat diklasifikasikan menurut beberapa
kriteria (Nasution, 2003 ) yaitu :
1.

Berdasarkan Karakter Fungsional
a. National route
National route adalah rute yang menghubungkan dua ibu kota
provinsi.
b. Regional trunk route
Regional trunk route adalah rute yang menghubungkan dua tempat
dimana salah satunya ibu kota provinsi.
c. Regional route
Regional route adalah rute yang tidak mempunyai hubungan
langsung dengan ibu kota provinsi.
Berdasarkan karakter fungsional Pelabuhan Penyeberangan Bakauheni
termasuk kedalam National Route.

2.

Berdasarkan Karakter Geografi
a. Inter-regional route
Inter-regional rute adalah rute yang menghubungkan dua ibu kota
provinsi.
b. Inter-islan route
Inter-islan rute adalah rute yang menghubungkan pulau-pulau
dalam satu region.

16

c. Island route
Island route adalah rute yang menghubungkan lokasi-lokasi di
dalam suatu daratan, misalnya : penyeberangan danau dan
penyeberangan sungai.
d. Short-cut-route
Short-cut-route adalah rute yang merupakan perpendekan dari
angkutan jalan raya.
Berdasarkan

karakter

geografi

Pelabuhan

Penyeberangan

Bakauheni termasuk kedalam Inter-regional route.
3.

Berdasarkan Besarnya Demand
a. High demand route
High demand route adalah rute dengan 6 trips/hari dalam satuan
kapal 300-500 GRT.
b. Medium demand route
Medium demand route adalah rute yang 2-6 trip/hari dalam satuan
kapal 300-500 GRT.
c. Law demand route
Law demand route adalah rute lebih kecil dari dua trip/hari dalam
satuan kapal 300-500 GRT.

4.

Berdasarkan Jarak Perjalanan
a. Sangat pendek : < 10 mil
b. Pendek : 11 – 50 mil
c. Jauh : 51 – 100 mil
d. Sangat jauh : > 100 mil

17

Berdasarkan Jarak Perjalanan Pelabuhan Penyeberangan Bakauheni
termasuk kedalam jarak pendek.

D.

Sistem Angkutan Penyeberangan dan Rencana Operasi

1.

Sistem Angkutan Penyeberangan
Sistem angkutan penyeberangan meliputi alur pelayaran, ukuran dan
tipe kapal, jadwal waktu pelayaran, dan dampak lingkungan.
a. Alur Penyeberangan
Ditentukan berdasarkan kondisi perairannya, orientasi permintaan,
penyebaran permintaan, jarak dan waktu tempuh.
b. Ukuran dan tipe kapal
Untuk menentukan ukuran kapal yang dibutuhkan didekati dengan
dua besaran. Pertama, berdasarkan tuntutan keselamatan dan
keamanan pelayaran yang merupakan fungsi dari kondisi perairan
sepanjang alur pelayaran.
Tipe kapal didekati dari karakter permintaan (penumpang dan
barang) yang akan dilayani.
c. Jadwal dan pelayaran
Untuk menentukan jadwal pelayaran didasarkan pola distribusi
waktu dan justifikasi konsultan. Justifikasi ini berdasarkan pada
kebutuhan pokok, serta kegiatan bahari. Dari sisi bahan pokok,
maka dengan kondisi geografis yang dibatasi oleh perairan, harus
dapat dijamin ketersediaan bahan pokok tersebut setiap waktunya.

18

Dengan demikian, dari pendekatan kapasitas penumpukan dan
pendistribusian dapat diketahui jadwal pengirimannya.
d. Dampak lingkungan
Dampak lingkungan yang umumnya terjadi pada pengembangan
pelabuhan adalah dampak sosial, pada umumnya adalah dampak
sosial, pada saat proses pembebasan tanah, dan karena terjadinya
perubahan fungsi kawasan.
2.

Rencana Pola Operasi
Pola operasi adalah penetapan jumlah kapal dan jumlah frekuensi
yang diperlukan pada tiap lintasan sesuai dengan jenis kapal dan jarak
lintasan. Untuk menghitung jumlah kapal yang diperlukan pada suatu
lintasan digunakan formula sebagai berikut :
JK

=

Tc / Hw

JK

=

jumlah kapal

Tc

=

waktu sirkulasi ( cycle time)

Hw

=

Head way

(1)

Untuk menghitung waktu siklus kapal, dapat digunakan rumus (2)
perhitungan terhadap waktu siklus kapal berikut :
Tc

=

2 ( Ts + Tm + Tp )

Tc

=

waktu siklus kapal ( cycle time )

Tp

=

waktu berlabuh ( port time )

Tm

=

waktu manuver kapal (manuver time)

(2)
Dimana :

19

Ts

=

waktu berlayar (sailing time)

Adapun rumus yang digunakan untuk menghitung waktu berlabuh
kapal (port time) atau Tp dapat digunakan dengan rumus (3)
perhitungan waktu berlabuh kapal berikut :
Tp

=

tb + tm

(3)

=

waktu bersandar kapal yang terdiri dari waktu

Dimana
Tp

bongkar muat (tm) kendaraan dalam satuan menit.
tb

=

rata-rata waktu menurunkan kendaraan
(menit/kendaraan)

tm

=

rata-rata waktu menaikkan kendaraan
(menit/kendaraan)

untuk menghitung rata-rata waktu manuver kapal dapat menggunakan
rumus (4) berikut :
Tm

=

∑X

(4)

N
Dimana :
Tm

=

waktu manuver kapal ( manuver time )

X

=

waktu pengamatan masing masing manuver kapal

N

=

jumlah pengamatan

Untuk menghitung rata-rata

waktu menaikkan barang dapat

menggunakan rumusan 5 berikut :
tm

=

∑ tm
N

(5)

20

Dimana :
tm

=

rata-rata waktu menaikkan kendaraan

∑ tm

=

total waktu menaikkan kendaraan dari masing
masing kapal

N

=

jumlah kendaraan

Untuk menghitung rata-rata waktu menurunkan barang dapat
menggunakan rumusan 6 berikut :
tb

=

∑ tb

(6)

N
tb

=

rata-rata waktu menurunkan kendaraan

∑ tb

=

total waktu menurunkan kendaraan dari masingmasing kapal

N

=

jumlah kendaraan

Kapal akan beroperasi dengan headway waktu keberangkatan yang
merata, untuk menghitung headway masing-masing dermaga dapat
menggunakan persamaan 7 berikut :
Hw

= tb + tm + Tm

(7)

Dimana :
Hw

=

headway keberangkatan kapal

tb

=

rata –rata waktu menurunkan kendaraan

tm

=

rata-rata waktu menaikkan kendaraan

TP

=

waktu bersandar (berlabuh) kapal

Frekuensi

pelayaran

yang dibutuhkan ditentukan berdasarkan

permintaan penumpang dan barang. Untuk kepentingan perencanaan

21

digunakan frekuensi pelayanan yang terbesar di antara dua metode.
Metode perhitungan yang digunakan adalah sebagai berikut:
a. Berdasarkan jumlah permintaan barang
b. Berdasarkan Sistem Penyediaan Dermaga

E.

Strategi Penyediaan Dermaga

Untuk meningkatkan

sistem angkutan antar pulau

perlu dilakukan

pengembangan sistem transportasi laut yang telah ada. Pengembangan
transportasi laut

yang dilakukan dapat berupa penambahan jalur

pelayaran/penyeberangan baru pada daerah yang dianggap berpotensi untuk
dikembangkan dan penambahan atau peningkatan sarana angkut (kapal)
yang sesuai untuk melayani suatu rute. Penambahan jumlah kapal tidak
berarti harus menambah jumlah dermaga, namun bisa juga menggunakan
dermaga yang ada atau yang telah tersedia. Untuk pembangunan dermaga
baru ada hal-hal yang perlu dipertimbangkan yaitu sebagai berikut :


Tidak tersedia dermaga di daerah rencana lokasi.



Dermaga yang tidak cocok (tidak sesuai) dengan kapal yang akan
dioperasikan. Misalnya, pelabuhan untuk kapal jenis non-RO-RO
tidak dapat dipergunakan secara optimal oleh kapal jenis RO-RO.



Dermaga yang sudah ada tidak mencukupi kebutuhan bongkar muat
arus barang dan penumpang.



Dermaga yang sudah ada rusak dan tidak dapat dimanfaatkan lagi atau
membahayakan kapal yang sandar di dermaga.

22

Hal yang diperhatikan dalam pembangunan suatu dermaga adalah :

F.

1.

Kemampuan Dermaga

2.

Analisis Keterpaduan

3.

Kriteria Desain Dermaga

4.

Fasilitas Sandar Dermaga

Pengembangan Pelabuhan Penyeberangan Bakauheni

Pelabuhan penyeberangan Bakauheni merupakan pelabuhan penyeberangan
yang menghubungkan Pulau Sumatera dan Pulau Jawa. Pelabuhan ini ramai
dilalui kendaraan angkutan penumpang dan angkutan barang yang menuju
kota yang ada di Pulau Sumatera, karena Pelabuhan Bakauheni merupakan
pintu gerbang utama bagi kendaraan yang akan menuju Pulau Sumatera.
Seiring dengan meningkatnya kegiatan penyeberangan membuat Pelabuhan
Bakauheni memiliki 5 dermaga dan dilengkapi dengan moveable bridge.
Waktu tempuh normal kapal yang akan menyeberang dari Pulau Sumatera
ke Pulau Jawa saat ini adalah sekitar 120 menit.

Perkembangan pada saat ini menunjukan peningkatan perjalanan sehingga
di masa yang akan datang dibutuhkan peningkatan pelayanan di Pelabuhan
Bakauheni. Peningkatan pelayanan yang ada dapat berupa peningkatan
inftastrukur pelabuhan dan penambahan jumlah kapal yang beroperasi.
Kemungkinan-kemungkinan pengembangan dan review terkait rencana
induk yang ada perlu dilakukan agar pembangunan fasilitas pelabuhan
penyeberangan di masa yang akan datang dapat dilakukan secara sistematis
dan terencana.

23

Pedoman

Teknis

Masterplan

Pelabuhan

Penyeberangan

Bakauheni

merupakan suatu arahan nasional terkait pembangunan pelabuhan
penyeberangan dengan jangkauan penggunaan jangka panjang (10-20 tahun)
dan dapat ditinjau ulang stiap 5 tahun. Pedoman Teknis Pelabuhan
Penyeberangan Bakauheni ini, nantinya akan digunakan untuk mengetahui
pola pengembangan pelabuhan, arah pengembangan pelabuhan, kebutuhan
dan penyediaan kapasitas pelabuhan penyeberangan serta sebagai dasar
krbijakan strategi dan tahapan implementasi pembangunan pelabuhan
penyeberangan bakauheni.
1.

Kondisi Eksisting Pelabuhan Penyeberangan Bakauheni
Kondisi Eksisting Pelabuhan Penyeberangan bakauheni dapat dilihat
dari kinerja Pelabuhan bakauheni pada tahun sebelumnya. Pada tahun
2014 jumlah kendaraan yang melintasi Pelabuhan Bakauheni
sebanyak 1.898.938 kendaraan. Arus puncak terjadi pada hari raya
idul fitri dengan jumlah kendaraan yang melintasi Pelabuhan
Bakauheni sebanyak 110.086 kendaraan campuran.

Gambar 2. Kondisi Eksisting Pelabuhan Penyeberangan Merak dan Bakauheni

24

G.

Penelitian Terdahulu
Tumangger (2013), telah melakukan penelitian di Pelabuhan Bakauheni –
Merak. Penelitian tersebut dilakukan untuk memberi optimalisasi yang
dilakukan untuk memberi gambaran optimalisasi yang dilakukan guna
meningkatkan kinerja Pelabuhan Bakauheni - Merak. Optimalisasi yang
dilakukan dengan menganalisis kinerja Pelabuhan Bakauheni kondisi
sekarang, menganalisis kinerja pelabuhan Bakauheni apabila dermaga VI
dibangun dan apabila kapal yang beroperasi menggunakan kecepatan 15
knot. Hasil yang didapat yaitu kinerja Pelabuhan Bakauheni – Merak
dengan menambah dermaga VI akan mampu melayani 23.923 kendaraan
campuran perhari dan kinerja Pelabuhan Bakauheni – Merak apabila
menambah kecepatan kapal yang beroperasi 15 knot akan mampu melayani
34.560 campuran perhari.

III. METODOLOGI PENELITIAN

A.

Umum
Metodologi penelitian adalah tata cara yang lebih terperinci mengenai
tahap-tahap dalam melakukan sebuah penelitian yang output akhirnya
berupa penarikan kesimpulan mengenai topik penelitian yang diambil.
Dalam penelitian ini diperlukan 2 macam data, yaitu data primer dan data
sekunder, yang digunakan sebagai bahan acuan sebagai pendukung dalam
meyelesaikan penelitian ini.

B.

Lokasi

Lokasi Penelitian ini dilakukan di Pelabuhan Bakauheni.

C.

Data

Data yang dibutuhkan dalam penelitian ini terdiri atas dua jenis data yaitu
data primer dan data sekunder. Data yang digunakan adalah sebagi berikut :
1.

Data primer
Data primer adalah data pokok yang dibutuhkan dalam penelitian, data
primer dalam penelitian ini adalah data yang diperoleh dari
pengamatan dilapangan berupa data mengenai situasi penyeberangan
di Pelabuhan Bakauheni pada arus puncak.

26

2.

Data Sekunder
Data sekunder merupakan data yang dari instansi terkait. Data yang
dibutuhkan adalah :
• Data jumlah kapal yang tersedia dan beroperasi
• Data kapasitas masing-masing kapal.
• Data jadwal keberangkatan
• Data layout pelabuhan
• Data penyeberangan pada arus puncak

D.

Pengumpulan Data

Untuk melakukan analisis perhitungan kapasitas Pelabuhan Bakauheni,
penulis

melalukan

pengumpulan

data

di

Pelabuhan

Bakauheni.

Pengumpulan data berupa data sekunder diperoleh penulis dari PT. ASDP
Indonesia Ferry Cabang Bakauheni. Data sekunder yang diperoleh adalah
data jumlah kapal yang tersedia dan beroperasi, data kapasitas masingmasing dermaga dan kapal, data jadwal keberangkatan, data layout
pelabuhan dan data penyeberangan pada arus puncak.

E.

Tahapan Penelitian
Tahapan penelitian mencakup langkah-langkah pelaksanaan penelitian dari
awal sampai akhir. Tahapan dalam penenelitian ini diawali dengan suatu
studi untuk mengidentifikasi daerah atau wilayah suatu lokasi, mengenali
wilayah dan permasalahan sehingga dapat ditetapkan sebagai lokasi studi,
mengidentifikasi data yang akan dibutuhkan, mengidentifikasi pustaka dan

27

acuan yang akan digunakan. Tujuan yang menjadi sasaran studi dan
identifikasi pustaka, dirumuskan untuk menuntukan data-data apa saja yang
diperlukan dalam memenuhi penelitian ini.

Berdasarkan survei menyeluruh baik survei pendahuluan ataupun survei
lanjutan tersebut akan didapatkan data lapangan sebagai data primer
sedangkan untuk data sekunder diperoleh dari instansi yang terkait, literatur,
ataupun jurnal ilmiah, yang selanjutnya akan diolah dalam rangka
penyusunan laporan penelitian. Sistematika serta langkah langkah tersebut
dilakukan dalam melengkapi laporan penelitian ini sehingga memperkecil
kekeliruan yang terjadi.

28

F.

Bagan Alir Penelitian

Mulai

Persiapan Penelitian
- Studi Literatur
- Penetapan Lokasi Penelitian

Pengumpulan Data

Data Primer
- Data volume kendaraan saat dan
arus puncak.
- Data waktu manuver kapal
- Data waktu bongkar muat kapal

-

Data Sekunder
- Data jumlah kapal yang tersedia
dan beroperasi
- Data jadwal keberangkatan
- Data layout pelabuhan
- Data penyeberangan pada arus
puncak

Pengelompokan Data
Tabulasi Data dan Pembahasan

Pengolahan Data
-

Perhitungan kapasitas masing-masing dermaga pada
waktu normal.
Jumlah penumpang pada arus puncak.
Perhitungan kapasitas pelabuhan setelah pembangunan
dermaga 6 .
Memprediksi kapasitas Pelabuhan Bakauheni sampai
tahun 2020.

Selesai

Gambar 3. Diagram Alir Penelitian

29

Tahapan – tahapan penelitian yang akan dilakukan pada penelitian analisa
kapasitas Pelabuhan Bakauheni setelah pembangunan dermaga. Untuk
penelitian ini, maka diperlukan beberapa tahapan dan sistematika penelitian
seperti pada gambar 1 dan dapat dijelaskan sebagai berikut :
1.

Sebelum peneltian dimulai dilakukan studi literatur yang berkaitan
dengan analisa kapasitas pelabuhan dan melakukan studi pendahuluan
yang didalamnya terdapat identifikasi/ penentuan lokasi penelitian,
identifikasi permasalahan,dan identifikasi data untuk mengetahui
permasalahn yang ada.

2.

Setelah studi pendahuluan maka dibuatlah latar belakang yang
melatarbelakangi penelitian ini, kemudian membuat perumusan
masalah diantaranya kapasitas pelabuhan Bakauheni pada saat lebaran
dan hari biasa.

3.

Kemudian menentukan data yang menjadi kebutuhan berupa data
data sekunder dan data primer. Data sekunder yang diperoleh dari
instansi terkait.

4.

Data yang diperoleh dikelompokkan berdasarkan ketentuan dan
batasan yang diteliti kemudian dibuat kedalam bentuk grafik dan
dilakukan pembahasan untuk hasil tersebut.

5.

Tahap berikutnya menganalisa kapasitas pelabuhan bakauheni setelah
pembangunan dermaga VI dan memprediksi kapasitas Pelabuhan
Bakauheni 5 tahun yang akan datang setelah pembangunan dermaga
VI.

6.

Setelah itu dibuat kesimpulan dan saran dari penelitian ini.

V. PENUTUP

A.

KESIMPULAN

Berdasarkan hasil perhitungan dan pembahasan analisa kapasitas Pelabuhan
Bakauheni, maka diperoleh kesimpulan sebagai berikut:
1.

Pada tahun 2014 jumlah kendaraan yang melintasi Pelabuhan
Bakauheni sebanyak 1.898.938 kendaraan. Dengan arus puncak terjadi
pada H+3 hari raya idul fitri dengan jumlah kendaraan 11.891
kendaraan campuran sehari.

2.

Karena

telah

dioperasikannya

dermaga

VI

di

Pelabuhan

Penyeberangan Bakauheni, pada saat hari raya idul fitri terlihat antrian
kendaraan di Pelabuhan Penyeberangan Bakauheni tetapi antrian
tersebut tidak sampai menyebabkan kemacetan diarea pelabuhan.
3.

Dari hasil perhitungan yang didapat di dermaga VI dapat dioperasikan
6 kapal dengan masing-masing kapal dapat beroperasi sebanyak 4 trip
dalam satu hari. Jumlah kendaraan yang mampu diseberangkan adalah
2280 kendaraan campuran dalam satu hari. Jadi, kapasitas Pelabuhan
Bakauheni setelah pembangunan Dermaga VI adalah sebanyak 13,066
kendaraan campuran dalam satu harinya.

64

4.

Hasil perhitungan yang dilakukan sampai tahun 2020 adalah sebagai
berikut:


Jumlah arus kendaraan dalam satu tahun adalah 1.914.572
kendaraan campuran.



Jumlah arus kendaraan dalam satu hari pada waktu puncak
adalah 15.144 kendaraan campuran.

5.

Berdasarkan hasil perhitungan kapasitas Pelabuhan Penyeberangan
Bakauheni pada tahun 2020 tidak mampu menampung kendaraan
yang akan menyeberang ke Pulau Jawa.

B.

Saran

1.

Perlu adanya pengawasan terhadap waktu bongkar muat kapal di
dermaga agar tidak terjadi antrian kapal yang akan melakukan
bongkar muat kendaraan.

2.

Menambah jumlah armada kapal di lintas bakauheni-merak.

3.

Menyamaratakan kapal dengan kapasitas dan kecepatan yang sama
sehingga penjadwalan pelayaran lebih mudah dan efektif.

4.

Untuk mengantisipasi jumlah kendaraan pada tahun 2020 perlu
dilakukan pemanbahan dermaga di Pelabuhan Penyeberangan
Bakauheni.

DAFTAR PUSTAKA

Andriani, Irawati.2011. Optimalisasi Waktu Sandar Penyeberangan Untuk
Meningkatkan Kinerja Pelayanan di Pelabuhan Merak-Bakauheni. Tesis.
Program Pascasarjana Teknik Sipil Kekhususan Transportasi. Universitas
Indonesia
Anonymus. 2014. Profil OPP Merak. Kementrian Perhubungan Direktorat Jendral
Perhubungan Darat. Jakarta
Karyawan, I Dewa Made Alit. 2012. Analisis Waktu Baku Pelayanan Kapal di
Pelabuhan Penyeberangan Lembar. Jurnal. Jurusan Teknik Sipil. Universitas
Mataram.
Nasution, M.Nur, 2003 , Manajemen Transpo