Adendum BOQ SPAM IKK Pinolosian Tengah

KOP PERUSAHAAN

BILL OF QUANTITY (BOQ)
REKAPITULASI
NAMA PAKET
LOKASI
TAHUN ANGGARAN

: PEMANFAATAN IDLE CAPASITY SPAM IKK PINOLOSIAN TENGAH
: KEC. PINOLOSIAN TENGAH
: 2017

NO

URAIAN

JUMLAH HARGA
(Rp)

1


2

3

I

PEKERJAAN PERSIAPAN

II

PEKERJAAN PENGADAAN DAN PAS. JARINGAN DISTRIBUSI

445,391,551.73
461,250,000.00

1,450,000.00

III

PENGADAAN DAN PEMASANGAN SAMBUNGAN RUMAH (SR)


IV

FINISHING

A

Jumlah Harga pekerjaan (Termasuk Biaya Umum dan Keuntungan)

B

Pajak Pertambahan Nilai ( PPN ) = 10 % x ( A )

C

Jumlah Total HargaPekerjaan = ( A ) + ( B )

1,000,000.00
909,091,551.73
90,909,155.17

1,000,000,706.90
1,000,000,000.00

D
Dibulatkan
Terbilang :

Satu Milyar Rupiah

………, ………………………..
Dibuat Oleh,
PT/CV…………………….

(NAMA JELAS)
(Jabatan)

KOP PERUSAHAAN
BILL OF QUANTITY (BOQ)
NAM A PAKET


: PEM ANFAATAN IDLE CAPASITY SPAM IKK PINOLOSIAN TENGAH

LOKASI
TAHUN ANGGARAN

: KEC. PINOLOSIAN TENGAH
: 2017

NO

URAIAN PEKERJAAN

SATUAN

VOLUM E

HARGA SATUAN

JUM LAH HARGA


I

PEKERJAAN PERSIAPAN

1

Papan Nama Proyek

Ls

1.00

450,000.00

1,450,000.00

450,000.00

2


Pembersihan Aw al

Ls

1.00

1,000,000.00

1,000,000.00

II

PEKERJAAN PENGADAAN DAN PAS. JARINGAN DISTRIBUSI

1

Galian Tanah Untuk Pasangan Pipa

M3


606.24

77,000.00

2

Urugan Pasir Pada Pasangan Pipa

M3

194.48

221,826.00

43,140,669.73

3

Pengadaan dan Pas Pipa PVC S-12,5 dia. 4" RR


M1

1,160.00

143,704.00

166,696,640.00

4

Pengadaan dan Pas Pipa PVC S-12,5 dia. 3" RR

M1

1,298.00

107,514.00

139,553,172.00


5

Pengadaan dan Pas Pipa PVC S-12,5 dia. 2" RR

M1

910.00

50,611.00

46,056,010.00

6

Pengadaan dan Pas. Socket Reducer PVC (All RR) Ø 6" X 4"

Bh

1.00


166,760.00

166,760.00

7

Pengadaan dan Pas. Reducer Tee All RR 6" x4"

Bh

1.00

584,540.00

584,540.00

8

Pengadaan dan Pas. Reducer Tee All RR 4" x3"


Bh

4.00

375,540.00

1,502,160.00

9

445,391,551.73

46,680,480.00

Pengadaan dan Pas. Reducer Tee All RR 3" x2"

Bh

1.00

227,040.00

227,040.00

10

Pengadaan dan Pas. End Cup All Rubber Ring 4"

Bh

1.00

178,640.00

178,640.00

11

Pengadaan dan Pas. End Cup All Rubber Ring 3"

Bh

2.00

121,440.00

242,880.00

12

Pengadaan dan Pas. End Cup All Rubber Ring 2"

Bh

4.00

90,640.00

362,560.00

III

PENGADAAN DAN PEM ASANGAN SAM BUNGAN RUM AH (SR)

450.00

461,250,000.00

1

Beugel Ø 4" x 1/ 2"

Bh

450.00

42,000.00

18,900,000.00

2

M eter Drat Ø 1/ 2"

Bh

1,800.00

17,000.00

30,600,000.00

3

Water M ur Ø 1/ 2"

Bh

450.00

26,000.00

11,700,000.00

4

Knie GIP Ø 1/ 2"

Bh

2,700.00

15,000.00

40,500,000.00

5

Stop Kran Ø 1/ 2"

Bh

450.00

54,000.00

24,300,000.00

6

Over Sock GIP Ø 3/ 4" x 1/ 2"

Bh

450.00

20,000.00

9,000,000.00

7

M eter Air Ø 1/ 2" SNI (Kuningan)

Bh

450.00

375,000.00

168,750,000.00

8

Kran Air Ø 1/ 2"

Bh

450.00

35,000.00

15,750,000.00

9

Pipa GIP Ø 1/ 2"

M1

675.00

32,000.00

21,600,000.00

10

Pipa HDPE Ø 1/ 2"

M1

2,700.00

12,000.00

32,400,000.00

11

Biaya Penyambungan

Ls

450.00

195,000.00

87,750,000.00

Ls

1.00

1,000,000.00

IV

FINISHING

1

Pembersihan Akhir

1,000,000.00

………, ………………………..
Dibuat Oleh,
PT/ CV…………………….

(NAM A JELAS)

(Jabatan)

1,000,000.00