LPSE Kabupaten Lebong SPEK DAFTAR ISI BM

SKS PEMBANGUNAN JALAN DAN JEMBATAN PERKOTAAN BENGKULU 2005

SPESIFIKASI UMUM

DAFTAR ISI
DIVISI I – UMUM

Halaman

SEKSI
Pasal

1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5

RINGKASAN PEKERJAAN
Cakupan Pekerjaan

............................................................................
Klasifikasi Pekerjaan Konstruksi ........................................................
Ketentuan Rekayasa (Engineering) .....................................................
Urutan Pekerjaan
..............................................................................
Pembayaran Pekerjaan
......................................................................

1-1
1-2
1-6
1-7
1-8

SEKSI
Pasal

1.2
1.2.1
1.2.2

1.2.3

MOBILISASI
Umum
..............................................................................................
Program Mobilisasi
............................................................................
Pengukuran dan Pembayaran
.............................................................

1-10
1-11
1-12

SEKSI
Pasal

1.3
1.3.1
1.3.2

1.3.3
1.3.4
1.3.5

KANTOR LAPANGAN DAN FASILITASNYA
Umum
..............................................................................................
Kantor Kontraktor dan Fasilitasnya .....................................................
Bengkel dan Gudang Kontraktor
........................................................
Kantor dan Akomodasi untuk Direksi Pekerjaan .................................
Pengukuran dan Pembayaran
.............................................................

1-14
1-15
1-16
1-16
1-16


SEKSI
Pasal

1.4
1.4.1
1.4.2
1.4.3
1.4.4

FASILITAS DAN PELAYANAN PENGUJIAN
Umum
..............................................................................................
Fasilitas Laboratorium dan Pengujian ..................................................
Prosedur Pelaksanaan
.......................................................................
Pengukuran dan Pembayaran
.............................................................

1-17
1-18

1-19
1-20

SEKSI
Pasal

1.6
1.6.1
1.6.2
1.6.3

PEMBAYARAN SERTIFIKAT BULANAN
Umum
..............................................................................................
Penyiapan dan Penyerahan
................................................................
Pengesahan oleh Direksi Pekerjaan
....................................................

1-23

1-24
1-25

SEKSI

1.7

PEMBAYARAN SEMENTARA (PROVISIONAL SUMS)
(Tidak ada Pembayaran Sementara di dalam Kontrak ini)

SEKSI
Pasal

1.8
1.8.1
1.8.2
1.8.3
1.8.4
1.8.5
1.8.6


PEMELIHARAAN DAN PENGATURAN LALU LINTAS
Umum
..............................................................................................
Perlindungan Pekerjaan Terhadap Kerusakan Akibat Lalu Lintas .........
Pekerjaan Jalan atau Jembatan Sementara .............................................
Pengaturan Sementara Untuk Lalu Lintas ...........................................
Pemeliharaan Untuk Keselamatan Lalu Lintas .....................................
Dasar Pembayaran
............................................................................

1-28
1-28
1-28
1-29
1-30
1-30

SEKSI
Pasal


1.9
1.9.1
1.9.2
1.9.3

REKAYASA LAPANGAN
Umum
..............................................................................................
Pekerjaan Survei Lapangan Untuk Peninjauan Kembali Rancangan ......
Pekerjaan Survei Pelaksanaan Rutin
.................................................

1-31
1-31
1-35

i

SKS PEMBANGUNAN JALAN DAN JEMBATAN PERKOTAAN BENGKULU 2005


1.9.4
1.9.5
1.9.6
1.9.7

Penetapan Titik Pengukuran ...............................................................
Tenaga Ahli Rekayasa Lapangan
.......................................................
Pengendalian Mutu Bahan
.................................................................
Dasar Pembayaran
............................................................................

1-35
1-36
1-36
1-36

SEKSI

Pasal

1.10
1.10.1
1.10.2

STANDAR RUJUKAN
Umum
..............................................................................................
Jaminan Mutu
...................................................................................

1-38
1-38

SEKSI
Pasal

1.11
1.11.1

1.11.2
1.11.3
1.11.4

BAHAN DAN PENYIMPANAN
Umum
..............................................................................................
Pengadaan Bahan
.............................................................................
Penyimpanan Bahan
..........................................................................
Pembayaran
......................................................................................

1-40
1-41
1-41
1-42

SEKSI
Pasal

1.12
1.12.1
1.12.2
1.12.3
1.12.4

JADWAL PELAKSANAAN
Umum
..............................................................................................
Detil Jadwal Pelaksanaan
..................................................................
Revisi Jadwal Pelaksanaan
................................................................
Rapat Pembuktian Keterlambatan (Show Cause Meeting) ......................

1-43
1-43
1-44
1-45

SEKSI
Pasal

1.13
1.13.1
1.13.2
1.13.3
1.13.4

PROSEDUR VARIASI
Umum
..............................................................................................
Prosedur Awal Variasi
......................................................................
Pelaksanaan Variasi
..........................................................................
Pelaksanaan Addenda
........................................................................

1-46
1-47
1-47
1-48

SEKSI
Pasal

1.14
1.14.1
1.14.2
1.14.3
1.14.4

PENUTUPAN KONTRAK
Umum
..............................................................................................
Berita Acara Penyelesaian Akhir ........................................................
Pengajuan Berita Acara Pembayaran Akhir
.......................................
Addendum Penutup
...........................................................................

1-49
1-49
1-50
1-50

SEKSI
Pasal

1.15
1.15.1
1.15.2
1.15.3
1.15.4
1.15.5

DOKUMEN REKAMAN PROYEK
Umum
..............................................................................................
Dokumen Rekaman Proyek
...............................................................
Bahan Rekaman Proyek
....................................................................
Pemeliharaan Dokumen Pelaksanaan Proyek ......................................
Dokumen Rekaman Akhir
.................................................................

1-51
1-51
1-52
1-52
1-53

SEKSI
Pasal

1.16
1.16.1
1.16.2
1.16.3
1.16.4

PEKERJAAN PEMBERSIHAN
Umum
..............................................................................................
Pembersihan Selama Pelaksanaan
.....................................................
Pembersihan Akhir
............................................................................
Dasar Pembayaran
............................................................................

1-55
1-55
1-56
1-56

SEKSI
Pasal

1.17
1.17.1
1.17.2
1.17.3
1.18
1.18.1
1.18.2
1.18.3

ASPEK LINGKUNGAN HIDUP
Umum
..............................................................................................
Upaya Pengelolaan Lingkungan (UKL) ...............................................
Dasar Pembayaran
............................................................................
RELOKASI UTILITAS DAN PELAYANAN YANG ADA
Umum
..............................................................................................
Pelaksanaan .........................................................................................
Pengukuran dan Pembayaran ...............................................................

SEKSI
Pasal

ii

1-57
1-57
1-60
1-61
1-62
1-63

SKS PEMBANGUNAN JALAN DAN JEMBATAN PERKOTAAN BENGKULU 2005

DIVISI 2 – DRAINASE
SEKSI
Pasal

2.1
2.1.1
2.1.2
2.1.3
2.1.4

SELOKAN DAN SALURAN AIR
Umum
..............................................................................................
Bahan dan Jaminan Mutu
..................................................................
Pelaksanaan
......................................................................................
Pengukuran dan Pembayaran
............................................................

2-1
2-3
2-3
2-4

SEKSI
Pasal

2.2
2.2.1
2.2.2
2.2.3
2.2.4

PASANGAN BATU DENGAN MORTAR
Umum
.............................................................................................
Bahan dan Jaminan Mutu
..................................................................
Pelaksanaan
......................................................................................
Pengukuran dan Pembayaran
.............................................................

2-6
2-8
2-8
2-10

SEKSI
Pasal

2.3
2.3.1
2.3.2
2.3.3
2.3.4

GORONG-GORONG DAN DRAINASE BETON
Umum
..............................................................................................
Bahan
..............................................................................................
Pelaksanaan
.....................................................................................
Pengukuran dan Pembayaran
............................................................

2-12
2-14
2-15
2-17

DIVISI 3 – PEKERJAAN TANAH
SEKSI
Pasal

3.1
3.1.1
3.1.2
3.1.3

GALIAN
Umum
..............................................................................................
Prosedur Penggalian
.........................................................................
Pengukuran dan Pembayaran
............................................................

3-1
3-7
3-9

SEKSI
Pasal

3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5

TIMBUNAN
Umum
..............................................................................................
Bahan
..............................................................................................
Penghamparan dan Pemadatan Timbunan ..........................................
Jaminan Mutu ……...............................................................................
Pengukuran dan Pembayaran
............................................................

3-12
3-16
3-17
3-19
3-21

SEKSI
Pasal

3.3
3.3.1
3.3.2
3.3.3
3.3.4

PENYIAPAN BADAN JALAN
Umum
..............................................................................................
Bahan
..............................................................................................
Pelaksanaan dari Penyiapan Badan Jalan
...........................................
Pengukuran dan Pembayaran
............................................................

3-23
3-25
3-25
3-26

DIVISI 4 – PELEBARAN PERKERASAN DAN BAHU JALAN
SEKSI
Pasal

4.2
4.2.1
4.2.2
4.2.3
4.2.4

BAHU JALAN
Umum
..............................................................................................
Bahan
...............................................................................................
Pelaksanaan dan Pemadatan
............................................................
Pengukuran dan Pembayaran
............................................................

iii

4-6
4-8
4-8
4-8

SKS PEMBANGUNAN JALAN DAN JEMBATAN PERKOTAAN BENGKULU 2005

DIVISI 7 STRUKTUR
SEKSI
Pasal

7.9
7.9.1
7.9.2
7.9.3
7.9.4

PASANGAN BATU
Umum
.............................................................................................
Bahan
..............................................................................................
Pelaksanaan Pasangan Batu
..............................................................
Pengukuran dan Pembayaran
............................................................

7-95
7-96
7-96
7-98

SEKSI
Pasal

7.10
7.10.1
7.10.2
7.10.3
7.10.4

PASANGAN BATU KOSONG DAN BRONJONG
Umum
.............................................................................................
Bahan
..............................................................................................
Pelaksanaan
.....................................................................................
Pengukuran dan Pembayaran
............................................................

7-100
7-101
7-102
7-103

iv

SKS PEMBANGUNAN JALAN DAN JEMBATAN PERKOTAAN BENGKULU 2005

LAMPIRAN
1.4.A

DAFTAR PERALATAN LABORATORIUM UNTUK PEMERIKSAAN
TANAH, ASPAL DAN BETON

1.10.A

EKUIVALENSI AASHTO TERHADAP SPESIFIKASI STANDAR
INDONESIA

5.4.A

PROSEDUR LAPANGAN PENGGUNAAN SCALA DCP UNTUK
PENGENDALIAN KONSTRUKSI LAPIS PONDASI SEMEN TANAH

6.2.A

METODE PENENTUAN UKURAN, BENTUK DAN GRADASI DARI
SEALING CHIP UKURAN NOMINAL 9 SAMPAI 20 MM

6.2.B

PROSEDUR STANDAR PEMERIKSAAN UNTUK MENGUKUR
TEKSTUR DENGAN MENGGUNAKAN METODE LINGKARAN PASIR

6.2.C

METODE RANCANGAN LABURAN ASPAL SATU LAPIS (BURTU) DAN
LABURAN ASPAL DUA LAPIS (BURDA)

6.3

CAMPURAN ASPAL PANAS

6.4.A

PROSEDUR RANCANGAN BAHAN PEREMAJA

6.4.B

PROSEDUR OPTIMASI VISKOSITAS BAHAN PEREMAJA

6.4.C

PROSEDUR PENGAMBILAN CONTOH UNTUK PEMERIKSAAN
ASBUTON DAN CAMPURAN LASBUTAG

6.4.E

METODE SEDERHANA UNTUK MENENTUKAN RANCANGAN
CAMPURAN NOMINAL LASBUTAG

6.4.F

METODE SEDERHANA UNTUK MENENTUKAN RANCANGAN
CAMPURAN NOMINAL LATASBUSIR

6.5.A

METODE PENYIAPAN OPTIMUM UNTUK KADAR BITUMEN
RESIDUAL CAMPURAN DINGIN KELAS E

v