LPSE Kabupaten Bondowoso BQ Palongan

REKAPITULASI BILL OF QUANTITY (BQ)
PEKERJAAN PENGADAAN/PEMASANGAN SUTM, SUTR DAN GTT
KABUPATEN BONDOWOSO
TAHUN ANGGARAN 2013

No

Lokasi

1 Dsn. Palongan, Ds. Wringin, Kec. Wringin

Pekerjaan

Vol

Sat

SUTM
SUTR
GTT 100kVA


1215
200
1

ms
mtr
set

SLO SUTM
SLO SUTR
SLO GTT

1.215
0.2
100

km
km
kVA


Harga (Rp)

Jumlah (Rp)
-

Sub Jumlah
-

-

Sub Jumlah
Jumlah
PPN (10%)
Jumlah Total
Dibulatkan

-

Terbilang :


.

.,

... 2013

Dibuat oleh,
PT/CV

(

..)
Direktur/tris

PERINCIAN BILL OF QUANTITY (BQ)
PEKERJAAN
VOLUME
LOKASI

:

:
:

Pengadaan Material dan Pemasangan SUTM 20 kV
1,215 Ms
Dsn. Palongan, Ds. Wringin, Kec. Wringin
HARGA SATUAN (Rp.)

PERINCIAN MATERIAL

No.

JENIS MATERIAL

1

2

1
2

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

43
44
45
46
47
48
49
50
51
52

A 3 C - S 150 mm2
All Bending Wire 3,2 mm2
All Tape 0,4 x 10 mm
Anchor block u/ trekschoor
Anchor Rod TM
Arm Tie Band + Boll & Nut 16 x 50 mm
Arm tie type 750 mm
Arm tie type 900 mm
Ball Clevis

Ball Isolator TM
Bolt & Nut M.16 x 400 + washer
Bolt & Nut M.16 x 500 + washer
Bolt & Nut M.16 x 120 + washer
Bolt & Nut M.16 x 140 + washer
Cross Arm 2000 mm tipe tarik
Cross Arm 2000 mm tipe tumpu
Cross Arm 3000 mm tipe tarik
Cut.Out 24 kV + Fuse link 100 A polimer
Clamp Beugles 6" - 4" u/ Ver. Stik
Dead end Clamp
Double Arm Band 8"
Double Arm Bolt & Nut M.16 x 400
Galvanis Gaspipe 0,75 x 2 Mtr
Galvanis Pipa 2" - 2 mtr u/ strut tie
HV Band Strap
Isolator Tarik 20 kV
Joint Sleve 70 mm2
Line Tape Connector
Tanda Bahaya kecil

Tiang Beton 13/350 daN GW
Tiang Beton 11/200 daN
Tiang Beton 13/350 E daN GW
Tiang Beton 9/200 daN
Steel wire 22 mm2 u/ Gnd Wire
Isolator Tumpu 20 kV
Penghalang Panjat 10"
Pipa Galv. 4" - 3 Mtr u/ Verling Stick.
Preformed grip 22 mm2 + accesories
Preformed Grip 70 mm DIA
Single Arm Band & Bolt Nuts M 16 + washer
Single GW band + Bolt&Nut M16x50
Socket Eye
Steel Wire 70 mm2
Strut Arm NP. 10 - 300 mm
Strut Tie 2" 2000mm
Terminal Lug 70 mm CU/AL.
Timble ( Kousen ) u/ GW
Turn Bukle / Spanscroef 3/4 "
U Bolt & Nut M 16 + Steel Plate

U strap
Wire Clips
Transportasi

SAT TM-1

3

TM-2

TM-4

TM4X

TM-10

3

15


1

1

3

4

5

6

7

8

Mtr
Mtr 16.2
Mtr 9.9
Bh
Bh
Bh
Bh
3
Bh
Bh
Bh
Bh
6
Bh
Bh
3
Bh
Bh
Bh
3
Bh
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
3
Btg
3
Btg
Btg
Btg
Mtr
Bh
9
Bh
3
Bh
Bh
3
Bh
Bh
Bh
Bh
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Rit

162
99

30

60

TM-5

TM-5C

GW

SP

1

18

4

9

10

11

12

6.6
10.8

0
0

5
3

2

2

3
12

0

5

3

3

18

0

6

4

4

0

6

0

3

6
3
2

3
2

18
12

30

3

15
15

3

3

18
3
3

0

6

3
3

3
3

18
18

6
6
3
3

1

1

9
3

0
0
0
0
0

1

1

3

0

1

90
15

0

1

1

1

6
3

0

1

15

1

1

3

0

1

3

3

18

0

6

3

0

2

JUMLAH HARGA (Rp.)

JUMLAH
MATRIAL

MATERIAL

PASANG

MATERIAL

PASANG

13

14

15

16

17

3,842
190
123
18
18
18
18
3
54
30
18
18
74
6
9
24
19
33
3
30
3
3
18
18
30
30
3
12
24
18
4
4
5
1,276
106
24
24
72
72
4
4
18 16
34
30
234
234
4
4
4
4
36
36
18
18
18
18
5
18
18
5
Sub Jumlah

-

-

-

-

-

-

-

-

-

-

-

-

-

JUMLAH (Rp)

18
-

-

PERINCIAN BILL OF QUANTITY (BQ)
PEKERJAAN
VOLUME
LOKASI

:
:
:

Pengadaan Material dan Pemasangan SUTR
200 mtr
Dsn. Palongan, Ds. Wringin, Kec. Wringin

KONSTRUKSI

No.

JENIS MATERIAL

1

2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Anchor block u/ trekschoor
Anchor rod TR
Arm Tie Band + Boll & Nut 16 x 50 mm
Arm tie type 900 mm
Ball Isolator TM
Bc 50 mm2 u/ Arde
Bimetal Connector 50 mm AL/CU
Bolt & Nut M.16 x 140 + washer
Bolt & Nut M.16 x 400 + washer
Bolt & Nut M.16 x 50
Bundled Conductor 3 x 70 + 1x 50 mm2
Cross Arm 3000 mm tipe tarik
Dead end tube
Double Guy Wire band
Ground rod TR
Roll Isolator
Instulated tension join 50/50 AL
Kousen u/ 35 mm
All Bending Wire 3,2 mm2
Link
Pierching connector 70/70 , 50/50
Pipa galv. 3/4" 2 mtr
Pipa PVC 2" 0.5 Mtr
Plastic strap
Pondasi HT Pole type D
Preformed grip 35 mm2
Single Arm Band & Bolt Nuts M 16 + washer
Single Guy Wire band 8"
Stainless steel strip
Steel wire 35 mm2
Stoping Buckle
Strain Clamp
Strut Arm Np. 10-250 mm
Strut Tie 2" 2000mm
Suspension Clamp
Suspension Braket
Tension Braket
Terminal lug 50
Tiang Beton 13/350 daN GW
Tiang Beton 9/200 daN
Tiang Beton 9/200E daN
Turn Bukle / Spanscroef 3/4 "
U Bolt & Nut M 16 + Steel Plate
Wire Clips
Transportasi

SAT TR-2 TR-3 TR- 3A TR 5X

3

3

1

1

4

5

6

Bh
Bh
Bh
Bh
Bh
mtr
Set
Bh
Bh
Bh
mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
mtr
Bh
Bh
Bh
Bh
Bh
9
ls
Bh
Bh
Bh
mtr 4.5
mtr
Bh
6
Bh
6
Bh
Bh
Bh
Bh
Bh
3
Bh
Bh
Bh
2
Bh
Bh
Bh
Bh
rit

7

TR 6

8

ARDE GW
1

4

9

10

HARGA SATUAN (Rp.)

JUMLAH
MATRIAL

MATERIAL

PASANG

MATERIAL

PASANG

11

12

13

14

15

16

4
4

4
4

-

-

4
8
1

-

-

-

-

-

-

-

-

-

-

4
8
1
2

4

0

4
1

8
2

2
4

0

0
4

1
2

1
2

0

0
8
4

1.5

1.5

0

0
0

0
44

2
1

2
1

0
0

0
0
0
0

1

1

0

0
0
0
2
0

0

1
4
4
4

JUMLAH HARGA (Rp.)

SP

2
210.00
8
1
8
4
4
4
2
13
8
4
8
44
10
8
5
2
2
1
4
4
4
2
Sub Jumlah

-

-

-

-

-

-

-

-

JUMLAH (Rp)

17
-

-

PERINCIAN BILL OF QUANTITY (BQ)
Pekerjaan
Volume
Lokasi

No.

JENIS MATERIAL

SAT

VOL

: Pengadaan Material dan Pemasangan GTT 20 kV-1 Tiang
:
1 Set
: Dsn. Palongan, Ds. Wringin, Kec. Wringin

HARGA SATUAN (Rp.)
MATERIAL
O. PSG
O. BKR

JUMLAH HARGA (Rp.)
JUMLAH (Rp.)
MATERIAL
O. PSG
O. BKR

1
2
3
4
5
6

POLE TOP ARRANGEMENT
Tiang Beton 13/350 E daN GW
Cross Arm 2000 mm tipe tumpu
Arm tie type 750 mm
Bolt & Nut M.16 x 400 + washer
Bolt & Nut M.16 x 50
Isolator Tumpu 20 kV

Bh
Bh
Bh
Bh
Bh
Bh

1
3
1
4
6
3

-

-

-

-

-

7
8
9
10
11
12
13
14
15
16
17

CONDUCTOR + PROTECTION
Cut.Out 24 kV + Fuse link 100 A polimer
Lighting Arrester 24 kV 10 kA
Line Tape Connector
Penghalang Panjat 10"
Tanda Bahaya besar
NYAF 25 mm2
NYAF 50 mm2
SKT 150 mm CU
SKT 25 mm CU
SKT 50 mm CU
SKT 70 mm CU

Bh
Bh
Bh
Bh
Bh
Mtr
Mtr
Bh
Bh
Bh
Bh

3
3
3
1
1
3
12
4
6
5
3

-

-

-

-

-

18
19
20
21
22
23

GROUNDING TRAFO
Ground Rod TM
Bimetal Connector 50 mm AL/CU
Bc 50 mm2 u/ Arde
Copper tube 50 mm2
Bolt Nut 12 x 50mm
Pipa Galvanis 3/4"

Bh
Bh
Mtr
Bh
Bh
Bh

5
5
15
5
5
1

-

-

-

-

-

Set

1

-

-

-

-

-

Set
1
Mtr
40
Mtr
20
Bh
8
Bh
8
Bh
3
Bh
1
Bh
2
Bh
1
Bh
2
Bh
2
Bh
4
Set
1
Bh
1
rit
1
Sub Jumlah

-

-

-

-

-

DUDUKAN TRAFO
24 Dudukan Trafo lengkap u/ 1 tiang Lengkap

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

LV PANEL
LV Panel 2 Group - 630Amp Lengkap
NYY 150 mm2
NYY 4 x 70 mm2
Copper Tube 150 mm2
Copper Tube 70 mm2
Copper Tube 25 mm2
Pipa Galvanis 3" - 6 Mtr
Pipa Galvanis 2" - 6 Mtr
Elbow Besi 3"
Elbow Besi 2"
Elbow PVC 3"
Elbow PVC 2"
Pondasi tiang type C
Distribusi Trafo 100 kVA - 20 kV ( 3 Phasa )
Transportasi

-

DAFTAR HARGA SATUAN UNTUK PEMASANGAN
SALURAN UDARA TEGANGAN MENENGAH TH 2013
No

Nama Material

Sat Harga sat Ongkos

1
A 3 C - S 150 mm2
2
All Bending Wire 3,2 mm2
3
All Tape 0,4 x 10 mm
4
Anchor block u/ trekschoor
5
Anchor Rod TM
6
Arm Tie Band + Boll & Nut 16 x 50 mm
7
Arm tie type 750 mm
8
Arm tie type 900 mm
9
Ball Clevis
10 Ball Isolator TM
11 Bolt & Nut M.16 x 400 + washer
12 Bolt & Nut M.16 x 500 + washer
13 Bolt & Nut M.16 x 120 + washer
14 Bolt & Nut M.16 x 140 + washer
15 Cross Arm 2000 mm tipe tarik
16 Cross Arm 2000 mm tipe tumpu
17 Cross Arm 3000 mm tipe tarik
18 Cut.Out 24 kV + Fuse link 100 A polimer
19 Clamp Beugles 6" - 4" u/ Ver. Stik
20 Dead end Clamp
21 Double Arm Band 8"
22 Double Arm Bolt & Nut M.16 x 400
23 Galvanis Gaspipe 0,75 x 2 Mtr
24 Galvanis Pipa 2" - 2 mtr u/ strut tie
25 HV Band Strap
26 Isolator Tarik 20 kV
27 Joint Sleve 70 mm2
28 Line Tape Connector
29 Tanda Bahaya kecil
30 Tiang Beton 13/350 daN GW
31 Tiang Beton 11/200 daN
32 Tiang Beton 13/350 E daN GW
33 Tiang Beton 9/200 daN
34 Steel wire 22 mm2 u/ Gnd Wire
35 Isolator Tumpu 20 kV
36 Penghalang Panjat 10"
37 Pipa Galv. 4" - 3 Mtr u/ Verling Stick.
38 Preformed grip 22 mm2 + accesories
39 Preformed Grip 70 mm DIA
40 Single Arm Band & Bolt Nuts M 16 + washer
41 Single GW band + Bolt&Nut M16x50
42 Socket Eye
43 Steel Wire 70 mm2
44 Strut Arm NP. 10 - 300 mm
45 Strut Tie 2" 2000mm
46 Terminal Lug 70 mm CU/AL.
47 Timble ( Kousen ) u/ GW
48 Turn Bukle / Spanscroef 3/4 "
49 U Bolt & Nut M 16 + Steel Plate
50 U strap
51 Wire Clips
52 Transportasi

Mtr
Mtr
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
Btg
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Rit

.,

... 2013

Dibuat oleh,
PT/CV

(

..)

Direktur/tris

DAFTAR HARGA SATUAN UNTUK PEMASANGAN
SALURAN UDARA TEGANGAN RENDAH TH 2013
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Nama Material
Anchor block u/ trekschoor
Anchor rod TR
Arm Tie Band + Boll & Nut 16 x 50 mm
Arm tie type 900 mm
Ball Isolator TM
Bc 50 mm2 u/ Arde
Bimetal Connector 50 mm AL/CU
Bolt & Nut M.16 x 140 + washer
Bolt & Nut M.16 x 400 + washer
Bolt & Nut M.16 x 50
Bundled Conductor 3 x 70 + 1x 50 mm2
Cross Arm 3000 mm tipe tarik
Dead end tube
Double Guy Wire band
Ground rod TR
Roll Isolator
Instulated tension join 50/50 AL
Kousen u/ 35 mm
All Bending Wire 3,2 mm2
Link
Pierching connector 70/70 , 50/50
Pipa galv. 3/4" 2 mtr
Pipa PVC 2" 0.5 Mtr
Plastic strap
Pondasi HT Pole type D
Preformed grip 35 mm2
Single Arm Band & Bolt Nuts M 16 + washer
Single Guy Wire band 8"
Stainless steel strip
Steel wire 35 mm2
Stoping Buckle
Strain Clamp
Strut Arm Np. 10-250 mm
Strut Tie 2" 2000mm
Suspension Clamp
Suspension Braket
Tension Braket
Terminal lug 50
Tiang Beton 13/350 daN GW
Tiang Beton 9/200 daN
Tiang Beton 9/200E daN
Turn Bukle / Spanscroef 3/4 "
U Bolt & Nut M 16 + Steel Plate
Wire Clips
Transportasi

Sat Harga sat Ongkos
Bh
Bh
Bh
Bh
Bh
mtr
Set
Bh
Bh
Bh
mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
mtr
Bh
Bh
Bh
Bh
Bh
ls
Bh
Bh
Bh
mtr
mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
rit
.,

... 2013

Dibuat oleh,
PT/CV

(
Direktur/tris

..)

DAFTAR HARGA SATUAN UNTUK PEMASANGAN
GARDU TRAFO 2 TIANG TH 2013
No

JENIS MATERIAL

POLE TOP ARRANGEMENT
1 Tiang Beton 13/350 E daN GW
2 Cross Arm 2000 mm tipe tumpu
3 Arm tie type 750 mm
4 Bolt & Nut M.16 x 400 + washer
5 Bolt & Nut M.16 x 50
6 Isolator Tumpu 20 kV
CONDUCTOR + PROTECTION
7 Cut.Out 24 kV + Fuse link 100 A polimer
8 Lighting Arrester 24 kV 10 kA
9 Line Tape Connector
10 Penghalang Panjat 10"
11 Tanda Bahaya besar
12 NYAF 25 mm2
13 NYAF 50 mm2
14 SKT 150 mm CU
15 SKT 25 mm CU
16 SKT 50 mm CU
17 SKT 70 mm CU
GROUNDING TRAFO
18 Ground Rod TM
19 Bimetal Connector 50 mm AL/CU
20 Bc 50 mm2 u/ Arde
21 Copper tube 50 mm2
22 Bolt Nut 12 x 50mm
23 Pipa Galvanis 3/4"
DUDUKAN TRAFO
24 Dudukan Trafo lengkap u/ 2 tiang Lengkap
25 Dudukan Trafo lengkap u/ 1 tiang Lengkap
LV PANEL
26 LV Panel 2 Group - 630Amp Lengkap
27 NYY 150 mm2
28 NYY 4 x 70 mm2
29 Copper Tube 150 mm2
30 Copper Tube 70 mm2
31 Copper Tube 25 mm2
32 Pipa Galvanis 3" - 6 Mtr
33 Pipa Galvanis 2" - 6 Mtr
34 Elbow Besi 3"
35 Elbow Besi 2"
36 Elbow PVC 3"
37 Elbow PVC 2"
38 Pondasi tiang type C
39 Distribusi Trafo 100 kVA - 20 kV ( 3 Phasa )
40 Distribusi Trafo 50 kVA - 20 kV ( 3 Phasa )
41 Transportasi

SAT

HARGA
SATUAN

ONGKOS
PASANG

Bh
Bh
Bh
Bh
Bh
Bh

-

-

Bh
Bh
Bh
Bh
Bh
Mtr
Mtr
Bh
Bh
Bh
Bh

-

-

Bh
Bh
Mtr
Bh
Bh
Bh

-

-

Set
Set

-

-

Set
Mtr
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Bh
Bh
rit

-

-

.,

... 2013

Dibuat oleh,
PT/CV

(
Direktur/tris

..)

DAFTAR HARGA SATUAN
PEKERJAAN SERIFIKASI LAIK OPERASI (SLO)

No

URAIAN KEGIATAN

BIAYA (Rp)

SAT

KETERANGAN

1 SUTM
0 s/d 0.25

kms

Rp.

-

-

0.26 s/d 0.5
0.51 s/d 0.75

kms
kms

Rp.
Rp.

-

-

0.76 s/d 2.5

kms

Rp.

-

-

2.6 s/d 5

kms

Rp.

-

-

5.1 s/d 20
20.1 s/d 60

kms
kms

Rp.
Rp.

-

-

60.1 s/d 80

kms

Rp.

-

-

80.1 s/d 100

kms

Rp.

-

-

100.1 & keatas

kms

Rp.

-

-

2 SKTM

-

0 s/d 0.25
0.26 s/d 0.5

kms
kms

Rp.
Rp.

-

-

0.51 s/d 0.75

kms

Rp.

-

-

0.76 s/d 1

kms

Rp.

-

-

1.1 s/d 1.5

kms

Rp.

-

-

1.6 s/d 2
3 Gardu Trafo

kms

Rp.

-

-

s/d 50

kVA

Rp.

-

Portal/Control

100 s/d 200

kVA

Rp.

-

Portal/Control

250 s/d 400

kVA

Rp.

-

Portal/Control

500 s/d 630
800 s/d 2000

kVA
kVA

Rp.
Rp.

-

Portal/Control
Portal/Control

2500 s/d keatas

kVA

Rp.

-

Portal/Control

4 SUTR
0 s/d 0.25
0.26 s/d 0.5
0.51 s/d 0.75

km
km
km

Rp.
Rp.
Rp.

0.76 s/d 2.5

km

2.6 s/d 5

km

5.1 s/d 20

-

-

Rp.

-

-

Rp.

-

-

km

Rp.

-

-

20.1 s/d 60
60.1 s/d 80

km
km

Rp.
Rp.

-

-

80.1 s/d 100

km

Rp.

-

-

100.1 s/d keatas

km

Rp.

-

-

5 Cubicle
Cubicle Single Incoming
Cubicle Double Incoming
Gardu Konvensional
Cubicle 20 KV lengkap dengan proteksi
Incoming 20 KV Trafo
Bus Coupler 20 KV

Set
Set
Set
Unit
Unit
Unit

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

-

1 Incoming - 1 Outgoing - 1 Pengukuran
2 Incoming - 1 Outgoing - 1 Pengukuran
-

.,

... 2013

Dibuat
oleh,
CV.
BANGUN SEJAJAR PRIMA
PT/CV

(
Direktur/tris

..)