BQ Rumah Dinas RSU 2011 Lelang Ulang

BILL OF QUANTITY ( B . Q )
NO

JENIS PEKERJAAN

I
1
2
3
4
5
6

II
1
2
3
4
5

III

1
2
3
4
5

IV
1
2
3
4

V
1
2
3
4

VI
1

2
3
4
5
7
8

VII

PEKERJAAN PENDAHULUAN
PEK. PENGUKURAN DAN PEMASANGAN BOUWPLANK
PEK. PEMBERSIHAN AWAL DAN AHIR PEKERJAAN
PEK. DIREKSI KEET / BARAK KERJA
PEK. DOKUMENTASI & PELAPORAN
PEK. AIR KERJA
PEK. PAPAN NAMA PROYEK

PEKERJAAN BANGUNAN
PEK. GALIAN TANAH PONDASI BATU BATA
PEK. URUGAN TANAH KEMBALI PONDASI BATU BATA

PEK. PASIR URUG PONDASI BATU BATA
PEK. PAS. LANTAI KERJA
PEK. PAS. PONDASI BATU BATA

PEKERJAAN STRUKTUR
PEK. SLOOF BETON BERTULANG 15/20
PEK. KOLOM 10/10 BETON BERTULANG
PEK. RING BALOK 10/15
PEK. ATAP DAK BETON T=8 CM
PEK. ATAP DAK BETON T=5 CM (PINTU & JENDELA)

PEKERJAAN DINDING DAN PLESTERAN
PEK. PAS. DINDING BATA 1/2 BATA ( 1 : 4 )
PEK. PAS. DINDING BATA 1/2 BATA ( 1 : 3 )
PEK. PLESTERAN (1 : 4)
PEK. PLESTERAN (1 : 3)

PEKERJAAN KUDA-KUDA & PENUTUP ATAP
PEK. PAS. KUDA-KUDA
PEK. PAS. GORDING & RANGKA ATAP

PEK. PAS. ATAP MULTI ROOF
PEK. PAS. LISPLANK 2/20

PEKERJAAN LANTAI
PEK. URUGAN TANAH BAWAH LANTAI
PEK. URUGAN PASIR BAWAH LANTAI T=5 CM
PEK. COR LANTAI 1 : 3 : 5
PEK. PAS. LANTAI KERAMIK 30/30
PEK. PAS. LANTAI KERAMIK 20/20
PEK. PAS. DINDING KERAMIK 20/20
PEK. PAS. PLIN KERAMIK

PEKERJAAN RABAT KELILING BANGUNAN
1 PEK. URUGAN PASIR T = 10 CM
2 PEK. COR RABAT 1 : 3 : 5 T = 5 CM

VOLUME
72,00
1,00
1,00

1,00
1,00
1,00

14,74
3,69
1,80
0,90
43,20

2,08
0,93
1,04
0,69
0,13

145,00
39,50
290,01
79,00


1,54
2,03
137,56
9,00

8,11
4,05
4,05
76,10
4,78
16,59
4,10

3,34
1,67

SAT

HARGA SATUAN


JUMLAH

M'
M2
Ls
Ls
Ls
Ls
JUMLAH Rp

-

JUMLAH Rp

-

JUMLAH Rp

-


JUMLAH Rp

-

JUMLAH Rp

-

JUMLAH Rp

-

JUMLAH Rp

-

M3
M3
M3

M3
M2

M3
M3
M3
M3
M3

M2
M2
M2
M2

M3
M3
M3
M2

M3

M3
M3
M2
M2
M2
M1

M3
M3

NO
VIII

JENIS PEKERJAAN
PEKERJAAN PLAFOND
1 PEK. PAS. RANGKA PLAFOND, KAYU
2 PEK. PAS. PLAFOND TRIPLEK
3 PEK. PAS. LIST PLAFOND

IX

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

X
1
2
3
4
5
6
7

XI
1
2
3
4
5
6
7
XII

PEKERJAAN KUSEN, PINTU, JENDELA & KUNCI
PEK. PAS. KUSEN PINTU PJ1
PEK. PAS. KUSEN PINTU P1
PEK. PAS. KUSEN PINTU P2
PEK. PAS. PINTU P3 (KM/WC)
PEK. PAS. PINTU P4 (ROLLING DOOR)
PEK. PAS. KUSEN JENDELA J1
PEK. PAS. KUSEN JENDELA J2
PEK. PAS. KUSEN JENDELA J3
PEK. PAS. KUSEN JENDELA J4
PEK. PAS. KUSEN JENDELA J5
PEK. PAS. KUSEN VENTILASI V1
PEK. PAS. DAUN PINTU PJ1
PEK. PAS. DAUN PINTU P1
PEK. PAS. DAUN PINTU P2
PEK. PAS. DAUN JENDELA PJ1
PEK. PAS. DAUN JENDELA J2
PEK. PAS. DAUN JENDELA J4
PEK. PAS. DAUN JENDELA J5
PEK. PAS. KACA T = 4 MM
PEK. PAS. KUNCI TANAM DOUBLE
PEK. PAS. KUNCI TANAM BIASA
PEK. PAS. KUNCI TANAM KM/WC
PEK. PAS. ENGSEL PINTU 4"
PEK. PAS. ENGSEL JENDELA 3"
PEK. PAS. HAK ANGIN

PEKERJAAN PASANG TERALIS PINTU DAN JENDELA
PEK. PAS. TERALIS PINTU PJ1
PEK. PAS. TERALIS PINTU P1
PEK. PAS. TERALIS JENDELA J1
PEK. PAS. TERALIS JENDELA J2
PEK. PAS. TERALIS JENDELA J3
PEK. PAS. TERALIS JENDELA J4
PEK. PAS. TERALIS JENDELA J5

PEKERJAAN SANITASI
PEK. PAS. CLOSED JONGKOK
PEK. PAS. BAK FIBERGLASS
PEK. PAS. PIPA
PEK. PAS. KRAN AIR
PEK. PAS. FLOOR DRAIN
PEK. PAS. ROOF DRAIN
PEK. SEPTICTANK

PEKERJAAN INSTALASI LISTRIK
1 PEK. PASANG INSTALASI LISTRIK

VOLUME
122,70
122,70
87,43

0,08
0,02
0,12
2,00
6,30
0,09
0,06
0,04
0,16
0,04
0,03
1,68
2,94
1,68
0,58
0,29
0,58
0,87
10,32
1,00
3,00
2,00
18,00
20,00
20,00

3,75
3,00
3,00
2,27
1,08
1,51
2,27

2,00
2,00
27,00
2,00
2,00
2,00
1,00

35,00

SAT

HARGA SATUAN

JUMLAH

M2
M2
M'
JUMLAH Rp

-

JUMLAH Rp

-

JUMLAH Rp

-

JUMLAH Rp

-

M3
M3
M3
Bh
M2
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh

M2
M2
M2
M2
M2
M2
M2

Bh
Bh
M1
Bh
Bh
Bh
Bh

Ttk

2
3
4
5
6
7
8

XIII

XIV

PEK. PEMASUKAN ARUS 1300 Ampere
PEK. PASANG LAMPU PIJAR
PEK. PASANG LAMPU
PEK. PASANG STOP KONTAK
PEK. PASANG SAKLAR TUNGGAL
PEK. PASANG SAKLAR GANDA
PEK. PASANG MCB

PEKERJAAN PENGECATAN
1 PEK. CAT KUSEN PINTU & JENDELA
2 PEK. CAT DAUN KUSEN PINTU & DAUN JENDELA
3 PEK. CAT TEMBOK (1 X PLAMOUR + 2 X CAT WARNA)

1,00 Unit
16,00 Bh
19,00 Bh
4,00 Bh
1,00 Bh
5,00 Bh
1,00 Bh

20,79
12,16
290,01

JUMLAH Rp

-

JUMLAH Rp

-

JUMLAH Rp

-

M2
M2
M2

PEKERJAAN PEMBUATAN SUMUR GALI
1 PEK. GALIAN TANAH SUMUR

10,00

2 PAS. CINCIN BETON (GORONG-GORONG) Dia. 80 Cm

M'

11,00

M'

3 PEK. MESIN POMPA AIR

1,00

Ls

4 PEK. INSTALASI PIPA AIR BERSIH

1,00

Ls