LPSE Kabupaten Aceh Utara
RENCANA UMUM PENGADAAN (RUP) UNTUK PAKET-PAKET PEKERJAAN
DILINGKUNGAN DINAS PENGAIRAN DAN ESDM KABUPATEN ACEH UTARA TAHUN 2012
NO.
KEGIATAN/
URAIAN PEKERJAAN
LOKASI/
KECAMATAN
VOLUME
NILAI PAGU
(Rp)
KET.
1
2
3
4
5
6
I.
PEKERJAAN KONSTRUKSI (K)
3,210,000,000.00
OPTIMALISASI FUNGSI JARINGAN IRIGASI YANG TELAH
DIBANGUN
3,210,000,000.00
1
Rehab Darurat Saluran Sekunder BJA.1 - BLS.1g Kec. Baktiya
2
Rehab Darurat Saluran Sekunder BLS.1g - BLS.1 Kec. Lhoksukon
Baktiya
1 Paket
2,175,000,000.00
Lhoksukon
1 Paket
1,035,000,000.00
TOTAL
3,210,000,000.00
DILINGKUNGAN DINAS PENGAIRAN DAN ESDM KABUPATEN ACEH UTARA TAHUN 2012
NO.
KEGIATAN/
URAIAN PEKERJAAN
LOKASI/
KECAMATAN
VOLUME
NILAI PAGU
(Rp)
KET.
1
2
3
4
5
6
I.
PEKERJAAN KONSTRUKSI (K)
3,210,000,000.00
OPTIMALISASI FUNGSI JARINGAN IRIGASI YANG TELAH
DIBANGUN
3,210,000,000.00
1
Rehab Darurat Saluran Sekunder BJA.1 - BLS.1g Kec. Baktiya
2
Rehab Darurat Saluran Sekunder BLS.1g - BLS.1 Kec. Lhoksukon
Baktiya
1 Paket
2,175,000,000.00
Lhoksukon
1 Paket
1,035,000,000.00
TOTAL
3,210,000,000.00