BOQ E Board Addendum
PEMERINTAH KABUPATEN KUTAI TIMUR
SEKRETARIAT DAERAH
Jl.Soekarno Hatta No.1 Pusat Perkantoran Bukit Pelangi Telp.(0549) 25050 Fax (0549) 25170
SENGATA
RINCIAN ANGGARAN BIAYA
PROGRAM
:
PENINGKATAN SARANA DAN PRASARANA
KEGIATAN
PEKERJAAN
:
:
PENGADAAN PERLENGKAPAN GEDUNG KANTOR
PENGADAAN ELEKTRONIK BOARD (E-BOARD) DI STADION UTAMA SANGATTA
LOKASI
TAHUN
:
:
SANGATTA
2016
I. Pengadaan / Pemasangan Perimeter LED Display
NO
URAIAN
I
1
OUTDOOR FULL COLOR LED TORING DISPLAY
Parimeter screen type P10 DIP
Pixel pich 10 mm
Chip set : SMD 3535
Screen size : 96 m x 0.96m
Cabinet Size : 960 mm (Width) x 960 mm (Height)
Cabinet quantity : 100 Pcs
Cabinet Design : with inside going cable
Cabinet Sty`
Cabinet material : Cold rolled Steel sheet
Lamp : Epistar
Mask : Soft rubber mask
Added : Component with rusty prevention
Brighness : >7000 Mits
Display color : 4.4 Trilion
Source compabillity : TV, VGA, S-Video, Video, DVI, HDMI
Energy saving system
Dust proof
Water proof
PCB cabel system for each modul
2
HARGA
SATUAN
(Rupiah)
KUANTITAS
120,35
m
1
set
LED VIDEO CONTROL SYSTEM
Sending card M Control 300
Receiving Card cabinet
1
set
1
unit
3
Work station based controler unit
1
set
1
unit
4
AVR 60 KVA
1
set
1
unit
5
Pembangunan Rangka Besi display
Pondasi besi penyangga screen
1
set
78
unit
6
Cabinet cover protection (White not use)
1
set
1
unit
7
Home UPS inventer 850 VA + batterey tubular 100 AH
1
set
78
unit
8
Notebook untuk akses monitoring system
1
set
2
unit
9
Harddisk eksternal 2 TB
1
set
1
unit
SUB JUMLAH
JUMLAH TOTAL
(Rupiah)
I. Pengadaan / Pemasangan Perimeter LED Display
NO
URAIAN
HARGA
SATUAN
(Rupiah)
KUANTITAS
1
1.1.
1.2.
1.3.
1.4.
Tim Leader
Tenaga Ahli Jaringan
Tenaga Ahli Jaringan
System Support
2
Transportasi dan akomodasi
2.1. Biaya Perjalanan
2.2. Akomodasi dan Mobilisasi personil di daerah
Penginapan/sewa rumah, konsumsi, transport lokal
8
16
16
32
OB
OB
OB
OB
8
240
OT
OH
JUMLAH TOTAL
(Rupiah)
SUB JUMLAH
Jumlah Sub Total
PPN 10%
TOTAL
Terbilang :
Sangatta,
2016
Perusahaan,
Direktur
SEKRETARIAT DAERAH
Jl.Soekarno Hatta No.1 Pusat Perkantoran Bukit Pelangi Telp.(0549) 25050 Fax (0549) 25170
SENGATA
RINCIAN ANGGARAN BIAYA
PROGRAM
:
PENINGKATAN SARANA DAN PRASARANA
KEGIATAN
PEKERJAAN
:
:
PENGADAAN PERLENGKAPAN GEDUNG KANTOR
PENGADAAN ELEKTRONIK BOARD (E-BOARD) DI STADION UTAMA SANGATTA
LOKASI
TAHUN
:
:
SANGATTA
2016
I. Pengadaan / Pemasangan Perimeter LED Display
NO
URAIAN
I
1
OUTDOOR FULL COLOR LED TORING DISPLAY
Parimeter screen type P10 DIP
Pixel pich 10 mm
Chip set : SMD 3535
Screen size : 96 m x 0.96m
Cabinet Size : 960 mm (Width) x 960 mm (Height)
Cabinet quantity : 100 Pcs
Cabinet Design : with inside going cable
Cabinet Sty`
Cabinet material : Cold rolled Steel sheet
Lamp : Epistar
Mask : Soft rubber mask
Added : Component with rusty prevention
Brighness : >7000 Mits
Display color : 4.4 Trilion
Source compabillity : TV, VGA, S-Video, Video, DVI, HDMI
Energy saving system
Dust proof
Water proof
PCB cabel system for each modul
2
HARGA
SATUAN
(Rupiah)
KUANTITAS
120,35
m
1
set
LED VIDEO CONTROL SYSTEM
Sending card M Control 300
Receiving Card cabinet
1
set
1
unit
3
Work station based controler unit
1
set
1
unit
4
AVR 60 KVA
1
set
1
unit
5
Pembangunan Rangka Besi display
Pondasi besi penyangga screen
1
set
78
unit
6
Cabinet cover protection (White not use)
1
set
1
unit
7
Home UPS inventer 850 VA + batterey tubular 100 AH
1
set
78
unit
8
Notebook untuk akses monitoring system
1
set
2
unit
9
Harddisk eksternal 2 TB
1
set
1
unit
SUB JUMLAH
JUMLAH TOTAL
(Rupiah)
I. Pengadaan / Pemasangan Perimeter LED Display
NO
URAIAN
HARGA
SATUAN
(Rupiah)
KUANTITAS
1
1.1.
1.2.
1.3.
1.4.
Tim Leader
Tenaga Ahli Jaringan
Tenaga Ahli Jaringan
System Support
2
Transportasi dan akomodasi
2.1. Biaya Perjalanan
2.2. Akomodasi dan Mobilisasi personil di daerah
Penginapan/sewa rumah, konsumsi, transport lokal
8
16
16
32
OB
OB
OB
OB
8
240
OT
OH
JUMLAH TOTAL
(Rupiah)
SUB JUMLAH
Jumlah Sub Total
PPN 10%
TOTAL
Terbilang :
Sangatta,
2016
Perusahaan,
Direktur