WINRIP DOC MPR CTC MPR No.30 2015 06 20150630 00271
TECHNICAL ASSISTANCE FOR SUPPORT OF THE PROJECT MANAGEMENT UNIT
coRE TEAM CONSULTANTS (CTC)
Monthly Progress Report No. 30
Govering Project Activities During
June 2415
I
t
t
I
t
I
I
I
I
I
I
I
I
I
I
t
I
I
I
t
I
MINISTRY OF PUBLIC WORKS & HOUSING
DIRECTORATE GENERAL OF HIGHWAYS
DIRECTORATE OF PLANNING
Core Team Consultant
for
Western Indonesia National Roads Imprcvement Project (WII{RIP)
IBRD Loan llo.80'13-ID
Our
Ref.No. : 03 02/CTtuO/M-06.2015
Jakarta, July 10, 2015
Directorate General of Highways, MPWH
Jl, Patimura 20 Kebayoran Baru
Jakarta Selatan
lndonesia
Aftention
:
lr. Agusta Ersada Sinulingga , MT
Officer In Charge PMU WINRIP
Subject
.
Submission of June 2015 Monthly Progress Report No.30;WlNRlP Loan IBRD No.8043-lD
Dear Sir,
In compliance with the Terms of Reference of our Consultancy Contract, we submit herewith the Monthly
Progress Report No.30 covering the month of June 2015.
This Report is reproduced in twenty (20) copies for distribution to all concemed authorities.
Should you have any comment or additional information that need to be incorporated in the Report, please
feelfree to get in touch with us.
1.
z
?
4.
8.
9.
10.
11.
12.
13.
14.
Direktur Jenderal Bina Marga
Inspektorat Jenderal, Kementrian PU-PERA
Direktur Transportasi - Bappenas
Direktur Pengelolaan Kas Negara (PKN), Kementrian Keuangan
Direktur Pengembangan Jaringan Jalan, Dit.Jen Bina Marga
Direktur FasilitasiJalan Daerah, Dit.Jen Bina Marga
Direktur Pembangunan Jalan, Dit.Jen Bina Marga
Direktur Preservasi Jalan, Dit.Jen Bina Marga
Biro Perencanaan & KLN, Kementrian PU-PERA
Kasubdit Kawasan Strategis dan Andalan, Kementrian Dalam Negeri
Kasubdit Pembiayaan dan Keflasama Luar Negeri
Kasubdit Wilayah B, Direktorat Bina Pelaksana Wilayah l, DJBM
Kasubdit Wilayah C, Direktorat Bina Pelaksana Wilayah I, DJBM
Kasubdit Wilayah D, Direktorat Bina Pelaksana Wilayah l, DJBM
Kepala Satker Pembinaan Administrasi dan Pelaksanaan Pengendalian PHLN
PT. Perentjana Djaja
Yongma Engineering Co, Ltd
PT. Epadascon Permata Engineering Consultant
15.
16.
17.
18.
19. File
PT. PERENTIAM DJAJA in subconsultancy
with f;lt
CTC Office:
Yongrna Entineering Co.
Itd and *aPT. Epadascon Permata Engineering Consultant
ll. Ciniru Vll No. 25, Kebayoran 8aru, Jakarta Selatan, 12180
Pho ne /Fax: (O2ll 7 229823
4
I
=
I o=
I uo
J
I F(J
UI
I oc?
&
I
I
t
t
I
I
I
t
I
t
I
I
2/
l4
t.!./
:
coRE TEAM CONSULTANTS (CTC)
Monthly Progress Report No. 30
Govering Project Activities During
June 2415
I
t
t
I
t
I
I
I
I
I
I
I
I
I
I
t
I
I
I
t
I
MINISTRY OF PUBLIC WORKS & HOUSING
DIRECTORATE GENERAL OF HIGHWAYS
DIRECTORATE OF PLANNING
Core Team Consultant
for
Western Indonesia National Roads Imprcvement Project (WII{RIP)
IBRD Loan llo.80'13-ID
Our
Ref.No. : 03 02/CTtuO/M-06.2015
Jakarta, July 10, 2015
Directorate General of Highways, MPWH
Jl, Patimura 20 Kebayoran Baru
Jakarta Selatan
lndonesia
Aftention
:
lr. Agusta Ersada Sinulingga , MT
Officer In Charge PMU WINRIP
Subject
.
Submission of June 2015 Monthly Progress Report No.30;WlNRlP Loan IBRD No.8043-lD
Dear Sir,
In compliance with the Terms of Reference of our Consultancy Contract, we submit herewith the Monthly
Progress Report No.30 covering the month of June 2015.
This Report is reproduced in twenty (20) copies for distribution to all concemed authorities.
Should you have any comment or additional information that need to be incorporated in the Report, please
feelfree to get in touch with us.
1.
z
?
4.
8.
9.
10.
11.
12.
13.
14.
Direktur Jenderal Bina Marga
Inspektorat Jenderal, Kementrian PU-PERA
Direktur Transportasi - Bappenas
Direktur Pengelolaan Kas Negara (PKN), Kementrian Keuangan
Direktur Pengembangan Jaringan Jalan, Dit.Jen Bina Marga
Direktur FasilitasiJalan Daerah, Dit.Jen Bina Marga
Direktur Pembangunan Jalan, Dit.Jen Bina Marga
Direktur Preservasi Jalan, Dit.Jen Bina Marga
Biro Perencanaan & KLN, Kementrian PU-PERA
Kasubdit Kawasan Strategis dan Andalan, Kementrian Dalam Negeri
Kasubdit Pembiayaan dan Keflasama Luar Negeri
Kasubdit Wilayah B, Direktorat Bina Pelaksana Wilayah l, DJBM
Kasubdit Wilayah C, Direktorat Bina Pelaksana Wilayah I, DJBM
Kasubdit Wilayah D, Direktorat Bina Pelaksana Wilayah l, DJBM
Kepala Satker Pembinaan Administrasi dan Pelaksanaan Pengendalian PHLN
PT. Perentjana Djaja
Yongma Engineering Co, Ltd
PT. Epadascon Permata Engineering Consultant
15.
16.
17.
18.
19. File
PT. PERENTIAM DJAJA in subconsultancy
with f;lt
CTC Office:
Yongrna Entineering Co.
Itd and *aPT. Epadascon Permata Engineering Consultant
ll. Ciniru Vll No. 25, Kebayoran 8aru, Jakarta Selatan, 12180
Pho ne /Fax: (O2ll 7 229823
4
I
=
I o=
I uo
J
I F(J
UI
I oc?
&
I
I
t
t
I
I
I
t
I
t
I
I
2/
l4
t.!./
: