LPSE Kabupaten Labuan Batu Selatan PAKET 25 (II)

DAFTAR KOREKSI ARITM ATIK
NO PAKET

: 25

KEGIATAN

: LANJUTAN PEM BANGUNAN PARIT BETON DIDUSUN AEK BATU UTARA DESA ASAM JAW A KECAM ATAN TORGAM BA

HPS

: Rp

510,000,000.00
CV.NABIL
URAIAN PEKERJAAN

NO

SATUAN


VOLUM E

HARGA
SATUAN
(Rp.)

JUM LAH
DIBULATKAN
PERSENTASE
RANKING

CV.TANGGA REZEKI

CV. SENTRAL PEM BANGUNAN INDONESIA

JUM LAH HARGA

HARGA SATUAN

JUM LAH HARGA


HARGA SATUAN

JUM LAH HARGA

(Rp.)

(Rp.)

(Rp.)

(Rp.)

(Rp.)

505,767,328.00
505,767,000.00
99.17
2


507,054,035.00
507,054,000.00
99.42
3

504,292,350.00
504,292,000.00
98.88
1