KONTRIBUSI CHECK DAM DI SUNGAI KEDUANG DALAM MENAHAN SEDIMEN YANG MASUK KE WADUK WONOGIRI.

perpustakaan.uns.ac.id

digilib.uns.ac.id

commit to user

perpustakaan.uns.ac.id

digilib.uns.ac.id

KONTRIBUSI CHECK DAM DI SUNGAI KEDUANG
DALAM MENAHAN SEDIMEN YANGMASUK
KE WADUK WONOGIRI
TESIS
Disusun Oleh:

ABDUL MAHMUD
S941302010
Telah disetujui oleh Tim Pembimbing
Tim Pembimbing:


Jabatan

Nama

Tanda Tangan

Tanggal

Pembimbing I

Dr. Ir. Mamok Suprapto, M.Eng.
........................
NIP. 19510710 198103 1 003

..................

Pembimbing II

Prof. Dr. Ir. Sobriyah, M.S
NIP. 19480422 198503 2 001


..................

........................

Mengetahui,
Ketua Program Studi Magister Teknik Sipil
Program Pasca Sarjana UNS

Dr. Ir. Mamok Suprapto, M.Eng.
commit to user
NIP. 1951710
198103 1 003
ii

perpustakaan.uns.ac.id

digilib.uns.ac.id

KONTRIBUSI CHECK DAM DI SUNGAI KEDUANG

DALAM MENAHAN SEDIMEN YANG MASUK
KE WADUK WONOGIRI

TESIS
Oleh

ABDUL MAHMUD
S941302010
Telah dipertahankan di hadapan Tim Penguji Pendadaran Tesis
Program Studi Magister Teknik Sipil Universitas Sebelas Maret Surakarta
pada hari Rabu, tanggal 06 Mei 20151 Januari 2011
Dewan Penguji:
Jabatan

Nama

Tanda Tangan

Ketua


Dr. Niken Silmi Surjandari, ST., MT
NIP. 19690903 199702 2 001

........................

Sekretaris

Dr. Eng. Syafi’i, M.T.
NIP. 196706021997021001

........................

Penguji I

Dr. Ir. Mamok Suprapto, M. Eng
NIP. 195107101981031003

........................

Penguji II


Prof. Dr. Ir. Sobriyah, MS
NIP. 19480422 198503 2 001

........................

Mengetahui:
Direktur Program
Pascasarjana

Ketua Program Studi
Magister Teknik Sipil

Prof. Dr. Ir. Ahmad Yunus, M.S commit to userDr. Ir. Mamok Suprapto, M. Eng
NIP. 196107171986011001
NIP. 195107101981031003

iii

perpustakaan.uns.ac.id


digilib.uns.ac.id

PERNYATAAN

Yang bertanda tangan di bawah ini:

Nama

: Abdul Mahmud

NIM

: S941302010

Menyatakan dengan sesungguhnya bahwa tesis yang berjudul:

KONTRIBUSI CHECK DAM DI SUNGAI KEDUANG
DALAM MENAHAN SEDIMEN YANG MASUK
KE WADUK WONOGIRI


adalah betul-betul karya sendiri. Hal-hal yang bukan karya saya, tertulis dalam tesis
tersebut, diberi tanda citasi dan ditunjukkan dalam Daftar Pustaka.
Apabila dikemudian hari terbukti pernyataan saya tidak benar, maka saya
bersedia menerima sanksi akademik berupa pencabutan tesis dan gelar yang saya
peroleh dari gelar tersebut.

Surakarta,

Mei 2015

Yang membuat pernyataan

Abdul Mahmud
S941302010

commit to user

iv


perpustakaan.uns.ac.id

digilib.uns.ac.id

UCAPAN TERIMA KASIH

Dengan mengucap syukur Alhamdulillah, akhirnya penulis dapat
menyelesaikan tesis ini dengan baik. Tesis dengan judul Kontribusi Check Dam
Di Sungai Keduangdalam Menahan Sedimen Yang Masuk Ke Waduk
Wonogiridapat terselesaikan berkat bantuan dari beberapa pihak. Untuk itu pada
kesempatan ini penulis ingin mengucapkan terima kasih yang sebesar-besarnya
kepada:
1. Rektor Universitas Sebelas Maret Surakarta.
2. Direktur Program Pasca Sarjana Universitas Sebelas Maret Surakarta.
3. Balai Pengembangan Sumber Daya Manusia Wilayah II Semarang,
Kementerian Pekerjaan Umun dan Perumahan Rakyat yang telah
memberikan beasiswa pendidikan kepada penulis.
4. Dr. Ir. Mamok Suprapto, M.Eng. Ketua Program Studi Magister Teknik
Sipil Universitas Sebelas Maret Surakarta dan selaku Pembimbing Utama
Tesis.

5. Dr. Eng Syafi’I, MT. Sekretaris Program Studi Magister Teknik Sipil
Universitas Sebelas Maret Surakarta dan selaku Dosen Penguji yang
memberikan pemahaman serta saran dalam penyempurnaan penyusunan
tesis.
6. Prof. Dr. Ir. Sobriyah, selaku Dosen Pembimbing Akademik dan selaku
Dosen Pembimbing Pendamping.
7. Dr. Niken Silmi Surjandari, ST., MT.,selaku Dosen Penguji yang
memberikan pemahaman dan saran dalam penyempurnaan penyusunan
tesis.
8. Segenap Staf Pengajar Program Studi Magister Teknik Sipil Universitas
Sebelas Maret Surakarta yang telah mau berbagi ilmu dan pengalaman
melalui perkuliahan.
9. Teman-teman Mahasiswa Magister Teknik Sipil Universitas Sebelas
commit to user
Maret Surakarta angkatan 2013 atas kekompakannya. Terima kasih telah

v

perpustakaan.uns.ac.id


digilib.uns.ac.id

menjadi kakak dan sahabat bagi penulis. Kalian adalah keluargaku selama
di Solo.
10. Bapak, Ibu dan Keluarga di Klaten yang begitu sabar dan ikhlas dalam
membantu kelancaran serta kesuksesan kuliah.
11. Istriku Sri handayani dan anakku Amanda Insyira Azzahraatas
pengorbanan, kerelaan, serta ketabahan sehingga penulis mampu
menyelesaikan studi lanjut ini.
12. Mas Januar dan mas Agus yang tak mengenal lelah dalam melayani dan
membantu proses perkuliahan.
13. Semua pihak yang telah membantu penulis dalam menyelesaikan tesis ini
namun tidak dapat penulis sebutkan satu persatu. Tidak ada yang bisa
penulis berikan sebagai imbalan, hanya do’a semoga Tuhan memberi
balasan.
Atas bantuan yang telah bapak dan ibu berikan semoga mendapat balasan
yang setimpal dati Allah SWT, Amin.

Surakarta, Mei 2015
Penulis


Abdul Mahmud

commit to user

vi

perpustakaan.uns.ac.id

digilib.uns.ac.id

Abdul Mahmud, 2015. Kontribusi Check Dam Di Sungai Keduang dalam Menahan
Sedimen Yang Masuk Ke Waduk Wonogiri. Pembimbing I: Dr. Ir. Mamok Suprapto,
M. Eng. Pembimbing II:Prof. Dr. Ir. Sobriyah. Tesis Magister Teknik Sipil, Minat
Utama Teknik Rehabilitasi dan Pemeliharaan Bangunan Sipil, Program Pascasarjana,
Universitas Sebelas Maret, Surakarta.

ABSTRAK
Tutupan lahan di DAS Keduang kurang dari 10 persen. Kondisi ini
menyebabkan erosi permukaan lahan yang cukup tinggi. Hasil erosi terbawa
masuk ke Waduk Wonogiri. Untuk mengurangi laju sedimentasi di Waduk
Wonogiri, maka telah dibangun sejumlah check dam di Sungai Keduang.Check
dam yang telah dibangun di Sungai Keduang hingga saat ini ada sejumlah 21
buah. Namun laju sedimen yang masuk ke waduk Wonogiri masih tetap
tinggi.Dengan demikian menarik untuk dilakukan kajian mengenai kapasitas
check dam yang sudah ada dalam hal menahan laju sedimen.Penelitian ini
bertujuan mengetahui laju erosi, laju sedimen dan sedimen yang mengendap di
check dam.
Metode penelitian yang dilaksanakan adalah: mengumpulkan data primer
dan sekunder untuk mendapatkan nilai pembentuk erosi yaitu erosivitas hujan (R),
Erodibilitas tanah (K), Panjang dan kemiringan lereng (LS), Pengelolaan tanaman
(C), dan Konservasi tanah (P), analisis laju erosi lahan di DAS Keduang berdasar
peta tata guna lahan, Jenis tanah dan peta kontur dengan metode Universal Soil
Loss Equation (USLE),analisis laju sedimentasi yang masuk ke sungai Keduang
dengan menghitung besarnya nisbah pengiriman sedimen atau Sediment Delivery
Ratio (SDR).DigunakanGrafik Brune (1953) untuk dapat menghitung volume
sedimen yang dapat mengendap pada masing-masing check dam, sehingga dapat
membandingkan kapasitas dari sisa tampungan check dam yang ada dengan
volume sedimen yang mengendap atau dapat tertahan di check dam.
Hasil analisis menunjukan bahwa laju erosi yang terjadi adalah 4.199.270
ton/th atau 1.947.971 m³/th.Tingkat Bahaya Erosi pada DAS Keduang adalah
5,133 mm/thn termasuk dalam kategori sedang. Indeks bahaya erosi
menggunakan Model TSL (Tolerable Soil Loss) di peroleh nilai 5,763 termasuk
dalam kategori tinggi. Sedimen yang mengendap di check dam adalah
187.221m³/th dankapasitas tampung yang tersisa dari 21 (dua puluh satu)check
dam yang berada di Sungai Keduang adalah168.196m³.Jumlah sedimen yang
tidak tertampung pada check dam sebesar 19.013m³/thdan masuk ke Waduk
Wonogiri sehingga dengan adanya check dam di sepanjang Sungai Keduang
mempunyai kontribusi yang besar untuk menahan sedimen yang terjadi. Untuk itu
perlu adanya pemeliharaan rutin dalam hal kondisi tampungan check dam dengan
alternatif penanganan antara lain: penanganan teknis dengan pengerukan
(dredging) dan penggelontoran (flushing) sedimen secara rutin yang merupakan
bentuk koreksi fisik jangka pendek yang dapat dilakukan pada check dam dan
melibatkan kerja sama dengan pihak swasta dalam hal ini para penambang pasir di
Sungai dengan memaksimalkan aktivitas masyarakat penambang sehingga dapat
mengurangi volume sedimen di check
dam.
commit
to user

vii

perpustakaan.uns.ac.id

digilib.uns.ac.id

Kata Kunci: Check Dam, Erosi, Sedimentasi.
Abdul Mahmud, 2015. Check Dam Contribution in Keduang River to Hold
Sediment transport to Wonogiri Dam. Supervisor I: Dr. Ir. Mamok Suprapto, M.
Eng. Supervisor II: Prof. Dr. Ir. Sobriyah. Thesis of Civil Engineering, Majoring on
Rehabilitation technique and Civil Building Maintenance,Postgraduate Program,
Universitas Sebelas Maret, Surakarta.

ABSTRACT
The blockage area in DAS Keduang is less than 10 percent which causes
high erosion on the area surface and this erosion flows to Wonogiri Dam. To
decrease the flow of sedimentation in Wonogiri Dam, some check dams were
built in Keduang River and there are 21 of them. However the sedimentation flow
to Wonogiri dam is still high. Thus, the study of the check dam capacity to
decrease sedimentation flow is preferable. This study is to discover the erosion
flow, sedimentation flow and sedimentation which settle at check dam.
The method used are; collecting primary and secondary data to obtain the
value of erosion formation that is rain erosivity (R), soil erodibility (K), the length
and tilt of slope (LS), crop management (C), and soil conservation (P); analyzing
erosion flow in DAS Keduang based on map of land use, type of soul and contour
map using Universal Soil Loss Equation (USLE) method; and analyzing
sedimentation flow that comes to Keduang river by calculating the height of
Sediment Delivery Ration (SDR). To measure the sedimentation volume that
settled in each check dam, Brune Graphic (1953) is used, so the comparison
between capacity of check dam residual catchment and sedimentation volume that
settled or is restrained in check dam.
The result of the analysis shows that erosion flow is 4,199,270 ton yearly
or 1,947,971 m³ yearly. The erosion danger level in DAS Keduang is 5.133 mm
yearly and it is categorized as medium. The erosion danger index using Tolerable
Soil Loss Model is 5.763 and it is categorized as high. The sedimentation which
settled in check dam is 187,221 m³ yearly and the capacity of residual catchment
of 21 check dam in Keduang River is 168,196 m³, then the sedimentation that
cannot be accommodated by check dam is 19,013 m³ yearly and it flows to
Wonogiri dam. Therefore, the existence of check dams along Keduang River give
a great contribution to block or decrease the sedimentation. Then, it is important
to have routine maintenance for check dam catchment condition by using an
alternative treatment such as; technical treatment by dredging and flusing the
sediment regularly which is categorized as physical correction of short term that
can be applied into check dam and cooperating with private business such as sand
miners because by maximizing the miners activities along the river, the volume of
sedimentation in check dam is decreased.
Keyword: check dam, erosion, sedimentation

commit to user

viii

perpustakaan.uns.ac.id

digilib.uns.ac.id

KATA PENGANTAR

Alhamdulilah segala puji dan syukur kehadirat Allah SWT penulis
panjatkan dengan berkah, kemurahan, dan pertolongannya, penulis dapat
menyelesaikan tesis ini sebagai salah satu persyaratan akademik untuk
menyelesaikan Program Pasca Sarjana pada bidang keahlian Teknik Rehabilitasi
dan Pemeliharaan Bangunan Sipil, Program Pascasarjana Universitas Sebelas
Maret Surakarta.
Secara garis besar tesis dengan judul Kontribusi Check Dam Di Sungai
Keduang dalam Menahan Sedimen Yang Masuk Ke Waduk Wonogiri, merupakan
penelitian sedimentasi pada sungai keduang yang belum tertangani dengan baik,
serta cara untuk mengurangi jumlah volume sedimen yang masuk ke Waduk
Wonogiri.
Penulis menyadari bahwa dalam penyusunan tesis ini masih jauh dari
kesempurnaan. Untuk itu penulis mengharapkan adanya saran dan kritik yang
membangun dari semua pihak.
Akhir kata semoga tesis ini dapat bermanfaat dalam memberikan
sumbangan pengetahuan bagi pembaca.

Surakarta, Mei 2015
Penulis

Abdul mahmud

commit to user

ix

perpustakaan.uns.ac.id

digilib.uns.ac.id

DAFTAR ISI
HALAMAN JUDUL

i

HALAMAN PERSETUJUAN

ii

HALAMAN PENGESAHAN

iii

PERNYATAAN ORISINALITAS

iv

UCAPAN TERIMA KASIH

v

ABSTRAK

vii

ABSTRACT

viii

KATA PENGANTAR

ix

DAFTAR ISI

x

DAFTAR TABEL

xii

DAFTAR GAMBAR

xiv

DAFTAR SIMBOL DAN SINGKATAN

xv

DAFTAR LAMPIRAN

xvi

BAB 1. PENDAHULUAN

1

1.1. Latar Belakang Masalah

1

1.2. Rumusan Masalah

2

1.3. Batasan Masalah

2

1.4. Tujuan Penelitian

2

1.5. Manfaat Penelitian

3

BAB 2.TINJAUAN PUSTAKA DAN LANDASAN TEORI

4

2.1. Tinjauan Pustaka

4

2.1.1 Laju Erosi

4

2.1.2 Laju Sedimentasi

5

2.1.3 Bangunan Pengendali Sedimen (Check Dam)

7

2.1.4 Sedimenyang Mengendap di Check Dam

9

2.1.5 Ringkasan Telaah Pustaka

9

2.2. Landasan Teori

11

2.2.1. Laju Erosi

11

2.2.2. Laju Sedimentasi

21

2.2.3. Bangunan Pengendali Sedimen (Check Dam)

23

2.2.4. Sedimen yang Mengendap di Check Dam

25

2.2.5. Alternatif penanganan sedimen yang mengendap di Check Dam

27

BAB 3. METODE PENELITIAN
3.1. Lokasi Penelitian

29

commit to user

29

x

perpustakaan.uns.ac.id

digilib.uns.ac.id

3.2. Parameter dan Variabel

30

3.3. Data

30

3.3.1. Jenis Data

30

3.3.2. Pengumpulan Data

30

3.3.3. Validasi Data

31

3.4. Laju Erosi Sub DAS Keduang

31

3.4.1 Uji Kepanggahan

32

3.4.2 Analisis Erosivitas Hujan (R)

32

3.4.3 Analisis Erodibilitas Tanah (K)

32

3.4.4 Analisis Kemiringan dan Panjang lereng (LS)

33

3.4.5 Analisis Faktor Pengelolaan Tanaman (C) dan Praktek Konservasi Tanah (P) 33
3.5. Laju Sedimen Sub DAS Keduang

33

3.6. Sedimen yang Mengendap Di Check Dam SungaiKeduang

33

3.7. Alternatif Penanganan Sedimen Yang Mengendap di Check Dam

34

3.8. Bagan Alir Penelitian

35

BAB 4.HASIL DAN PEMBAHASAN

36

4.1. Data Teknis

36

4.2. Laju Erosi Sub DAS Keduang

38

4.2.1 Data Hujan

38

4.2.2 Erosivitas Hujan (R)

40

4.2.3 Erodibilitas Tanah (K)

42

4.2.4 Kemiringan dan Panjang Lereng (LS)

46

4.2.5 Faktor Pengelolaan Tanaman (C) dan Praktek Konservasi Tanah (P)

49

4.2.6 Perhitungan Erosi Dengan MetodeUSLE

51

4.3. Laju SedimenSub DAS Keduang

56

4.4. Sedimen yang Mengendap Di Check DamSungai Keduang

60

4.4.1 Hujan Rata-rata Tahunan

60

4.4.2 Kapasitas Sisa Tampung Check Dam

65

4.4.3 Sedimen yang Mengendap Di Check Dam

67

4.4.4 Analisis Kapasitas Tampung Masing-masing Check Dam

70

4.5 Alternatif Penangan Sedimentasi Yang Mengendap Di Check Dam

77

BAB 5. KESIMPULAN DAN SARAN

99

5.1. Kesimpulan

99

5.2. Saran
DAFTAR PUSTAKA

99

commit to user

101

xi

perpustakaan.uns.ac.id

digilib.uns.ac.id

DAFTAR TABEL

Tabel 2.1.

Ringkasan Telaah Pustaka

10

Tabel 2.2.

Nilai Kritik Q dan R

15

Tabel 2.3.

Nilai Faktor C (Pengelolaan Tanaman)

17

Tabel 2.4.

Nilai Faktor P Untuk Berbagai Tindakan Konservasi Lahan

18

Tabel 2.5.

Klasifikasi Tingkat Bahaya Erosi Tanah

19

Tabel 2.6.

Pedoman Penetapan Nilai TSL untuk Tanah-tanah di Indonesia

20

Tabel 2.7.

Kelas Permeabilitas Tanah

20

Tabel 2.8.

Klasifikasi Indeks Bahaya Erosi

20

Tabel 2.9.

Faktor Pertimbangan Dalam Penggunaan Metode

26

Tabel 2.10. Analisa Satuan Pekerjaan (dalam 1 m³)

28

Tabel 3.1.

Parameter dan Variabel

30

Tabel 4.1.

Data DAS Keduang

36

Tabel 4.2.

Data Tahunan DAS Keduang (mm)

38

Tabel 4.3.

Uji Kepanggahan Data Curah Hujan

39

Tabel 4.4.

Erosivitas Bulanan Rata-rata Jatisrono DAS Keduang

40

Tabel 4.5.

Erosivitas Tahunan Rata-rata Tertimbang DAS Keduang

41

Tabel 4.6.

Jenis Tanah di DAS Keduang

42

Tabel 4.7.

Titik Pengambilan Sampel TanahDAS Keduang

43

Tabel 4.8.

Hasil Analisis Fisika Tanah

44

Tabel 4.9.

Nilai Faktor Erodibilitas Tanah DAS Keduang

45

Tabel 4.10. Nilai Faktor Erodibilitas Tanah Rata-rata Tertimbang DAS Keduang

46

Tabel 4.11. Kemiringan Lahan Dan Prosentase Luas DAS Keduang

47

Tabel 4.12. Nilai LS Rata-rata Tertimbang DAS Keduang

49

Tabel 4.13. Pengunaan Lahan DAS Keduang

50

Tabel 4.14. Nilai C dan P Pada DAS Keduang

50

Tabel 4.15. Erosi Lahan di DAS Keduang Dengan Metode USLE

52

Tabel 4.16. Jumlah Erosi Lahan Untuk Tiap Tata Guna Lahan di DAS Keduang

52

Tabel 4.17. Erosi Lahan Pada masing-masing DAS

53

Tabel 4.18. Tingkat Bahaya Erosi pada DAS Keduang

54

commit to user

xii

perpustakaan.uns.ac.id

digilib.uns.ac.id

Tabel 4.19. Hasil Prediksi Laju Erosi Tanah dan Indeks Bahaya Erosi

55

Tabel 4.20. Nilai Potensi Sedimen Pada masing-masing DAS

58

Tabel 4.21. Nilai Potensi Sedimen per Luas DAS Tiap Check Dam

59

Tabel 4.22. Sedimentasi pada DAS Keduang Pada Periode Tertentu

60

Tabel 4.23. Data Hujan Maksimum Tahunan DAS Keduang (mm)

62

Tabel 4.24. Nilai Koefisien Thiessen (Ct)

64

Tabel 4.25. Hujan Maksimum Tahunan DAS Keduang (mm)

65

Tabel 4.26. Perhitungan Volume Tampungan Check Dam Gedong

66

Tabel 4.27. Rekap Perhitungan Kapasitas Tampungan Check Dam Dalam m³

67

Tabel 4.28. Perhitungan Potensi Sedimen Dari ton/th Menjadi m³/th

68

Tabel 4.29. Perhitungan Sedimen yang Tertinggal di Check Dam

69

Tabel 4.30. Rekap Perhitungan Kapasitas Tampung Check Dam

76

Tabel 4.31. Rekap Perhitungan Penambangan Sedimen Tiap-tiap Check Dam

97

commit to user

xiii

perpustakaan.uns.ac.id

digilib.uns.ac.id

DAFTAR GAMBAR

Gambar 2.1

Rangkaian Check Dam

24

Gambar 2.2

Zona Sedimentasi (Raja Ahmed Bilal, 2012)

25

Gambar 2.3

Grafik Brune (1953)

27

Gambar 3.1. Peta Lokasi Penelitian Sub DAS Keduang

29

Gambar 3.2. Diagram Alir Penelitian

35

Gambar 4.1. Check Dam Gedong

37

Gambar 4.2. Check Dam Pingkuk

37

Gambar 4.3

Peta Erosivitas Hujan

41

Gambar 4.4

Peta Jenis Tanah di Sub DAS Keduang

42

Gambar 4.5

Peta Titik Pengambilan Sampel Tanah di DAS Keduang

44

Gambar 4.6

Hasil Overlay Peta Grid dan Peta Kontur

46

Gambar 4.7

Penomoran Peta Grid

47

Gambar 4.8

Peta Tataguna Lahan Sub DAS Keduang

51

Gambar 4.9

Lokasi Stasiun Hujan DAS Keduang

61

Gambar 4.10 Poligon Thiessen Sub DAS Keduang

63

Gambar 4.11 Grafik Brune (1953)

68

Gambar 4.12 Lokasi Penambangan Pasir di Check Dam Guno 1

82

Gambar 4.13 Lokasi Penambangan Pasir di Check Dam Pengkol

83

Gambar 4.14 Kondisi check dam Dawungan

85

Gambar 4.15 Lokasi Penambangan Pasir di Check Dam Pesido

87

Gambar 4.16 Kondisi check dam Mojopuro

88

Gambar 4.17 Akses Ke Lokasi Penambangan Pasir di Check Dam Sempukerep 89
Gambar 4.18 Lokasi Penambangan Pasir di Check Dam Sembukan

91

Gambar 4.19 Lokasi Penambangan Pasir di Check Dam Ceper

93

Gambar 4.20 Lokasi Penambangan Pasir di Check Dam Gemawang

95

commit to user

xiv

perpustakaan.uns.ac.id

digilib.uns.ac.id

DAFTAR SIMBOL DAN SINGKATAN


CP
DAYS
Dy
E
E’
EA
EI 30
K
K
L
LS
M

=
=
=
=
=
=
=
=
=
=
=
=
=
=

MAXP =
n
n’
OM
R
R’
RAIN
S
S’
SDR
Ws
Y
Y’
Yi
Z

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Luas DAS (Km²)
Faktor tanaman penutup lahan dan manajemen tanaman
Jumlah hari hujan rata-rata per tahun (hari)
Deviasi standar
Erosi total
Energi hujan (KJ/ha-mm)
Banyaknya tanah tererosi per satuan luas per satuan waktu
Interaksi energi dengan intensitas maksimum 30 menit
Faktor erosivitas hujan rata-rata tahunan
Faktor erodibilitas tanah
Erodibilitasi tanah
Panjang lereng (m)
Faktor panjang kemiringan lereng (length of slope factor)
Persentase ukuran partikel(% debu + pasir sangat halus) x (100 - %
liat)
Curah hujan maksimum rata-rata dalam 24 jam per bulan untuk kurun
waktu satu tahun (cm)
Jumlah data
Jumlah kejadian hujan dalam kurun waktu satu tahun (musim hujan)
Persen unsur organik
Permeabilitas tanah
Faktor erosivitas hujan dan aliran permukaan
Erosivitas hujan rata-rata tahunan (KJ/ha/tahun)
Curah hujan rata-rata tahunan (cm)
Kemiringan lereng actual (%)
Kode klasifikasi struktur tanah
Sediment Delivery Ratio
Luas daerah tangkapan air
Hasil sedimen per satuan luas
Data hujan rerata ,i
Data hujan ke-i
Konstanta.

commit to user

xv

perpustakaan.uns.ac.id

digilib.uns.ac.id

DAFTAR LAMPIRAN

LAMPIRAN A.1 - Dokumentasi Check Dam

LA

LAMPIRAN A.2 - Data Hujan

LA

LAMPIRAN B.1- Uji Kepangahan

LB

LAMPIRAN B.2 - Erosivitas Tahunan

LB

LAMPIRAN B.3 - Faktor Kemiringan dan Panjang Lereng (LS)

LB

LAMPIRAN B.4 - Perhitungan Laju Erosi

LB

LAMPIRAN C.1 - Perhitungan Hujan Tahunan Rata-rata

LC

LAMPIRAN C.2 - Gambar Profil Melintang dan Memanjang Check Dam

LC

commit to user

xvi