LPSE Musi Banyuasin RUP DPUCKPENG 2012

Lampiran I :

PENGUMUMA N
RENCANA UMUM PENGADAAN BARANG/JASA
KEGIATAN APBD DINAS PU CIPTA KARYA DAN PENGAIRAN KABUPATEN MUSI BANYUASIN
TAHUN ANGGARAN 2012
K/L/D/I :
TA
:

PU Cipta Kary a dan Pengairan
Tahun Anggaran 2012

NO

NAMA PAKET PEKERJAAN

1

2


CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6


WAKTU
PELAKSANAAN

KETERANGAN

9

10

3

4

5

PBJ

1 Pak et

Kec. Sek ay u


2,500,000.00

APBD

Januari 2012

Januari -Desember 2012

PBJ
PBJ

1 Pak et
1 Pak et

Kec. Sek ay u
Kec. Sek ay u

99,400,000.00
250,000,000.00


APBD
APBD

Januari 2012
Januari 2012

Januari -Desember 2012
Januari -Desember 2012

PBJ
PBJ

1 Pak et
1 Pak et

Kec. Sek ay u
Kec. Sek ay u

142,000,000.00

108,000,000.00

APBD
APBD

Januari 2012
Januari 2012

Januari -Desember 2012
Januari -Desember 2012

PBJ

1 Pak et

Kec. Sek ay u

111,800,000.00

APBD


Januari 2012

Januari -Desember 2012

PBJ
PBJ

1 Pak et
1 Pak et

Kec. Sek ay u
Kec. Sek ay u

88,640,000.00
64,800,000.00

APBD
APBD


Januari 2012
Januari 2012

Januari -Desember 2012
Januari -Desember 2012

Pembangunan Rumah Bidan Jaga dan Rumah Penjaga Kantor IBI di Sekay u

PBJ

1 Pak et

Kec. Sek ay u

332,000,000.00

APBD

Belanja A lat Tulis Kantor


PBJ

1 Pak et

10,625,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat


PBJ

1 Pak et

1,200,000.00

APBD

Lanjutan Pembangunan Mess Pegawai di Rumah Dinas Bupati Muba

PBJ

1 Pak et

235,000,000.00

APBD

Belanja A lat Tulis Kantor


PBJ

1 Pak et

10,125,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

3,000,000.00

APBD

Biaya Mak anan dan Minuman Rapat


PBJ

1 Pak et

1,200,000.00

APBD

Program Pelayanan A dministrasi Perkantoran
-

-

A
A.1
1

2

Belanja Jaminan Barang Milik Daerah
Belanja A lat Tulis Kantor
Peny ediaan Jasa kebersihan k antor
Belanja Peralatan Kebersihan dan Bahan Pembersih
Peny ediaan alat tulis k antor
Peny ediaan barang cetakan dan penggadaan
Belanja Cetak
Belanja Pengadaan
Peny ediaan k omponen instalasi listrik /penerangan bangunan k antor
Belanja A lat Listrik dan Elek tronik
Peny ediaan makanan dan minuman
Belanja Mak anan dan Minuman Rapat
Belanja Mak anan dan Minuman Tamu

Program Peningkatan Sarana dan Prasarana A paratur
Pembangunan Rumah Dinas
-

-

Kec. Sek ay u

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
1- 40

NO

NAMA PAKET PEKERJAAN

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

1

2

3

4

5

3

Pembangunan Kantor Unit Pengelola Kegiatan PNPM Mandiri Perdesaan Kec.
Sek ay u.

PBJ

1 Pak et

Kec. Sek ay u

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan

PBJ

Biaya Mak anan dan Minuman Rapat
4

5

6

7

8

9

10

-

-

-

-

-

-

-

-

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
332,000,000.00

APBD

1 Pak et

10,625,000.00

APBD

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan 1 Unit Rumah Dinas Dandim 0401 Muba Ty pe F 120

PBJ

1 Pak et

430,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

9,490,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

Pembangunan 1 Unit Rumah Dinas Kasdim 0401 Muba Ty pe F 90

PBJ

1 Pak et

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan

PBJ

Biaya Mak anan dan Minuman Rapat

Kec. Sek ay u

1,000,000.00

APBD

332,000,000.00

APBD

1 Pak et

10,625,000.00

APBD

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan 5 Unit Rumah Dinas Perwira Kodim 0401 Muba Ty pe H 70

PBJ

1 Pak et

1,460,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

16,910,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

3,100,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

Penimbunan dan Pematangan Lahan Lok asi Rumah Pintar Sek ay u

PBJ

1 Pak et

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan

PBJ

Biaya Mak anan dan Minuman Rapat

Kec. Sek ay u

Kec. Sek ay u

1,400,000.00

APBD

1,955,000,000.00

APBD

1 Pak et

18,760,000.00

APBD

1 Pak et

3,200,000.00

APBD

PBJ

1 Pak et

1,400,000.00

APBD

Penimbunan dan pembangunan k antor kanmiv ected sek ayu/ LVRI Sek ay u

PBJ

1 Pak et

430,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

9,490,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

3,600,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,000,000.00

APBD

Pembangunan Kantor Unit Pengelola Kegiatan PNPM Mandiri Perdesaan Kec. Bay ung
Lencir

PBJ

1 Pak et

332,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,345,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan Rumah Dinas Kapolsek Kec. Sanga Desa

PBJ

1 Pak et

148,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

5,145,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,700,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Kec. Sek ay u

Kec. Sek ay u

Kec. Bay ung Lencir

Kec. Sanga Desa

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
2- 40

NO

NAMA PAKET PEKERJAAN

1

2

A.2
1

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Garasi Pool Kendaraan Kecamatan Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Lanjutan Pembangunan Balai Kelurahan Serasan Jay a Kec. Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Lanjutan Pembangunan Balai Kelurahan Kay uara Kec. Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Lanjutan Pembangunan Balai Serba Guna Desa Lumpatan I Kec. Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Bailangu Kec. Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Camat Babat Toman Ke. Babat Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Sri Mulyo Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Sereka Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Sugi Waras Kec. Babat Toman

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sek ay u

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Pembangunan gedung kantor
-

2

-

3

-

4

-

5

-

6

-

7

-

8

-

9

-

138,000,000.00
7,425,000.00
2,700,000.00
1,200,000.00
128,000,000.00
7,425,000.00
2,700,000.00
1,200,000.00
100,000,000.00
7,425,000.00
2,700,000.00
1,200,000.00
1,460,000,000.00
16,910,000.00
3,100,000.00
1,400,000.00
332,000,000.00
10,625,000.00
2,500,000.00
1,200,000.00
2,355,000,000.00
16,040,000.00
3,200,000.00
1,400,000.00
317,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
317,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
317,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

7,905,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Kec. Sek ay u

Kec. Sek ay u

Kec. Sek ay u

Kec. Sek ay u

Kec. Babat Toman

Kec. Babat Toman

Kec. Babat Toman

Kec. Babat Toman

Mei 2012

Mei - Agustus 2012

Mei 2012

Mei - Agustus 2012

Mei 2012

Mei - Agustus 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
3- 40

NO

NAMA PAKET PEKERJAAN

1

2

10

-

11

-

12

-

13

-

14

-

15

-

16

-

17

-

18

-

19

-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Balai Desa Beruge Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Bangun Sari Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Camat Sungai Lilin Kel. Sungai Lilin Jay a Kec. Sungai Lilin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Suk a Damai Baru (B.5) Kec. Sungai Lilin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Bumi Kencana (C.4) Kec. Sungai Lilin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Suk a Damai Baru (B.5) Kec. Sungai Lilin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Kelurahan Sungai Lilin Kec. Sungai Lilin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Pinang Banjar Kec. Sungai Lilin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor C amat Bay ung Lencir

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Babat Toman

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Lubuk Harjo Kec. Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
2,355,000,000.00
15,432,500.00
3,200,000.00
1,400,000.00
327,000,000.00
7,872,500.00
2,500,000.00
1,200,000.00
327,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
346,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
346,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
346,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
2,355,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

14,760,000.00

APBD

PBJ

1 Pak et

3,200,000.00

APBD

PBJ

1 Pak et

1,400,000.00

APBD

PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et

357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00

APBD
APBD
APBD
APBD

Kec. Babat Toman

Kec. Sungai Lilin

Kec. Sungai Lilin

Kec. Sungai Lilin

Kec. Sungai Lilin

Kec. Sungai Lilin

Kec. Sungai Lilin

Kec. Bay ung Lencir

Kec. Bay ung Lencir

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
4- 40

NO

NAMA PAKET PEKERJAAN

1

2

20

-

21

-

22

-

23

-

24

-

25

-

26

-

27

-

28

-

29

-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Kantor Kades Muara Bahar Kec.Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kelurahan Bay ung Lincir Kec Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Pangk alan Bay at Kec. Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Tampang Baru Kec. Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Bay at Hilir Kec.Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Wonorejo Kec. Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Lanjutan Pembangunan Kantor Camat Sanga Desa

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Bay ung Lencir

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00
430,000,000.00
5,490,000.00
3,600,000.00
1,000,000.00
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00
380,000,000.00
5,490,000.00
3,600,000.00
1,000,000.00
380,000,000.00
5,490,000.00
3,600,000.00
1,000,000.00
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00
1,460,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

13,870,000.00

APBD

PBJ

1 Pak et

3,100,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

Pembangunan Kantor Kades Ulak Embacang Kec Sanga Desa
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Nganti Kec. Sanga Desa
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Kemang Kec. Sanga Desa

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Sanga Desa

1,400,000.00

APBD

336,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
355,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
355,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

7,585,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Kec. Sanga Desa

Kec. Sanga Desa

Kec. Sanga Desa

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
5- 40

NO

NAMA PAKET PEKERJAAN

1

2

30

-

31

-

32

-

33

-

34

-

35

-

36

-

37

38

-

-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Balai Desa Air Itam Kec. Sanga Desa
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Tanjung Ray a Kec. Sanga Desa

PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sanga Desa

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
355,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
355,000,000.00

APBD
APBD
APBD
APBD
APBD

1 Pak et

7,585,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Penimbunan Balai Desa Ngulak II Kec. Sanga Desa
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Bangk it Jay a Kec. Sei Keruh

PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

90,000,000.00
4,290,000.00
1,400,000.00
1,000,000.00
312,000,000.00

APBD
APBD
APBD
APBD
APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,905,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

Pembangunan Kantor Kades Ulak Kembang Kec. Batang Hari Leko
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Buk it Sejahtera (SP.3) Kec. Batang Hari Leko
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Buk it Pangk uasan (SP.4) Kec. Batang Hari Leko

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Paket
1 Pak et
1 Pak et
1 Pak et
1 Paket
1 Pak et
1 Pak et
1 Pak et
1 Paket

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

Kec. Sanga Desa

Kec. Sanga Desa

Kec. Sungai Keruh

1,200,000.00

APBD

320,000,000.00
7,873,000.00
2,500,000.00
1,200,000.00
342,000,000.00
7,873,000.00
2,500,000.00
1,200,000.00
342,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

7,873,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan Balai Desa Talang Leban Kec. Batang Hari Leko

PBJ

1 Paket

342,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,873,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan Balai Desa Buk it Selabu (SP.2) Kec. Batang Hari Leko
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PBJ
PBJ
PBJ
PBJ

1 Paket
1 Pak et
1 Pak et
1 Pak et

342,000,000.00
7,873,000.00
2,500,000.00
1,200,000.00

APBD
APBD
APBD
APBD

Kec. Batang Hari Leko

Kec. Batang Hari Leko

Kec. Batang Hari Leko

Kec. Batang Hari Leko

Kec. Batang Hari Leko

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Agustus 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
6- 40

NO

NAMA PAKET PEKERJAAN

1
39

40

2
-

-

41

-

42

-

43

-

44

-

45

-

46

-

47

-

48

-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Balai Desa Saut Kec. Batang Hari Leko

PBJ

1 Paket

Kec. Batang Hari Leko

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
342,000,000.00

APBD

1 Pak et

7,873,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan Balai Desa Pinggap Kec. Batang Hari Leko

PBJ

1 Paket

342,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,873,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan Kantor Kades Desa Tanjung A gung Selatan Kec. Lais
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Tanjung A gung Timur Kec. Lais
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Tanjung Agung Barat Kec. Lais
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Desa Sri Damai Kec. Keluang
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Sri Damai Kec. Keluang
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Tanjung Keputren Kec. Plak at Tinggi
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Sumber Rezek i Kec. Plak at Tinggi
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Bangun Harja (SP.6) Kec. Plakat Tinggi
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

317,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00
337,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00
337,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00
318,000,000.00
8,001,000.00
2,500,000.00
1,200,000.00
357,000,000.00
8,001,000.00
2,500,000.00
1,200,000.00
322,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
322,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
343,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

Kec. Batang Hari Leko

Kec. Lais

Kec. Lais

Kec. Lais

Kec. Keluang

Kec. Keluang

Kec. Plak at Tinggi

Kec. Plak at Tinggi

Kec. Plak at Tinggi

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
7- 40

NO

NAMA PAKET PEKERJAAN

1

2

49

-

50

-

51

-

52

-

53

-

54

-

55

-

56

-

57

-

58

-

Pembangunan Balai Desa Warga Mulya (B.4) Kec. Plakat Tinggi
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Air Putih ilir (C4) Kec. Plak at Tinggi
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Lanjutan Pembangunan Balai Desa Cinta Kary a (C.3) Kec. Plakat Tinggi
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Agung Jay a Kec. Lalan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Karang Agung Kec.Lalan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Suk a Mak mur Kec.Lalan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Camat Tungk al Jay a Kec. Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Sumber Harum Kec.Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Pandan Sari Kec. Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Sri Muly o Kec.Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Plak at Tinggi

Kec. Plak at Tinggi

Kec. Plak at Tinggi

Kec. Lalan

Kec. Lalan

Kec. Lalan

Kec. Tungk al Jay a

Kec. Tungk al Jay a

Kec. Tungk al Jay a

Kec. Tungk al Jay a

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
343,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
343,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
343,000,000.00
7,585,000.00
2,500,000.00
1,200,000.00
357,000,000.00
5,185,000.00
2,500,000.00
1,200,000.00
395,000,000.00
5,320,000.00
2,600,000.00
1,000,000.00
395,000,000.00
5,320,000.00
2,600,000.00
1,000,000.00
2,355,000,000.00
14,760,000.00
3,200,000.00
1,400,000.00
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
8- 40

NO

NAMA PAKET PEKERJAAN

1

2

59

-

60

-

61

-

62

-

63

-

64

-

65

-

66

-

67

-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Kantor Kades Sido Muly o Kec. Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Sinar Tungk al Kec. Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Peninggalan Kec.Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Suk a Damai Kec.Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Berlian Jay a Kec. Tungk al Jay a

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Tungk al Jay a

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00
357,000,000.00
6,625,000.00
2,500,000.00
1,200,000.00
380,000,000.00
5,490,000.00
3,600,000.00
1,000,000.00
380,000,000.00
5,490,000.00
3,600,000.00
1,000,000.00
380,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

5,490,000.00

APBD

PBJ

1 Pak et

3,600,000.00

APBD

PBJ

1 Pak et

1,000,000.00

APBD

Pembangunan Balai Desa Sumber Sari Kec. Tungk al Jaya

PBJ

1 Pak et

380,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

5,490,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

3,600,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,000,000.00

APBD

Pembangunan Balai Desa Beji Mulyo Kec. Tungk al Jay a
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Camat Lawang Wetan di Desa Ulak Paceh Jay a Kec. Lawang
Wetan
Belanja A lat Tulis Kantor

PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Tungk al Jay a

380,000,000.00
5,490,000.00
3,600,000.00
1,000,000.00

PBJ

1 Pak et

Kec. Lawang Wetan

PBJ

Belanja Penggandaan

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

APBD
APBD
APBD
APBD

Mei 2012

Mei - September 2012

2,555,000,000.00

APBD

Mei 2012

Mei - Nov ember 2012

1 Pak et

16,040,000.00

APBD

PBJ

1 Pak et

3,200,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,400,000.00

APBD

Pembangunan Kantor Kades Simpang Sari Kec.Lawan Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et

317,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00

APBD
APBD
APBD
APBD

Mei 2012

Mei - September 2012

Kec. Tungk al Jay a

Kec. Tungk al Jay a

Kec. Tungk al Jay a

Kec. Tungk al Jay a

Kec. Tungk al Jay a

Kec. Lawang Wetan

RUP DPU CK-Peng KAB.MUBA TA 2012
9- 40

NO

NAMA PAKET PEKERJAAN

1
68

2
-

69

-

70

-

71

-

72

-

73

-

74

-

75

-

76

-

77

-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Balai Desa Ulak Paceh Kec.Lawan Wetan

PBJ

1 Pak et

Kec. Lawang Wetan

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Napal Kec. Lawang Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Rantau Kasih Kec. Lawang Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Karang Ringin I Kec. Lawang Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Karang Ringin II Kec.Lawan Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Ulak Teberau Kec. Lawang Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Bumiay u Kec. Lawan Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Karang Waru Kec. Lawan Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Pandan Dulang Kec. Lawang Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Camat Babat Supat Desa Babat Bany uasin Kec. Babat Supat
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
336,000,000.00

APBD

1 Pak et

7,905,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
336,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00
2,355,000,000.00
16,120,000.00
3,200,000.00
1,400,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

Kec. Lawang Wetan

Kec. Lawang Wetan

Kec. Lawang Wetan

Kec. Lawang Wetan

Kec. Lawang Wetan

Kec. Lawang Wetan

Kec. Lawang Wetan

Kec. Lawang Wetan

Kec. Babat Supat

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - Nov ember 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
10- 40

NO

NAMA PAKET PEKERJAAN

1

2

78

-

79

-

80

-

81

-

82

83

A.2
1

2

3

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Pembangunan Kantor Kades Supat Timur Kec.Babat Supat
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Kantor Kades Seratus Lapan Kec. Babat Supat
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Letang Kec. Babat Supat
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Balai Desa Babat Bany uasin Kec. Babat Supat

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Babat Supat

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
317,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00
317,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00
356,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00
356,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

7,985,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Pembangunan Gedung Satlantas Polres Muba Tahap I
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Mushola Kantor Camat Lais Kec. Lais
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pengadaan perlengk apan gedung k antor
Pengadaan peralatan gedung k antor
Pengadaan Mebeleur

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sek ay u

670,000,000.00
19,460,000.00
3,000,000.00
1,200,000.00
180,000,000.00
4,785,000.00
2,700,000.00
1,200,000.00
129,000,000.00
342,500,000.00
396,000,000.00

Rehabilitasi Sedang/Berat Rumah Dinas
Rehab Total Guest House Rumah Dinas Bupati Musi Bany uasin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab dan Peningk atan Pendopoan Rumah Dinas Bupati Musi Bany uasin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Rumah Dinas Kabag Kesra Kab. Musi Bany uasin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sek ay u

2,955,000,000.00
18,760,000.00
3,200,000.00
1,400,000.00
1,955,000,000.00
18,760,000.00
3,200,000.00
1,400,000.00
285,000,000.00
10,125,000.00
3,000,000.00
1,200,000.00

-

Kec. Babat Supat

Kec. Babat Supat

Kec. Babat Supat

Kec. Lais

Kec. Sek ay u
Kec. Sek ay u
Kec. Sek ay u

Kec. Sek ay u

Kec. Sek ay u

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

Mei 2012

Mei - Ok tober 2012

Mei 2012

Mei - September 2012

Mei 2012
Mei 2012
Mei 2012

Mei - September 2012
Mei - September 2012
Mei - September 2012

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
11- 40

NO

NAMA PAKET PEKERJAAN

1

2

A.3
1

2

3

4

5

6

-

8

-

9

-

LOKASI
PEKERJAAN

3

4

5

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sek ay u

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan

Rehabilitasi sedang/berat gedung kantor
Rehab dan Peningk atan Perluasan Mess Karyawan Rumah Dinas Bupati Musi
Bany uasin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Berat Gedung dan Pagar Gedung Veteran RI (Kantor KPU MUBA)
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Dinas Kesehatan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Kantor Koramil 0401-04 Sek ay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Kantor Koramil 0401-03 Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Berat Kantor Pramuk a Kec. Sekay u

7

CARA
VOLUME
PENGADAAN

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6

1,955,000,000.00
18,760,000.00
3,200,000.00
1,400,000.00
1,060,000,000.00
16,910,000.00
3,100,000.00
1,400,000.00
10,925,000,000.00
36,410,000.00
6,300,000.00
2,000,000.00
430,000,000.00
9,490,000.00
3,600,000.00
1,000,000.00
285,000,000.00
7,405,000.00
3,000,000.00
1,200,000.00
138,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

7,425,000.00

APBD

PBJ

1 Pak et

2,700,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

Renov asi Ruang Kepala Dinas BKD Kab. Musi Bany uasin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Renov asi Ruang Kerja Petro Muba Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembuatan Ruang Arsip dan Toilet di Kantor Dinas PU Cipta Kary a dan Pengairan
Kab. Musi Bany uasin
Belanja A lat Tulis Kantor

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sek ay u

PBJ

1 Pak et

Kec. Sek ay u

PBJ

Belanja Penggandaan

PBJ

Biaya Mak anan dan Minuman Rapat

PBJ

Kec. Sek ay u

Kec. Sek ay u

Kec. Sek ay u

Kec. Babat Toman

Kec. Sek ay u

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - Nov ember 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

1,200,000.00

APBD

138,000,000.00
7,425,000.00
2,700,000.00
1,200,000.00
100,000,000.00
7,425,000.00
2,700,000.00
1,200,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

Mei 2012

Mei - Agustus 2011

Mei 2012

Mei - Agustus 2011

475,000,000.00

APBD

Mei 2012

Mei - September 2012

1 Pak et

14,235,000.00

APBD

1 Pak et

3,300,000.00

APBD

1 Pak et

1,260,000.00

APBD

Kec. Sek ay u

RUP DPU CK-Peng KAB.MUBA TA 2012
12- 40

NO

NAMA PAKET PEKERJAAN

1

2

10

-

11

-

12

-

13

-

14

-

15

-

16

-

17

-

18

-

19

-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Rehab Berat Kantor Lurah Soak Baru Kec.Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Panca Tunggal (C.5) Kec. Sungai Lilin
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Muara Merang Kec. Bayung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Mangsang Kec. Bay ung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Kaliberau Kec. Bayung Lencir
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Telang Kec.Bay ung Lencir

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sek ay u

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6
188,000,000.00
7,425,000.00
2,700,000.00
1,200,000.00
285,000,000.00
7,485,000.00
3,000,000.00
1,200,000.00
357,000,000.00
7,665,000.00
2,500,000.00
1,200,000.00
357,000,000.00
7,665,000.00
2,500,000.00
1,200,000.00
357,000,000.00
7,665,000.00
2,500,000.00
1,200,000.00
357,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

1 Pak et

7,665,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Rehab Total Kantor Kades Muara Medak Kec. Bayung Lencir

PBJ

1 Pak et

357,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,665,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Rehab Total Kantor Kades Ngulak III Kec. Sanga Desa
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Air Itam Kec. Sanga Desa

PBJ
PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

336,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00
336,000,000.00

APBD
APBD
APBD
APBD
APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,985,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Rehab Total Rumah Dinas Lurah Kelurahan Ngulak I Kecamatan Sanga Desa
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et

332,000,000.00
7,985,000.00
2,500,000.00
1,200,000.00

APBD
APBD
APBD
APBD

Kec. Sungai Lilin

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Bay ung Lencir

Kec. Sanga Desa

Kec. Sanga Desa

Kec. Sanga Desa

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

RUP DPU CK-Peng KAB.MUBA TA 2012
13- 40

NO

NAMA PAKET PEKERJAAN

1
20

2
-

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Rehab Total Kantor Kades Supat Induk Kec. Babat Supat

PBJ

1 Pak et

Kec. Babat Supat

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

Mei 2012

Mei - September 2012

APBD
APBD
APBD
APBD

Mei 2012

Mei - September 2012

188,000,000.00

APBD

Mei 2012

Mei - September 2012

1 Pak et

7,425,000.00

APBD

PBJ

1 Pak et

2,700,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Pengadaan pak aian dinas beserta perlengk apanny a

PBJ

1 Pak et

Kec. Sek ay u

85,000,000.00

APBD

Mei 2012

Mei - September 2012

Pengadaan pak aian k husus hari-hari tertentu

PBJ

1 Pak et

Kec. Sek ay u

100,000,000.00

APBD

Mei 2012

Mei - September 2012

-

23

-

24

-

25

-

26

-

27

-

7,675,000.00

APBD

PBJ

1 Pak et

2,500,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD

Rehab Total Kantor Kades Pinggap Kec. Batang Hari Leko
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Tenggaro Kec. Keluang
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Balai Desa Mekarsari (SP.6) Kec. Keluang
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Rumah Dinas Camat Keluang Kec. Keluang
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Rehab Total Kantor Kades Air Putih Ulu (C.1) Kec. Plakat Tinggi

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

1 Paket
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et
1 Pak et

320,000,000.00
7,873,000.00
2,500,000.00
1,200,000.00
337,000,000.00
7,693,000.00
2,500,000.00
1,200,000.00
337,000,000.00
7,693,000.00
2,500,000.00
1,200,000.00
282,000,000.00
7,693,000.00
2,500,000.00
1,200,000.00
322,000,000.00

APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD
APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,985,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,500,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Rehab Total Kantor Kades Karang Any ar Kec. Lawang Wetan
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Lawang Wetan

317,000,000.00
7,905,000.00
2,500,000.00
1,200,000.00

Renov asi Bangunan UPTD Panti Asuhan Amal Bak ti Sek ay u Ex. Kantor Dinas Sosial
Kab. Muba

PBJ

1 Pak et

Kec. Sek ay u

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

10

Mei 2012

22

1 Pak et

9
Mei - September 2012

-

APBD

KETERANGAN

Mei 2012

21

317,000,000.00

WAKTU
PELAKSANAAN

Kec. Batang Hari Leko

Kec. Keluang

Kec. Keluang

Kec. Keluang

Kec. Plak at Tinggi

Program Peningk atan Disiplin A paratur

RUP DPU CK-Peng KAB.MUBA TA 2012
14- 40

NO

NAMA PAKET PEKERJAAN

1

2

CARA
VOLUME
PENGADAAN

LOKASI
PEKERJAAN

3

4

5

Belanja A lat Tulis k antor

PBJ

1 Pak et

Kec. Sek ay u

Belanja Bahan

PBJ

1 Pak et

Belanja Pengadaan

PBJ

1 Pak et

Belanja Mak anan dan Minuman

PBJ

Belanja Pak aian Kerja

PERKIRAAN
WAKTU
SUMBER DANA
MULAI
APBN/ APBD PELAKSANAAN
7
8

RENCANA PENGANGGARAN
PERKIRAAN
(Rp)
6

WAKTU
PELAKSANAAN

KETERANGAN

9

10

Program Peningkatan Kapasitas Sumber Daya A paratur
Bimbingan Tek nis e-Procurement / Pengadaan Barang Jasa
29,970,000.00

APBD

Mei 2012

Mei - September 2012

Kec. Sek ay u

1,500,000.00

APBD

Mei 2012

Mei - September 2012

Kec. Sek ay u

18,000,000.00

APBD

Mei 2012

Mei - September 2012

1 Pak et

Kec. Sek ay u

15,000,000.00

APBD

Mei 2012

Mei - September 2012

PBJ

1 Pak et

Kec. Sek ay u

8,750,000.00

APBD

Mei 2012

Mei - September 2012

Belanja A lat Tulis k antor

PBJ

1 Pak et

Kec. Sek ay u

13,630,000.00

APBD

Januari 2012

Januari -Desember 2012

Belanja Pengadaan

PBJ

1 Pak et

Kec. Sek ay u

7,425,000.00

APBD

Januari 2012

Januari -Desember 2012

Belanja Mak anan dan Minuman

PBJ

1 Pak et

Kec. Sek ay u

86,400,000.00

APBD

Januari 2012

Januari -Desember 2012

PBJ
PBJ

1 Pak et
1 Pak et

Kec. Sek ay u
Kec. Sek ay u

10,350,000.00
4,250,000.00

APBD
APBD

Mei 2012
Mei 2012

Mei - Nov ember 2012
Mei - Nov ember 2012

Belanja Mak anan dan Minuman

PBJ

1 Pak et

Kec. Sek ay u

1,800,000.00

APBD

Mei 2012

Mei - Nov ember 2012

Belanja Pengadaan Komputer

PBJ

1 Pak et

Kec. Sek ay u

40,000,000.00

APBD

Mei 2012

Mei - Nov ember 2012

Pembuatan Saluran Drainage di RT.06 RW.03 k e Jl. Kol. W ahid Udin Kel. Serasan
Jay a Kec. Sek ay u

PBJ

1 Pak et

Kec. Sek ay u

188,000,000.00

APBD

Belanja A lat Tulis Kantor

PBJ

1 Pak et

7,425,000.00

APBD

Belanja Penggandaan

PBJ

1 Pak et

2,700,000.00

APBD

Biaya Mak anan dan Minuman Rapat

PBJ

1 Pak et

1,200,000.00

APBD

Pembuatan Parit Komplek Perumahan Griya Balai Agung Sejahtera Kec. Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Lanjutan Pembuatan Saluran Drainase di RT.24 RW .01 Griya Serasan Damai Kel.
Kay uara Kec. Sekay u

PBJ
PBJ
PBJ
PBJ

1 Pak et
1 Pak et
1 Pak et
1 Pak et

Kec. Sek ay u

100,000,000.00
7,425,000.00
2,700,000.00
1,200,000.00

PBJ

1 Pak et

Kec. Sek ay u

Belanja A lat Tulis Kantor

PBJ

Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat

Program Peningkatan Pengembangan Sistem Pelaporan Capaian Kinerja dan
Keuangan
Peny usunan laporan capaian k inerja dan ikhtisar realisasi kinerja SKPD

Program Pengembangan Perumahan
Dana Operasional Pengembangan Pembangunan Rumah Bagi Masy arak at Berpenghasilan
Rendah (MBR)
Belanja A lat Tulis k antor
Belanja Pengadaan

B
B.1
1

Program Pembangunan Drainase / Gorong-Gorong
Pembangunan saluran drainase/gorong-gorong
-

2

-

3

-

Mei 2012

Mei - Agustus 2012

APBD
APBD
APBD
APBD

Mei 2012

Mei - Agustus 2012

138,000,000.00

APBD

Mei 2012

Mei - Agustus 2012

1 Pak et

7,425,000.00

APBD

PBJ

1 Pak et

2,700,000.00

APBD

PBJ

1 Pak et

1,200,000.00

APBD
RUP DPU CK-Peng KAB.MUBA TA 2012
15- 40

NO

NAMA PAKET PEKERJAAN

1

2

4

-

5

-

6

-

7

-

8

-

9

-

10

-

11

-

12

-

13

-

Pembuatan Parit Lingk ungan di RT.04 RW.02 Lk .I Kel. Balai Agung Kec. Sekayu
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembuatan Parit di Dusun I Desa Muara Teladan Kec. Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembuatan Parit di Dusun II Desa Muara Teladan Kec. Sekay u
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Parit di Dusun I, II, III Desa Bangun Sari Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Parit di Kelurahan Babat Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
Biaya Mak anan dan Minuman Rapat
Pembangunan Parit dalam Desa Toman Kec. Babat Toman
Belanja A lat Tulis Kantor
Belanja Penggandaan
B