S TS 1103800 Bibliography
DAFTAR PUSTAKA
Al-Najjar, B., & Taylor, P. (2008). The Relationship between Capital Structure and
Ownership Structure: New Evidence from Jordanian Panel Data. Managerial
Finance Journal
Ardani, 2009. Analisa Penerapan Manajemen Waktu Pada Proyek Konstruksi Jalan,
Universitas Sumatera Utara, Medan
Assaf, Sadi. A, et-al. 2005. Cause of Delay in Large Construction Project, International
Journal of Project Management 24
Bordat, C. McCullouch, B.G., Labi, S., & Sinha, K.C. 2004. An Analysis of Cost
Overruns and Time Delays of INDOT Project. Final Report FHWA/IN/JTRP2004/7
Ekajaya, Lila, 2007. Evaluasi Sistem Pengendalian Biaya Proyek pada Perusahaan Jasa
Konstruksi Berskala Besar di Surabaya, Tesis Universitas Kristen Petra, Surabaya
Ervianto, Wulfram, I, 2005. Manajemen Proyek Konstruksi (Edisi Revisi), Edisi III, Andi,
Yogyakarta
Gunawan, 2015, Contoh Kontrak Kerja. (online), (detiklife.com, diakses 30 Desember
2015)
Henderson, K, 2007. A Breakthrough Extension to Earned Value Management, Skripsi,
Sydney
Husen, Abrar, 2009. Manajemen Proyek: Perencanaan, Penjadwalan & Pengendalian
Proyek, Penerbit Andi, Yogyakarta
Kim, Byung-Cheol, and Kenneth F. Reinschmidt, 2011.Combination of Project Cost
Forecastsin Earned Value Management, Journal of Construction Engineering and
Management, ASCE
Kusjadmikahadi, R. Amperawan, 1999. “Studi Keterlambatan Kontraktor Dalam
Melaksanakan Proyek Konstruksi di Daerah Istimewa Yogyakarta”. Yogyakarta
62
Hana Rizkia Armis, 2016
ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN
METODE NILAI HASIL
Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu
63
Le-Hoai.Long, Lee.Young Dai, Lee.Jun Yong. 2008. “Delay an Cost Overruns in Vietnam
Large Consttruction Projects : A Comparison with Other Selected Countries”,
Korean Society of Civil Engineering, Journal of Civil Engineering, Construction
Management
Lukas, Mr.Joseph A, 2008. Earned Value Analysis-Why it Doesn’t Work, AACE
International Transactions
Luu, Van Truong, Nguyen Van Tuan, Stephen O.Ogunlana, 2009. Quantifying Schedule
Risk in Construction Projects using Bayesian Belief Networks, International Journal
of Project Management
Majid. I.A., 2006, Causes And Effect Of Delays In Construction Project, Jurnal Teknik
Sipil, Universitas Syiah Kuala, Banda Aceh
PM Book, 2011. Earned Value Management: Advantages and Disadvantages
Riantini, L.S., Trigunarsyah, B., Abidin, I., dan Latief, Y., 2005. Penentuan Peringkat
Faktor Risiko dalam Rekrutmen Tenaga Kerja yang Mempengaruhi Biaya Tenaga
Kerja pada Proyek, Jurnal Teknik Sipil Vol. 12 No 3, Institut Teknologi Bandung,
Bandung
Soeharto, Iman, 1999. Manajemen Proyek (Dari Konseptual Sampai Operasional), Jilid
I, Edisi Kedua, Erlangga, Jakarta
Soemardi, B. W., Abduh, M., Wirahadikusumah, R. D., dan Pujoartanto, N., 2006. Konsep
Earned Value untuk Pengelolaan Proyek Konstruksi, Institut Teknologi Bandung,
Bandung
Wijaya, P., Leman, S., Proboyo, B., dan Santoso, I., 2015. Keterkaitan Kuantitas
Pekerjaan Dengan Durasi dan Tenaga Kerja Pada Proyek Konstruksi Bangunan
Bertingkat Tinggi, Jurnal Dimensi Pratama Teknik Sipil Vol 4 No 1, Universitas
Kristen Petra, Jakarta
Hana Rizkia Armis, 2016
ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN
METODE NILAI HASIL
Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu
Al-Najjar, B., & Taylor, P. (2008). The Relationship between Capital Structure and
Ownership Structure: New Evidence from Jordanian Panel Data. Managerial
Finance Journal
Ardani, 2009. Analisa Penerapan Manajemen Waktu Pada Proyek Konstruksi Jalan,
Universitas Sumatera Utara, Medan
Assaf, Sadi. A, et-al. 2005. Cause of Delay in Large Construction Project, International
Journal of Project Management 24
Bordat, C. McCullouch, B.G., Labi, S., & Sinha, K.C. 2004. An Analysis of Cost
Overruns and Time Delays of INDOT Project. Final Report FHWA/IN/JTRP2004/7
Ekajaya, Lila, 2007. Evaluasi Sistem Pengendalian Biaya Proyek pada Perusahaan Jasa
Konstruksi Berskala Besar di Surabaya, Tesis Universitas Kristen Petra, Surabaya
Ervianto, Wulfram, I, 2005. Manajemen Proyek Konstruksi (Edisi Revisi), Edisi III, Andi,
Yogyakarta
Gunawan, 2015, Contoh Kontrak Kerja. (online), (detiklife.com, diakses 30 Desember
2015)
Henderson, K, 2007. A Breakthrough Extension to Earned Value Management, Skripsi,
Sydney
Husen, Abrar, 2009. Manajemen Proyek: Perencanaan, Penjadwalan & Pengendalian
Proyek, Penerbit Andi, Yogyakarta
Kim, Byung-Cheol, and Kenneth F. Reinschmidt, 2011.Combination of Project Cost
Forecastsin Earned Value Management, Journal of Construction Engineering and
Management, ASCE
Kusjadmikahadi, R. Amperawan, 1999. “Studi Keterlambatan Kontraktor Dalam
Melaksanakan Proyek Konstruksi di Daerah Istimewa Yogyakarta”. Yogyakarta
62
Hana Rizkia Armis, 2016
ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN
METODE NILAI HASIL
Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu
63
Le-Hoai.Long, Lee.Young Dai, Lee.Jun Yong. 2008. “Delay an Cost Overruns in Vietnam
Large Consttruction Projects : A Comparison with Other Selected Countries”,
Korean Society of Civil Engineering, Journal of Civil Engineering, Construction
Management
Lukas, Mr.Joseph A, 2008. Earned Value Analysis-Why it Doesn’t Work, AACE
International Transactions
Luu, Van Truong, Nguyen Van Tuan, Stephen O.Ogunlana, 2009. Quantifying Schedule
Risk in Construction Projects using Bayesian Belief Networks, International Journal
of Project Management
Majid. I.A., 2006, Causes And Effect Of Delays In Construction Project, Jurnal Teknik
Sipil, Universitas Syiah Kuala, Banda Aceh
PM Book, 2011. Earned Value Management: Advantages and Disadvantages
Riantini, L.S., Trigunarsyah, B., Abidin, I., dan Latief, Y., 2005. Penentuan Peringkat
Faktor Risiko dalam Rekrutmen Tenaga Kerja yang Mempengaruhi Biaya Tenaga
Kerja pada Proyek, Jurnal Teknik Sipil Vol. 12 No 3, Institut Teknologi Bandung,
Bandung
Soeharto, Iman, 1999. Manajemen Proyek (Dari Konseptual Sampai Operasional), Jilid
I, Edisi Kedua, Erlangga, Jakarta
Soemardi, B. W., Abduh, M., Wirahadikusumah, R. D., dan Pujoartanto, N., 2006. Konsep
Earned Value untuk Pengelolaan Proyek Konstruksi, Institut Teknologi Bandung,
Bandung
Wijaya, P., Leman, S., Proboyo, B., dan Santoso, I., 2015. Keterkaitan Kuantitas
Pekerjaan Dengan Durasi dan Tenaga Kerja Pada Proyek Konstruksi Bangunan
Bertingkat Tinggi, Jurnal Dimensi Pratama Teknik Sipil Vol 4 No 1, Universitas
Kristen Petra, Jakarta
Hana Rizkia Armis, 2016
ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN
METODE NILAI HASIL
Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu