10. Lanjutan Pembangunan Gedung GOR Kecamatan Ciputat Timur.zip BQ

KEGI ATAN PEMBANGUNAN GEDUNG KANTOR
DAFTAR KUANTI TAS DAN HARGA
PEKERJAAN : LANJUTAN PEMBANGUNAN GOR KECAMATAN CI PUTAT TI MUR
NO.
I
1
2
3
4
5
6
7
8
9
10
11
12

URAI AN PEKERJAAN

PEKERJAAN GALI AN DAN PONDASI


1
2
3
4

Galian tanah pondasi bt kali
Pasir urug bawah pondasi batu kali t = 5 cm
Pondasi Batu Kali : 1PC : 4 Psr
Urugan tanah kembali pondasi bt kali

1
2
3
4

IV
1
2
3

4
5
6

PEKERJAAN PENGECATAN
Pengecatan dinding (setara Jotun)
Pengecatan list plafond
Pengecatan plafond setara Metrolite (3x)

VI I
1
2
3
4
5
6
7
8

1.00

1.00
1.00
1.00
24.00
98.00
38.00
1.00
1.00
1.00
1.00
1.00

bh
ls
ls
set
m2
m1
m1
ls

ls
ls
ls
ls

I I I .003
VI .001
VI I .013
I I I .013

48.83
6.51
29.29
13.03

m3
m3
m3
m3


XI X.164
XI X.170
XI X.171
XI X.167

0.66
3.78
6.91
0.93

m3
m3
m3
m3

VI I I .005
X.012
X.010
VI .001
XI X.004

XI .022

453.10
895.40
10.80
15.08
15.08
311.50

m2
m2
m2
m3
m3
m2

XVI I I .014
XVI I I .034

906.20

216.00
439.80

m2
m1
m2

XI I .027
XI I .021

439.80
216.00

m2
m1

3.00
2.00
2.00
4.00

30.00
39.00
36.00
3.00

unit
unit
unit
unit
unit
unit
unit
unit

I .005
I .016
I .012

PEKERJAAN PASANGAN
Dinding Bata 1:5

Plesteran dan acian 1 : 5
Plesteran dan acian 1 : 3
Pasir urug bawah lantai 5 cm
Lantai kerja 5 cm ( dlm ruang dan teras luar)
Lantai keramik 40x40 cm, setara Masterina KW 1

1
2
3

1
2

I .002
I .020

PEKERJAAN BETON
Sloof beton 15/ 20 readymix k-225
Kolom praktis 15x15
Pelat/ List Plank Beton t = 10 cm

Ring Balk 15/ 20 readymix k-225

V

VI

VOLUME

PEKERJAAN PERSI APAN
Papan nama proyek
Pembersihan Lokasi
Mobilisasi dan Demobilisasi
Direksi Keet
Pembuatan Gudang Bahan
Pagar Proyek
Pas. Bouwplank
I zin mendirikan bangunan
Penyambungan daya PLN 10.000 watt
Foto, Dokumentasi, Administrasi & Pelaporan
As-Built Drawing

Air dan listrik kerja

II

III

ANALI SA

PEKERJAAN PLAFOND
Plafond GRC t= 4 mm+ rangka rangka besi hollow 20x40
List Plafond

PEKERJAAN PI NTU DAN JENDELA
Pintu 2 (double) Alumunium + kusen (P1)
Pintu Alumunium + kusen (P2)
Pintu Kamar Mandi PVC (P3)
Bouvenlight Alumunium (BV)
Kusen + jendela alumunium (J1)
Kusen + jendela alumunium (J2)
Roster Kayu Kamper Finishing Politur (R1)
Roster Kayu Kamper Fionishing Politur(R2)

HARGA SATUAN
Rp.

JUMLAH
Rp.

( 2 )

NO.
VI I I
1
2
3
4
5
6
7
8
9

IX
1
2
3
4

URAI AN PEKERJAAN

PEKERJAAN ATAP
Pek. Konstruksi Baja I / WF DN/ SI I 150.75.5.7

1
2
3
4
5
6
7
8

XI I
1
2
3
4
5
6
7
8

XVI I .007
XVI I .002
XVI I .025
XVI I .023
XI .007
XI .017
XVI I .029
XVI I .021
XVI I .016

2.00
2.00
2.00
4.00
9.00
15.00
1.00
55.00
24.00

unit
unit
bh
bh
m2
m2
unit
m'
m'

XXVI I .001

20.00
20.00
6.00
1.00

ttk
unit
ttk
unit

542.00
1,899.98
2,441.98
306.00
153.00
1,210.00
233.75
58.20
233.75
233.75
95.50

kg
kg
kg
bh
ttk
cm
m2
m1
m2
m2
m1

8.10
90.00
4.00
10.60
1.00
1.00
1.00
1.00

m3
m'
bh
m3
set
ttk
ls
ls

25.00
100.14
250.00
0.60
12.25
70.00
248.52
6.75

m2
m3
m2
m3
m3
m1
m2
m2

I NSTALASI LI STRI K
I nstalasi titik lampu
Lampu Down light
I nstalasi titik stop kontak
Box MCB 10 Ampere

1
2

XI

VOLUME

PEKERJAAN KAMAR DAN SANI TAI R,SI GNAGE
Bak mandi fibre glass
Closet jongkok lengkap jet washer ex toto
Floor drain
Kran air
Keramik lantai 20x20 KW1
keramik dinding 20x20 KW1
Septictank + rembesan
Piva PVC 3"
Piva PVC 1/ 2"

X

3
4
5
6
7
8
9
10

ANALI SA

Pek. Gording C 125.65.6.8
Pas. Baud Dia 16
Melobangi Konstruksi Besi Dengan Bor
Pengelasan Dengan Las Listrik + Kawat 4 mm
Pek. Kaso Reng Baja Ringan
Nok Genteng Metal
Alumunium foil
Atap metal multiroof
Listplank Calsiboard

XXVI I .003

XX.003
XX.004
XX.010
XX.006
XX.005

PEKERJAAN LAI N-LAI N
Galian tanah untuk saluran
Pasang buis beton u 20
Bak kontrol + tutup : 60 x 60
Rabat Beton
Tanki air 1000 ltr + instalasi + tower
Bor sumur dengan Cashing dan Pompa
I nstalasi Penangkal Petir + Grounding
Pembersihan

I I I .003
XVI I .034
XI X.005

PEKERJAAN PENATAAN HALAMAN
Pengukuran dan Pematokan
Urugan Tanah berbatu mendatangkan distemper
Pembersihan Lokasi/ Perataan Tanah
Galian Tanah Keras
Lapis Pondasi Macadam/ Stell Slaag
Pas. Kansteen Uk. 10.20.40 K-300
Pas. Paving Block t = 6 cm K-350 Abu-abu
Pas. Topi Uskup t = 6 cm K-350 Abu-abu

I .010
I I I .016
I .020
I I I .011
XXI I I .005
XXV.031
XXV.014
XXV.024

HARGA SATUAN
Rp.

JUMLAH
Rp.

KEGI ATAN PEMBANGUNAN GEDUNG KANTOR
REKAPI TULASI DAFTAR KUANTI TAS DAN HARGA
PEKERJAAN : LANJUTAN PEMBANGUNAN GOR KECAMATAN CI PUTAT TI MUR

REKAPI TULASI DAFTAR KUANTI TAS DAN HARGA
I . PEKERJAAN PERSI APAN

Rp.

I I . PEKERJAAN GALI AN DAN PONDASI

Rp.

I I I . PEKERJAAN BETON

Rp.

I V. PEKERJAAN PASANGAN

Rp.

V. PEKERJAAN PENGECATAN

Rp.

VI . PEKERJAAN PLAFOND

Rp.

VI I . PEKERJAAN PI NTU DAN JENDELA

Rp.

VI I I . PEKERJAAN KAMAR DAN SANI TAI R,SI GNAGE

Rp.

I X. I NSTALASI LI STRI K

Rp.

X. PEKERJAAN ATAP

Rp.

XI . PEKERJAAN LAI N-LAI N

Rp.

XI I . PEKERJAAN PENATAAN HALAMAN

Rp.

JUMLAH.

Rp.

PPN 10 %

Rp.

JUMLAH TOTAL
DI BULATKAN.

Rp.
2,177,127,000

Rp.

TERBI LANG :

-

DOMI SI LI , TANGGAL BULAN TAHUN
PENAWAR,
NAMA PERUSAHAAN

NAMA PI MPI NAN PERUSAHAAN
JABATAN