RUP BAPPEDA KAB. KONSEL 2013.

PENGUMUMAN
RENCANA UMUM PENGADAAN BARANG/JASA PEMERINTAH
SKPD
KODE
PPK
Tahun Anggaran

: BADAN PERENCANAAN PEMBANGUNAN DAERAH KABUPATEN KONAWE SELATAN
: 1.06.01
: PPK BAPPEDA
: 2013

SATUAN KERJA
NO

NAMA PAKET PEKERJAAN
KODE

1

2


1

1.06.17

2

3
4

LOKASI PEKERJAAN

1.06.17

1.06.17
1.06.18

5
6


1.06.18
1.06.01

7
8
9
10

1.06.02
1.06.03
1.06.04
1.06.05

11
12

1.06.18
1.06.18

13

14

1.06.18
1.06.18

15

1.06.18

16

1.06.07

17
18
19

1.06.08
1.06.09
1.06.10


20
21
22

1.06.11
1.06.05
1.06.05

23

1.06.05

NAMA
3

4

BAPPEDA Belanja Listrik
Belanja Penambahan Daya Listrik

Kantor 33.000 Watt
BAPPEDA Belanja Modal Pengadaan Meubeleur
Belanja Modal Pengadaan Meja Kerja
Belanja Modal Pengadaan Kursi Rapat
BAPPEDA Belanja Jasa Cleaning Service
BAPPEDA Belanja Modal Perlengkapan Kantor
Pengadaan White Board
Pengadaan papan Data
AC Aula 5 PK
Belanja Modal Pengadaan Gorden
BAPPEDA Belanja Bibit Tanaman/Bunga
BAPPEDA Belanja Desain Pemb. Gedung Serba Guna
Kantor 6%
BAPPEDA Belanja Desain Pembangunan Talud 6%
BAPPEDA Belanja Desain Pemb.Lampu Taman
BAPPEDA Belanja Desain Pembangunan Duiker
BAPPEDA Belanja Desain Pembangunan Interior
Ruangan 6%
BAPPEDA Belanja Modal Pembangunan Duiker
BAPPEDA Belanja Modal Pembangunan Lampu

Taman Kantor
BAPPEDA Belanja Modal Pembangunan Talud
BAPPEDA Belanja Modal Pembangunan Gedung
Serba Guna
BAPPEDA Belanja Modal pembangunan Interior
Ruangan Kantor Kepala Bappeda
BAPPEDA Belanja Pengawasan Pemb. Gedung Serba
Guna 5%
BAPPEDA Belanja Pengawasan Pembangunan Talud
BAPPEDA Belanja Pengawasan Pemb. Taman Kantor
BAPPEDA Belanja Pengawasan Pembangunan Duiker
Kantor 7%
BAPPEDA Belanja Pengawasan Interior Ruangan 5%
BAPPEDA Belanja Desain Pembangunan Jalan Desa
BAPPEDA Belanja Pengawasan Pembangunan Jalan
Desa 5%
BAPPEDA Belanja Desain Pembangunan Pasar Desa

CARA
PENGADAAN


VOLUME

5

RENCANA PENGANGGARAN

PELAKSANAAN PEMILIHAN
PENYEDIA
PERKIRAAN
WAKTU SELESAI
WAKTU MULAI
PELAKSANAAN
PELAKSANAAN

PELAKSANAAN PEKERJAAN
PERKIRAAN
WAKTU MULAI
PELAKSANAAN


WAKTU SELESAI
PELAKSANAAN

11

12

13

April 2013

Mei 2013

Mei 2013

Juni 2013

DAU
DAU
DAU


Pebruari 2013
Pebruari 2013
Pebruari 2013

Maret 2013
Maret 2013
Maret 2013

Maret 2013
Maret 2013
Maret 2013

April 2013
April 2013
Desember 2013

4,500,000.00
30,000,000.00
100,000,000.00

27,000,000.00
50,000,000.00
12,000,000.00

DAU
DAU
DAU
DAU
DAU
DAU

Pebruari 2013
Pebruari 2013
Pebruari 2013
Pebruari 2013
Pebruari 2013
Pebruari 2013

Maret 2013
Maret 2013

Maret 2013
Maret 2013
Maret 2013
Maret 2013

Maret 2013
Maret 2013
Maret 2013
Maret 2013
Maret 2013
Maret 2013

April 2013
April 2013
April 2013
April 2013
April 2013
April 2013

KONAWE SELATAN
KONAWE SELATAN
KONAWE SELATAN
KONAWE SELATAN

12,000,000.00
4,800,000.00
2,400,000.00
12,000,000.00

DAU
DAU
DAU
DAU

Pebruari 2013
Pebruari 2013
Pebruari 2013
Pebruari 2013

Maret 2013
Maret 2013
Maret 2013
Maret 2013

Maret 2013
Maret 2013
Maret 2013
Maret 2013

April 2013
April 2013
April 2013
April 2013

1 Paket
1 Paket

ANDOOLO
ANDOOLO

30,000,000.00
60,000,000.00

DAU
DAU

Maret 2013
Maret 2013

April 2013
April 2013

April 2013
April 2013

Juni 2013
Juni 2013

PBJ
PBJ

1 Paket
1 Paket

ANDOOLO
ANDOOLO

200,000,000.00
200,000,000.00

DAU
DAU

Maret 2013
Maret 2013

April 2013
April 2013

April 2013
April 2013

Juni 2013
Juni 2013

PBJ

1 Paket

ANDOOLO

150,000,000.00

DAU

Maret 2013

April 2013

April 2013

Juni 2013

PBJ

1 Paket

KONAWE SELATAN

10,000,000.00

DAU

Maret 2013

April 2013

April 2013

Juni 2013

PBJ
PBJ
PBJ

1 Paket
1 Paket
1 Paket

KONAWE SELATAN
KONAWE SELATAN
KONAWE SELATAN

10,000,000.00
4,200,000.00
2,100,000.00

DAU
DAU
DAU

Maret 2013
Maret 2013
Maret 2013

April 2013
April 2013
April 2013

April 2013
April 2013
April 2013

Juni 2013
Juni 2013
Juni 2013

PBJ
PBJ
PBJ

1 Paket
1 Paket
1 Paket

KONAWE SELATAN
KONAWE SELATAN
KONAWE SELATAN

10,500,000.00
DAU
14,700,000.00 DAU (sharing)
12,250,000.00 DAU (sharing)

Maret 2013
Maret 2013
Maret 2013

April 2013
April 2013
April 2013

April 2013
April 2013
April 2013

Juni 2013
Juni 2013
Juni 2013

PBJ

1 Paket

KONAWE SELATAN

14,100,000.00 DAU (sharing)

Maret 2013

April 2013

April 2013

Juni 2013

(KAB/KEC)

PERKIRAAN
(Rp,-)

SUMBER
DANA

6

7

8

9

10

PBJ

1 Paket

ANDOOLO

70,000,000.00

DAU

PBJ
PBJ
PBJ

1 Paket
15 Unit
1 Paket

ANDOOLO
ANDOOLO
ANDOOLO

50,000,000.00
22,500,000.00
100,000,000.00

PBJ
PBJ
PBJ
PBJ
PBJ
PBJ

3 Buah
1 Paket
4 Unit
1 Paket
1 Paket
1 Paket

ANDOOLO
ANDOOLO
ANDOOLO
ANDOOLO
ANDOOLO
KONAWE SELATAN

PBJ
PBJ
PBJ
PBJ

1 Paket
1 Paket
1 Paket
1 Paket

PBJ
PBJ

Halaman 1

KETERANGAN

14

SATUAN KERJA
NO

LOKASI PEKERJAAN
NAMA PAKET PEKERJAAN

KODE
1

2

24

1.06.05

25
26

1.06.18
1.06.18

27

1.06.18

28

1.06.18

29

1.06.18

30

1.06.18

31

1.06.18

32

1.06.18

33

1.06.18

34

1.06.18

35

1.06.18

36

1.06.18

37

1.06.18

NAMA
3

4

BAPPEDA Belanja Pengawasan Pembangunan Pasar
Desa 5%
BAPPEDA Belanja Pakai Dinas Harian
BAPPEDA Belanja Perawatan Kendaraan Roda 4
Eselon III Rehab Sedang
Eselon III Rehab Berat
BAPPEDA Belanja Jasa Penelitian Buku 10 Tahun
Konsel
BAPPEDA Belanja Pembangunan Rumah Masyarakat
Miskin
BAPPEDA Belanja Modal Pemeliharaan Gedung
Kantor
BAPPEDA Belanja Jasa Konsultansi Penelitian Master
Plan Kawasan Hutan
BAPPEDA Belanja Jasa Penelitian Rencana Detail
Kawasan Perindustrian
BAPPEDA Belanja Jasa Penelitian Rencana Detail
Kawasan Tanaman Pangan Berkelanjutan
BAPPEDA Belanja Jasa Penelitian Analisis Dampak
Lingkungan Pertambangan
BAPPEDA Belanja
Jasa
Penelitian
Studi
Pengembangan Pasar
BAPPEDA Belanja Jasa Penelitian Master Plan
Investasi Daerah
BAPPEDA Belanja
Jasa
Penelitian
Rencana
Pengembangan Pusat Kawasan Strategis
BAPPEDA Belanja Jasa Penelitian Pengaruh Investasi
Terhadap
Pertumbuhan
Ekonomi
Masyarakat

CARA
PENGADAAN

VOLUME
(KAB/KEC)

RENCANA PENGANGGARAN
PERKIRAAN
(Rp,-)

SUMBER
DANA

8

9

5

6

7

PBJ

1 Paket

KONAWE SELATAN

PBJ

68 Stel

ANDOOLO

23,800,000.00

PBJ
PBJ
SW

2 unit
1 unit
1 Paket

ANDOOLO
ANDOOLO
ANDOOLO

50,000,000.00
40,000,000.00
100,000,000.00

SW

100 Unit

KONAWE SELATAN

PBJ

1 Paket

ANDOOLO

50,000,000.00

SW

1 Paket

ANDOOLO

SW

1 Paket

SW

PELAKSANAAN PEMILIHAN
PENYEDIA
PERKIRAAN
WAKTU SELESAI
WAKTU MULAI
PELAKSANAAN
PELAKSANAAN

PELAKSANAAN PEKERJAAN
PERKIRAAN
WAKTU MULAI
PELAKSANAAN

WAKTU SELESAI
PELAKSANAAN

10

11

12

13

Maret 2013

April 2013

April 2013

Juni 2013

DAU

Pebruari 2013

Maret 2013

Maret 2013

April 2013

DAU
DAU
DAU

Maret 2013
Maret 2013

April 2013
April 2013

April 2013
April 2013
April 2013

Juni 2013
Juni 2013
September 2013

Januari 2013

September 2013

DAU

April 2013

September 2013

100,000,000.00

DAU

April 2013

September 2013

ANDOOLO

100,000,000.00

DAU

April 2013

September 2013

1 Paket

ANDOOLO

150,000,000.00

DAU

April 2013

September 2013

SW

1 Paket

ANDOOLO

200,000,000.00

DAU

Januari 2013

Juni 2013

SW

1 Paket

KONAWE SELATAN

100,000,000.00

DAU

April 2013

September 2013

SW

1 Paket

KONAWE SELATAN

200,000,000.00

DAU

April 2013

September 2013

SW

1 Paket

ANDOOLO

100,000,000.00

DAU

April 2013

September 2013

SW

1 Paket

ANDOOLO

150,000,000.00

DAU

April 2013

September 2013

11,750,000.00 DAU (sharing)

200,000,000.00 DAU (sharing)

KETERANGAN

Andoolo, 22 Januari 2013
Kepala BAPPEDA
Kabupaten Konawe Selatan
ttd
Arsalim, SE, M.Si
Pembina Tk.I. Gol IV/b
NIP. 19690628 200112 1 002

Halaman 2

14