BOQ 2 Shelter perhubungan

BILL OF QUANTITY (B O Q)
KEGIATAN
PEKERJAAN
TAHUN ANGGARAN
LOKASI

:
:
:
:

PEMBANGUNAN HALTE BUS,TAXI GEDUNG TERMINAL
PENGADAAN SHELTER 3 (TIGA) BUAH
2012
KOTA MANADO

DAFTAR 2 : MATA PEMBAYARAN UTAMA
No.

Uraian Pekerjaan


Satuan

A.
1
2
3
4
5
6
7

PEKERJAAN PASANGAN
Pasangan batu kosong
Pasangan batu kali , Sp. 1 : 4
Pekerjaan Beton Bertulang, Sp. 1 : 2 : 3
Pengecoran Beton Tumbuk, Sp. 1 : 3 : 5
Pekerjaan Plesteran sp 1:4
Pekerjaan Acian
Pasang tegel keramik 30 / 30


B.
1
2
3

PEKERJAAN GALIAN DAN URUGAN TANAH
Galian pondasi
Urugan Pasir
Urugan Tanah

C.
1
2
3
4

PEKERJAAN STRUKTUR BESI
Pasang Rangka Dasar, Tiang, Ikatan kaki (UMP 6)
Pasang Rangka Besi Dinding / Kisi-kisi mendatar
Pasang Rangka Besi Dinding / Kisi-kisi tegak

Pasang kisi-kisi

D.
1
2
3

PEKERJAAN ATAP
Pasang Kuda-Kuda Rangka Atap/Plafond
Pasang gording dan reng
Pasang penutup atap

E.
1
2
3
4
5

PEKERJAAN DINDING, PLAFOND & LISPLANK

Pasang penutup belakang
Pekerjaan plafond
Pekerjaan plafond luar
Pasang Dinding Bagian Dalam
Pasang dinding fiber warna

F.
1
2
3

PEKERJAAN PINTU DAN JENDELA
Pasang kosen alumumium
Pekerjaan pintu alumunium
Pekerjaan Rel Pintu

G.
1
2


PEKERJAAN INSTALASI LISTRIK
Pasang instalasi listrik
Pasang titik lampu

H.
1
2

PEKERJAAN RAILING DAN INTERIOR
Pasang railing (ramp / tangga)
Pasang railing (interior)

I.
1
2
3

PEKERJAAN PENGECATAN
Pengecatan tiang / kisi-kisi / dinding
Pengecatan tiang / kisi-kisi / dinding

Pengecatan dinding / plafond

Volume









1,98
14,12
0,89
2,44
23,76
23,76
31,80


Harga Satuan (Rp)
330.561,00
657.525,00
4.555.072,50
783.651,79
53.149,80
32.120,00
208.885,60
Sub Total

M'
M'
M'

2,97
1,20
11,70

60,00
56,40

42,00
69,60

59.950,00
182.380,00
86.372,00

195,30
72,00
31,80

120.725,00
121.286,00
121.286,00
66.255,75

37,50
46,80
6,84
37,50

25,43

121.286,00
127.028,00
71.896,00

57,00
19,50
3,00

111.590,60
42.977,00
53.320,00
42.977,00
84.678,00

182.743,00
779.292,25
546.953,00


30,90
12,00

34,80
6,00

75.130,00
87.043,00

262.399,50
359.128,00

9,60
118,08
91,14

2.321.517,00
1.044.516,00
3.366.033,00


Sub Total




10.416.351,00
15.196.198,88
1.640.859,00
27.253.408,88

Sub Total
M'
M'

4.184.647,50
2.011.323,60
364.708,80
1.611.637,50
2.152.938,15
10.325.255,55

Sub Total
M'
1 Ttk

23.687.155,80
9.146.015,80
2.286.292,80
35.119.464,40

Sub Total
M'

1 Set

7.243.500,00
6.840.530,40
5.094.012,00
4.611.400,01
23.789.442,41

Sub Total






178.051,50
218.856,00
1.010.552,40
1.407.459,90

Sub Total
M'
M'


654.510,78
9.286.883,10
4.058.569,60
1.908.975,75
1.262.839,25
763.171,20
6.642.562,08
24.577.511,76

Sub Total
M'
M'
M'
M'

Jumlah Harga (Rp)

9.131.502,51
2.154.767,99
11.286.270,50

79.337,50
79.337,50
30.316,00
Sub Total

Total Daftar 2
(Pindahkan ke daftar total rekapitulasi)

761.640,00
9.368.172,00
2.763.000,24
12.892.812,24
#REF!

PANITIA PENGADAAN
KETUA
SEKRETARIS
ANGGOTA
ANGGOTA
ANGGOTA

Joel I. Walandouw, ST. MT
Vanny A. Kandow, ST
Jeffrey Andries, ST. SST.Ak
Steeve G. Untu, ST
Nansi Kiling, ST

………………
………………
………………

………………
………………