17. Rehabilitasi Ruang Kantor dan Interior Kantor Walikota Tangerang Selatan.zip

ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN
No.

: I.001
: Mobilisasi
: set
URAIAN

A.
1
2
3

B.

Sewa Tanah / Kantor
Direksi keet uk. 3x4 m2, atap asbes gelombang, t = 5mm, kaca nako,
lengkap 1 set kursi/meubel sederhana, nilai kegiatan s/d 1 milyar
......................

......................
dll

Lembar 1.2-1
KODE

SATUAN

I.005

set

I.002
I.003

: unit
: unit

I.004
I.009


set
: m²

LAB.006
LAB.007
LAB.024
LAB.025
LAB.026
LAB.028

titik
titik
titik
Tes
km
km
....

VOL.


MOBILISASI DAN DEMOBILISASI PERALATAN
Periksa lembar 1.2-2

C.

3
4
5

FASILITAS KONTRAKTOR
: Papan Nama Proyek, bahan triplek 6 mm, uk. 60x90 cm Finish Cat
: Pelat Papan Nama Informasi Bangunan (Bahan Seng uk. 50 x 75
cm, tebal 0,4 mm, Finish Cat)
Photo proyek tiga phase color (isi 30, ASA 200)
: Pek. Pengukuran Kembali Site
......................
dll

1

2
3
4
5
6
7

FASILITAS LABORATORIUM
Sondir
Test Pitting
Core Drill
Uji Tekan Kubus/ Silinder Beton
Pengukuran Jalan KOTA Kurang Dari 50 km
Pengukuran Sungai KOTA Kurang Dari 50 km
......................
dll

1
2
3

4
5
6

MOBILISASI LAINNYA
PEKERJAAN DARURAT
Jembatan Darurat
Perkuatan Jembatan Lama
Pemeliharaan Jalan Kerja / Samping
......................
......................
......................
dll

LS
LS
LS
....
....
....


LAIN-LAIN
Komunikasi Lapangan Lengkap
......................
......................
......................
......................
......................

Set
....
....
....
....
....

1
2

D.


E.
E.I.

E.II.
1
2
3
4
5
6
F.

dll

LS
Total Biaya Mobilisasi

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.


HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

ITEM PEMBAYARAN NO.
JENIS PEKERJAAN

: I.001
: Mobilisasi
Lembar 1.2-2

No.

B.
1
2
3
4

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

25
26
27
28
29
30
31
32
33
34
35
36
37

URAIAN

KODE

SATUAN


MD E 001
MD E 002
MD E 003
MD E 004
MD E 005
MD E 006
MD E 007
MD E 008
MD E 009
MD E 010
MD E 011
MD E 012
MD E 013
MD E 014
MD E 015
MD E 016
MD E 017
MD E 018
MD E 019
MD E 020
MD E 021
MD E 022
MD E 023
MD E 024
MD E 025
MD E 026
MD E 027
MD E 028
MD E 029
MD E 030
MD E 031
MD E 032
MD E 033
MD E 034

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

PERALATAN (MOBILISASI & DEMOBILISASI)
Asphalt Mixing Plant, 150 HP, Kap. 50 T/Jam Pemborong
Asphalt Finisher, 47 HP, Kap. 6 ton Pemborong
Asphalt Sprayer, 15 HP, Kap. 800 Liter Pemborong
Bulldozer 100-150 HP, 140 HP, Kap. - Pemborong
Compressor 4000-6500 L\M, 80 HP, Kap. - Pemborong
Concrete Mixer 0.3-0.6 m³, 15 HP, Kap. 500 Liter Pemborong
Crane 10-15 TON, 150 HP, Kap. 15 ton Pemborong
Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Pemborong
Dump Truck, 125 HP, Kap. 18-21 m³ Pemborong
Excavator 80-140 HP, 80 HP, Kap. 0.5 m³ Pemborong
Flat Bed Truck 3-4 m³, 100 HP, Kap. 4 m³ Pemborong
Generator Set, 175 HP, Kap. 125 KVA Pemborong
Motor Grader >100 HP, 125 HP, Kap. - Pemborong
Track Loader 75-100 HP, 90 HP, Kap. 1.6 m³ Pemborong
Wheel Loader 1.0-1.6 m³, 105 HP, Kap. 1.5 m³ Pemborong
Three Wheel Roller 6-8 T, 55 HP, Kap. 8 ton Pemborong
Tandem Roller 6-8 T., 50 HP, Kap. 8 ton Pemborong
Tire Roller 8-10 T., 60 HP, Kap. 10 ton Pemborong
Vibratory Roller 5-8 T., 75 HP, Kap. 7 ton Pemborong
Concrete Vibrator, 10 HP, Kap. - Pemborong
Stone Crusher, 350 HP, Kap. 100 T/Jam Pemborong
Water Pump 70-100 mm, 6 HP, Kap. - Pemborong
Water Tanker 5000-8500 L., 100 HP, Kap. 4000 Liter Pemborong
Pedestrian Roller, 11 HP, Kap. 0.98 ton Pemborong
Tamper, 5 HP, Kap. 0.17 ton Pemborong
Jack Hammer, 3 HP, Kap. - Pemborong
Fulvi Mixer, 75 HP, Kap. - Pemborong
Concrete Pump Pemborong
Trailer 15 ton Pemborong
Pile Driver + Hammer, 25-35 ton Pemborong
Dump Truck Crane 35 ton Pemborong
Welding Set Pemborong
Bore Pile Machine Pemborong
ASPHALT LIQUID MIXER, 5 HP, kap 1000 Liter Pemborong
Concenrete Cutter
......................
......................
dll

Total untuk Item B pada Lembar 1

VOL.

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)