LPSE Kabupaten Bone Bolango KOREKSI ARITMATIK

TABEL 1 KOREKSI ARITMATIK
PROGRAM
KEGIATAN
PEKERJAAN

:
:
: : PENYEDIAAN JARINGAN AIR MINUM
KAWASAN SIAP BANGUN (KASIBA)
LOKASI
: : KEC. TILONGKABILA - BONE BOLANGO
THN ANG.
:
2012
PAGU ANGG. :
1,953,847,100.00
HPS
:
1,953,847,100.00
PENAWARAN
PADA SAAT PEMBUKAAN PENAWARAN

NO

1
1
2
3
4
5

NAMA PERUSAHAAN

CV.SINAR MULIA UTAMA
CV. MATARAM
CV. CAHAYA KARTINI
CV. UTAMA TEKNIK MANDIRI
CV. BUMI BERINGIN JAYA

PERINGKAT

TOTAL HARGA

PENAWARAN TERMASUK
PPN 10% (Rp)

PERINGKAT
SETELAH
KOREKSI

3

4

5

6

1,689,825,000.00
1,738,921,000.00
1,772,584,000.00
1,813,344,000.00
1,837,061,000.00


1
2
3
4
5

TOTAL HARGA PENAWARAN
TERMASUK PPN 10% (Rp)

2
Rp
Rp
Rp
Rp
Rp

HASIL KOREKSI ARITMATIK

Rp

Rp
Rp
Rp
Rp

1,691,392,000.00
1,739,103,000.00
1,767,995,700.00
1,810,466,000.00
1,837,006,000.00

1
2
3
4
5

% THD
HPS


KETERANGAN
(NILAI / PERINGKAT)

7
86.57
89.01
90.49
92.66
94.02

BERUBAH / TETAP
BERUBAH / TETAP
BERUBAH / TETAP
BERUBAH / TETAP
BERUBAH / TETAP

BONE BOLANGO, 21 SEPTEMBER 2012
POKJA KONSTRUKSI ULP KAB. BONE BOLANGO
1 IRWAN KURNIAWAN, ST
2 RAHMAN HASAN, ST

3 RAHMIATY PAKAJA, S.ST

1 ……………………..
2 ……………………………….
3 ……………………..