ARITMATIK APBDP 2011 EMAIL kota sungai penuh

HASIL KOREKSI ARITMATIK

No

KEGIATAN

:

PEKERJAAN

:

NO. PAKET
LOKASI
KOTA
HPS/OE

:
:
:


Rp

NAMA PERUSAHAAN

1
1
2
3
4
5
6
7
8
9
10
11

PENINGKATAN JALAN DAN JEMBATAN
- Jalan Jembatan I - Bukit Khayangan (Hotmix)
01

KEC. SUNGAI PENUH
Sungai Penuh

2
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.

SUMBER TRATINDO UTAMA
BELIMBING SRIWIJAYA
ROGANTINA JAYA SAKTI
MASAYU KONTRINDO

MULYA PERMAI LAKSONO
USAHA PRATAMA SARI
CITRA MUDA NOER BERSAUDARA
MERANGIN KARYA SEJATI
FAMILI GROUP UTAMA
HENDRA PUTRA
AZKA PEMBANGUNAN MERANGIN

7,325,000,000.00

TOTAL HARGA
PENAWARAN SAAT
PEMBUKAAN
PENAWARAN (Rp)

TOTAL HARGA
TERKOREKSI TERHADAP
VOLUME HPS/OE
(Rp)


3

4

6,517,244,000.00
6,585,577,000.00
6,661,280,000.00
6,732,837,000.00
6,805,815,000.00
6,885,522,000.00
6,907,897,900.00
7,032,032,000.00
7,105,105,000.00
7,215,125,000.00
7,251,750,000.00

6,517,244,000.00
6,585,577,000.00
6,661,280,000.00
6,732,837,000.00

6,805,815,000.00
6,885,522,000.00
6,907,897,900.00
7,032,032,000.00
7,105,105,000.00
7,215,125,000.00
7,251,750,000.00

PROSENTASE
HARGA
TERKOREKSI
TERHADAP
HPS/OE (%)
5=4:HPS x 100
88.97
89.91
90.94
91.92
92.91
94.00

94.31
96.00
97.00
98.50
99.00

URUTAN
PERINGKAT

KET

6

7

1
2
3
4
5

6
7
8
9
10
11

HASIL KOREKSI ARITMATIK
KEGIATAN
PEKERJAAN
NO. PAKET
LOKASI
KOTA

:
:
:
:
:


HPS/OE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Rp


NAMA PERUSAHAAN

1

2
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.
PT.


PENINGKATAN JALAN DAN JEMBATAN
- Jalan Ulu Air - Bukit Khayangan (Pelebaran)
02
Kec. Kumun Debai
Sungai Penuh

FIKRI INDAH SEJAHTERA
PURNA GRAHA ABADI
IRHDE JAYA NUSA
MASAYU KONTRINDO
BELIMBING SRIWIJAYA
ROGANTINA JAYA SAKTI
SUMBER TRATINDO UTAMA
MULYA PERMAI LAKSONO
CITRA MUDA NOER BERSAUDARA
USAHA PRATAMA SARI
MERANGIN KARYA SEJATI
FAMILI GROUP UTAMA
HENDRA PUTRA

AZKA PEMBANGUNAN MERANGIN

3,000,000,000.00

TOTAL HARGA
PENAWARAN SAAT
PEMBUKAAN
PENAWARAN (Rp)

TOTAL HARGA
TERKOREKSI TERHADAP
VOLUME HPS/OE
(Rp)

3

4

2,502,182,000.00
2,637,604,000.00
2,641,823,000.00
2,668,052,000.00
2,698,501,000.00
2,728,047,000.00
2,758,155,000.00
2,787,880,000.00
2,817,407,500.00
2,817,605,000.00
2,909,909,000.00
2,940,094,000.00
2,955,000,000.00
2,970,000,000.00

2,502,182,000.00
2,637,604,000.00
2,641,823,000.00
2,668,052,000.00
2,698,501,000.00
2,728,047,000.00
2,758,155,000.00
2,787,880,000.00
2,817,407,500.00
2,817,605,000.00
2,909,909,000.00
2,940,094,000.00
2,955,000,000.00
2,970,000,000.00

PROSENTASE
HARGA
TERKOREKSI
TERHADAP
HPS/OE (%)
5=4:HPS x 100
83.41
87.92
88.06
88.94
89.95
90.93
91.94
92.93
93.91
93.92
97.00
98.00
98.50
99.00

URUTAN
PERINGKAT

KET

6

7

1
2
3
4
5
6
7
8
9
10
11
12
13
14

HASIL KOREKSI ARITMATIK
KEGIATAN
PEKERJAAN

:
:

NO. PAKET

:

LOKASI
KOTA

:
:

HPS/OE

No

1
2
3
4
5
6
7

Rp

NAMA PERUSAHAAN

1

PENINGKATAN JALAN DAN JEMBATAN
- Jalan Sungai Penuh - Tanah Kampung - Batas Kota
03
Kec. Tanah Kampung
Sungai Penuh
2,725,000,000.00

TOTAL HARGA
PENAWARAN SAAT
PEMBUKAAN
PENAWARAN (Rp)

TOTAL HARGA
TERKOREKSI TERHADAP
VOLUME HPS/OE
(Rp)

3

4

2
PT.
CV.
PT.
PT.
PT.
PT.
PT.

AIR TENANG
KRESHNA DWIPA
MERANGIN KARYA SEJATI
HENDRA PUTRA
FAMILI GROUP UTAMA
AZKA PEMBANGUNAN MERANGIN
SINAR KARYA

2,425,250,000.00
2,530,000,000.00
2,616,111,600.00
2,629,625,000.00
2,643,300,000.00
2,656,875,000.00
2,670,500,000.00

PROSENTASE
HARGA
TERKOREKSI
TERHADAP
HPS/OE (%)
5=4:HPS x 100

2,425,250,000.00
2,530,000,000.00
2,616,111,600.00
2,629,625,000.00
2,643,300,000.00
2,656,875,000.00
2,670,500,000.00

89.00
92.84
96.00
96.50
97.00
97.50
98.00

URUTAN
PERINGKAT

KET

6

7

1
2
3
4
5
6
7

HASIL KOREKSI ARITMATIK
KEGIATAN

:

PEKERJAAN
NO. PAKET
LOKASI

:
:
:

KOTA

:

HPS/OE

No

1
2
3
4
5
6
7
8
9
10
11
12
13

Rp

NAMA PERUSAHAAN

1

2
CV.
CV.
CV.
CV.
CV.
CV.
CV.
CV.
CV.
CV.
CV.
CV.
CV.

PENINGKATAN JALAN DAN JEMBATAN
- Jalan Koto Beringin - Koto Bento (Peningkatan)
04
Kec. Hamparan Rawang
Sungai Penuh

PANDAN MANGURAI
LENTERA TANJUNG
KERINCI MADANI SENTOSA
KESA KESI
PUTRA ABADI
AURA PRATAMA
PADUAN BHAKTI
SINAR MASA
ANANDA SAKTI
KANYAHO BATUAH
AZKA JAYA MANDIRI
PUTRA KERINCI
BUDI UTAMA

450,000,000.00

TOTAL HARGA
PENAWARAN SAAT
PEMBUKAAN
PENAWARAN (Rp)

TOTAL HARGA
TERKOREKSI TERHADAP
VOLUME HPS/OE
(Rp)

PROSENTASE
HARGA
TERKOREKSI
TERHADAP
HPS/OE (%)

URUTAN
PERINGKAT

KET

3

4

5=4:HPS x 100

6

7

360,000,000.00
373,232,000.00
378,199,000.00
382,382,000.00
382,410,000.00
383,514,000.00
391,050,000.00
393,075,000.00
393,300,000.00
393,393,300.00
396,000,000.00
400,050,000.00
405,000,000.00

360,000,000.00
373,232,000.00
378,199,000.00
382,382,000.00
382,410,000.00
383,514,000.00
391,050,000.00
393,075,000.00
393,300,000.00
393,393,300.00
396,000,000.00
400,050,000.00
405,000,000.00

80.00
82.94
84.04
84.97
84.98
85.23
86.90
87.35
87.40
87.42
88.00
88.90
90.00

1
2
3
4
5
6
7
8
9
10
11
12
13