A Instalasi Main Line Air Bersih & Air Kotor
1 Pipa air bersih PPR PN20
Dia. 3'
Dia. 21/2"
Pipa GIP Ke PDAM Dia. 2"
Fitting & aksesoris
48,00
98,00
70,00
1,00
m
m
m
ls
B Instalasi Air Bersih & Air Kotor Dalam Gedung
1 Lantai 1
3 Pipa air kotor PVC AW
Dia. 4"
204,00
Dia. 3"
158,00
Fitting & aksesoris
1,00
Clean Out dia. 4"
1,00
m
m
ls
bh
C INSTALASI TANDON AIR AREA LOUNDRY
KITVHEN, KANTEEN & K. JENAZAH
1 Pompa Distribusi
Kapasitas : 275 LPM
Total Head : 40 meter
Power
: 3,7 KW
2 Accessories dan sarana pernunjang R.Pompa
3 Pipa Hisap
Pipa GIP dia. 2"
Gate valve dia. 2"
Strainer dia. 2"
Foot valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
4 Pipa Tekan
Pipa GIP dia. 2"
Gate valve dia. 21/2"
Gate valve dia. 2"
Check Valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
5 Pressure gauge
6 Pressure switch
7 WLC
2,00
unit
1,00
ls
8,00
2,00
2,00
2,00
2,00
1,00
m
bh
bh
bh
bh
ls
36,00
5,00
1,00
1,00
2,00
1,00
1,00
5,00
5,00
m
bh
bh
bh
bh
bh
bh
bh
set
D INSTALASI PLUMBING AREA CSSD
1
Water Heater Kaps. 100L
1
3
1,00
unit
Instalasi Air Bersih Pipa air bersih PPR PN20
Dia. 1'
Dia. 3/4"
Fitting & aksesoris
15,00
51,00
1,00
m
m
ls
Pipa air kotor PVC AW
Dia. 4"
Dia. 3"
Fitting & aksesoris
Floor drain dia. 4"
Floor drain dia. 3"
Clean Out dia. 4"
25,00
20,00
1,00
4,00
3,00
2,00
m
m
ls
bh
bh
bh
TOTAL PEKERJAAN PLUMBING GEDUNG UTAMA
NO
I
URAIAN PEKERJAAN
VOLUME SAT
PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK
A Pelalatan Utama
1 Pompa Distribusi
Kapasitas : 275 LPM
Total Head : 40 meter
Power
: 3,7 KW
2 Pipa Header Dia. 4"
3 Accessories dan sarana pernunjang R.Pompa
4 Pipa Hisap
Pipa GIP dia. 2"
Gate valve dia. 2"
Strainer dia. 2"
Foot valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
5 Pipa Tekan
Pipa GIP dia. 2"
Gate valve dia. 2"
Check Valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
6 Pressure gauge
7 Pressure switch
8 Ground Tank 10 m3
B Instalasi Main Line Air Bersih & Air Kotor
1 Pipa air bersih PPR PN20
Dia. 11/2"
Fitting & aksesoris
2,00
unit
1,00
1,00
unit
ls
8,00
2,00
2,00
2,00
2,00
1,00
m
bh
bh
bh
bh
ls
10,00
2,00
2,00
2,00
1,00
2,00
2,00
1,00
m
bh
bh
bh
bh
bh
bh
unit
40,00
1,00
m
ls
HARGA SATUAN JMLH HARGA
(Rp)
(Rp)
NO
URAIAN PEKERJAAN
2 Pipa Air Kotor PVC AW
Dia.4"
Dia. 3"
Dia.2"
Fitting & aksesoris
3 Septictank dan Resapan
4 Grease Trap
VOLUME
40,70
55,00
11,00
1,00
3,00
1,00
C Instalasi Air Bersih & Air Kotor Dalam Gedung
1 Lantai 1
1 Pipa air bersih PPR PN20
Dia. 11/2"
39,00
Dia. 1"
23,60
Dia. 3/4""
177,60
Fitting & aksesoris
1,00
2 Gate Valve
Dia. 3/4"
4,00
Dia. 1"
1,00
3 Pipa air kotor PVC AW
Dia. 4"
50,50
Dia. 3"
23,10
Dia. 2"
57,20
Fitting & aksesoris
1,00
4 Sanitary
Floor drain
Kran air
Clean out dia. 4"
Clean out dia. 3"
2
Lantai 2
1 Pipa air bersih PPR PN20
Dia. 11/2"
Dia. 3/4""
Fitting & aksesoris
2 Gate Valve
Dia. 3/4"
Dia. 1 1/4"
3 Pipa air kotor PVC AW
Dia. 4"
Dia. 3"
Dia. 2"
Dia. 2 1/2"
Fitting & aksesoris
4 Sanitary
Floor drain
Kran air
Clean out dia. 4"
Clean out dia. 3"
Clean out dia. 2"
SAT
m
m
m
ls
unit
unit
m
m
m
ls
bh
bh
m
m
m
ls
6,00
9,00
3,00
2,00
bh
bh
bh
bh
28,60
70,90
1,00
m
m
ls
2,00
1,00
bh
bh
22,00
47,80
57,70
7,00
1,00
m
m
m
m
ls
3,00
11,00
1,00
4,00
6,00
bh
bh
bh
bh
bh
HARGA SATUAN JMLH HARGA
(Rp)
(Rp)
By SipiL
By SipiL
By SipiL
By SipiL
NO
3
1
2
3
4
URAIAN PEKERJAAN
Lantai 3
Pipa air bersih PPR PN20
Dia. 11/2"
Dia. 3/4""
Fitting & aksesoris
Gate Valve
Dia. 3/4"
Dia. 1 1/4"
Pipa air kotor PVC AW
Dia. 4"
Dia. 3"
Dia. 2"
Dia. 11/2"
Fitting & aksesoris
Sanitary
Floor drain
Kran air
Clean out dia. 4"
Clean out dia. 3"
VOLUME
SAT
28,60
106,70
1,00
m
m
ls
2,00
1,00
bh
bh
22,00
47,80
63,80
11,60
1,00
m
m
m
m
ls
3,00
15,00
4,00
8,00
bh
bh
bh
bh
TOTAL PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK
TOTAL PEKERJAAN PLUMBING
PAJAK 10 %
JUMLAH TERMASUK PAJAK
DIBULATKAN
TERBILANG :
HARGA SATUAN JMLH HARGA
(Rp)
(Rp)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
PEKERJAAN PLUMBING
NO
I
URAIAN PEKERJAAN
VOLUME
SAT
HARGA SATUAN JMLH HARGA
(Rp)
(Rp)
PEKERJAAN PLUMBING BANGUNAN UTAMA & TURUTAN ( TAHAP III )
A Instalasi Main Line Air Bersih & Air Kotor
1 Pipa air bersih PPR PN20
Dia. 3'
Dia. 21/2"
Pipa GIP Ke PDAM Dia. 2"
Fitting & aksesoris
48,00
98,00
70,00
1,00
m
m
m
ls
B Instalasi Air Bersih & Air Kotor Dalam Gedung
1 Lantai 1
3 Pipa air kotor PVC AW
Dia. 4"
204,00
Dia. 3"
158,00
Fitting & aksesoris
1,00
Clean Out dia. 4"
1,00
m
m
ls
bh
C INSTALASI TANDON AIR AREA LOUNDRY
KITVHEN, KANTEEN & K. JENAZAH
1 Pompa Distribusi
Kapasitas : 275 LPM
Total Head : 40 meter
Power
: 3,7 KW
2 Accessories dan sarana pernunjang R.Pompa
3 Pipa Hisap
Pipa GIP dia. 2"
Gate valve dia. 2"
Strainer dia. 2"
Foot valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
4 Pipa Tekan
Pipa GIP dia. 2"
Gate valve dia. 21/2"
Gate valve dia. 2"
Check Valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
5 Pressure gauge
6 Pressure switch
7 WLC
2,00
unit
1,00
ls
8,00
2,00
2,00
2,00
2,00
1,00
m
bh
bh
bh
bh
ls
36,00
5,00
1,00
1,00
2,00
1,00
1,00
5,00
5,00
m
bh
bh
bh
bh
bh
bh
bh
set
D INSTALASI PLUMBING AREA CSSD
1
Water Heater Kaps. 100L
1
3
1,00
unit
Instalasi Air Bersih Pipa air bersih PPR PN20
Dia. 1'
Dia. 3/4"
Fitting & aksesoris
15,00
51,00
1,00
m
m
ls
Pipa air kotor PVC AW
Dia. 4"
Dia. 3"
Fitting & aksesoris
Floor drain dia. 4"
Floor drain dia. 3"
Clean Out dia. 4"
25,00
20,00
1,00
4,00
3,00
2,00
m
m
ls
bh
bh
bh
TOTAL PEKERJAAN PLUMBING GEDUNG UTAMA
NO
I
URAIAN PEKERJAAN
VOLUME SAT
PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK
A Pelalatan Utama
1 Pompa Distribusi
Kapasitas : 275 LPM
Total Head : 40 meter
Power
: 3,7 KW
2 Pipa Header Dia. 4"
3 Accessories dan sarana pernunjang R.Pompa
4 Pipa Hisap
Pipa GIP dia. 2"
Gate valve dia. 2"
Strainer dia. 2"
Foot valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
5 Pipa Tekan
Pipa GIP dia. 2"
Gate valve dia. 2"
Check Valve dia. 2"
Flexible Joint dia. 2"
Fitting dan aksesoris
6 Pressure gauge
7 Pressure switch
8 Ground Tank 10 m3
B Instalasi Main Line Air Bersih & Air Kotor
1 Pipa air bersih PPR PN20
Dia. 11/2"
Fitting & aksesoris
2,00
unit
1,00
1,00
unit
ls
8,00
2,00
2,00
2,00
2,00
1,00
m
bh
bh
bh
bh
ls
10,00
2,00
2,00
2,00
1,00
2,00
2,00
1,00
m
bh
bh
bh
bh
bh
bh
unit
40,00
1,00
m
ls
HARGA SATUAN JMLH HARGA
(Rp)
(Rp)
NO
URAIAN PEKERJAAN
2 Pipa Air Kotor PVC AW
Dia.4"
Dia. 3"
Dia.2"
Fitting & aksesoris
3 Septictank dan Resapan
4 Grease Trap
VOLUME
40,70
55,00
11,00
1,00
3,00
1,00
C Instalasi Air Bersih & Air Kotor Dalam Gedung
1 Lantai 1
1 Pipa air bersih PPR PN20
Dia. 11/2"
39,00
Dia. 1"
23,60
Dia. 3/4""
177,60
Fitting & aksesoris
1,00
2 Gate Valve
Dia. 3/4"
4,00
Dia. 1"
1,00
3 Pipa air kotor PVC AW
Dia. 4"
50,50
Dia. 3"
23,10
Dia. 2"
57,20
Fitting & aksesoris
1,00
4 Sanitary
Floor drain
Kran air
Clean out dia. 4"
Clean out dia. 3"
2
Lantai 2
1 Pipa air bersih PPR PN20
Dia. 11/2"
Dia. 3/4""
Fitting & aksesoris
2 Gate Valve
Dia. 3/4"
Dia. 1 1/4"
3 Pipa air kotor PVC AW
Dia. 4"
Dia. 3"
Dia. 2"
Dia. 2 1/2"
Fitting & aksesoris
4 Sanitary
Floor drain
Kran air
Clean out dia. 4"
Clean out dia. 3"
Clean out dia. 2"
SAT
m
m
m
ls
unit
unit
m
m
m
ls
bh
bh
m
m
m
ls
6,00
9,00
3,00
2,00
bh
bh
bh
bh
28,60
70,90
1,00
m
m
ls
2,00
1,00
bh
bh
22,00
47,80
57,70
7,00
1,00
m
m
m
m
ls
3,00
11,00
1,00
4,00
6,00
bh
bh
bh
bh
bh
HARGA SATUAN JMLH HARGA
(Rp)
(Rp)
By SipiL
By SipiL
By SipiL
By SipiL
NO
3
1
2
3
4
URAIAN PEKERJAAN
Lantai 3
Pipa air bersih PPR PN20
Dia. 11/2"
Dia. 3/4""
Fitting & aksesoris
Gate Valve
Dia. 3/4"
Dia. 1 1/4"
Pipa air kotor PVC AW
Dia. 4"
Dia. 3"
Dia. 2"
Dia. 11/2"
Fitting & aksesoris
Sanitary
Floor drain
Kran air
Clean out dia. 4"
Clean out dia. 3"
VOLUME
SAT
28,60
106,70
1,00
m
m
ls
2,00
1,00
bh
bh
22,00
47,80
63,80
11,60
1,00
m
m
m
m
ls
3,00
15,00
4,00
8,00
bh
bh
bh
bh
TOTAL PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK
TOTAL PEKERJAAN PLUMBING
PAJAK 10 %
JUMLAH TERMASUK PAJAK
DIBULATKAN
TERBILANG :
HARGA SATUAN JMLH HARGA
(Rp)
(Rp)