LPSE Kementerian Agama KEC. KAHU
PEKERJAAN :
BALAI NIKAH DAN MANASIK HAJI
PEMBANGUNAN
GEDUNG DAN FASILITAS
BALAI NIKAH DAN MANASIK HAJI
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
LOKASI : KECAMATAN KAHU
CV. ORIENT ENGINEERING
DAFTAR ISI
NAMA GAMBAR
HALAMAN
NAMA GAMBAR
HALAMAN
PETA LOKASI
1
RECANA ATAP
18
SITE PLAN
2
RENC. INSTALASI LISTRIK
19
DENAH lOKASI
3
RECANA GARIS ATAP
20
DENAH
4
LAYOUT FURNITURE
21
RENC. KABEL LAN DAN TV
22
RENCANA PLAFOND DALAM
23
DETAIL PLAFOND
24
RENCANA PLAFOND LUAR
25
26
TAMPAK DEPAN
5
TAMPAK BELAKSNG
TAMPAK SAMPING KANAN
TAMPAK SAMPING KIRI
6
POTONGAN A - A
7
RENCANA KERAMIK
POTONGAN B - B
8
RENCANA PONDASI
9
DETAIL POT. PLAT TOILET
DETAIL PIPABUANGAN AIR HUJAN
POTONGAN PLAFOND
SEPTIK TANK
DETAIL PONDASI BATU KALI
10
RESEPSIONIS
DETAIL POER
27
28
29
RENCANA RINGBALK
11
PAGAR
30
DETAIL PEMBESIAN
12
POTONGAN PAGAR
31
PERLETAKAN KUSEN
13
DETAIL KUSEN PINTU DAN JENDELA
14
DETAIL KUSEN PINTU DAN JENDELA
15
DETAIL KUSEN PINTU DAN JENDELA
16
RENCANA ATAP
17
U
PETA KABUPATEN BONE
B
T
S
KE
C.
CE
NR
AN
A
KEC.AJANGALE
OE
CC
UA
BO
C.D
KE
E
NG
ING
KEC.AMALI
TT
SIA
LU
EL
C.T
KE
KEC.AWANGPO
KA
AK
AL
C.P
KE
KEC.LAMURU
KEC.TAN
RIATTAN ETE
G TIMUR
RIA KEC
TT .TA
AN NE
T
G
BA E
RA
T
KEC.ULAWENG
KEC.TANE
TE
RIATTANG
NE
SAHRULI ASMAR, ST, MSi
PO
E
KEC.BAREBBO
KE
C.T
EL
LU
LIM
KEC.BENGO
KEC.PONRE
KEC.SIBULUE
SAHRUDIN, S.Ag
KEC.CINA
KEC.LAPPARIAJA
KEC. MARE
DRS. SUDIRMAN, S.ST, MSI
KEC.LIBURENG
PETA SULAWESI SELATAN
KEC. TONRA
KEC. PATIMPENG
Luwu Utara
Luwu Timur
Drs. H. M. AMIN M., M.HI
Luwu
KEC. KAHU
Tanah Toraja Utara
KEC. SALOMEKKO
Palopo
CV. ORIENT ENGINEERING
Tanah Toraja
KEC. BONTOCANI
Luwu
Pinrang
KEC. KAJUARA
Pinrang
Sidrap
Wajo
Parepare
Ir. ABD. BASIT AMIR
Soppeng
Barru
Bone
Pangkep
Maros
sar
kas
Ma
PETA LOKASI
Sinjai
Gowa
Takalar
Bulukumba
Bantaeng
Jeneponto
INDEX PETA
PETA LOKASI
JALAN POROS PALATTAE
2000
2480
2690
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
MESJID
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
2350
SITE PLAN
SITE PLAN KUA KAHU
SKALA 1:150
R. BALAI NIKAH &
MANASAIK HAJI
150
R. LAMMING
+0.25
PANTRY
TERAS
-0.05
RUANG
PENYULUH
150
343
243
2350
TERAS
-0.05
RUANG TAMU
RESEPSIONIS
KORIDOR
MUSOLLAH
2480
RUANG
PENGHULU
KM / WC
-0.05
TEMPAT WUDHU
RUANG
KEPALA KUA
RUANG STAFF
KM / WC
-0.05
RUANG
KOMPUTER
RUANG
ARSIP
DENAH LOKASI
2400
725
437
454
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
2000
50
Drs. H. M. AMIN M., M.HI
200
100
350
CV. ORIENT ENGINEERING
590
Ir. ABD. BASIT AMIR
DENAH LOKASI
A
1850
350
300
350
150
125
225
350
100
250
125
RUANG
KEPALA KUA
350
RUANG STAFF
RUANG
ARSIP
RUANG
KOMPUTER
200
KM / WC
-0.05
100
450
200
TERAS
-0.05
150
B
RUANG TAMU
1300
RESEPSIONIS
MUSOLLAH
B
250
KORIDOR
RUANG
PENYULUH
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
400
1300
50
200
150
DRS. SUDIRMAN, S.ST, MSI
R. LAMMING
+0.00
RUANG
PENGHULU
KM / WC
-0.05
125
100
200
450
250
Drs. H. M. AMIN M., M.HI
450
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
125
250
350
100
250
1600
A
150
TEMPAT WUDHU
350
R. BALAI NIKAH &
MANASAIK HAJI
PANTRY
350
TERAS
-0.05
100
DENAH
SKALA 1:100
BALAI NIKAH DAN MANASIK HAJI
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
Tampak Depan
SKALA 1:100
BALAI NIKAH DAN MANASIK HAJI
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
SAHRULI ASMAR, ST, MSi
Tampak Depan
SKALA 1:100
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
Tampak Belakang
SKALA 1:100
Tampak Depan
Tampak Belakang
SAHRULI ASMAR, ST, MSi
Tampak Samping Kanan
SKALA 1:100
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
Tampak Samping Kanan
Tampak Samping KIRI
Tampak Samping KIRI
SKALA 1:100
Genteng Bubungan Multi Roof
Genteng Multi Roof
Kuda-kuda Baja Ringan
Reng Baja Ringan
Nusaplank
850
390
850
345
208
80
200
Kalsiboard T: 3,5mm
SAHRULI ASMAR, ST, MSi
245
130
250
230
Kalsiboard T: 3,5mm
Kalsiboard T: 3,5mm
80
SAHRUDIN, S.Ag
Dinding Finish Cat
Dinding Finish Cat
50
Dinding Finish Cat
450
350
DRS. SUDIRMAN, S.ST, MSI
RUANG STAFF
RUANG PENGHULU
30
Drs. H. M. AMIN M., M.HI
80
125
125
CV. ORIENT ENGINEERING
1550
Ir. ABD. BASIT AMIR
POTONGAN A - A
SKALA 1:100
POTONGAN A - A
802
100
100
100
100
100
100
100
102
Nusaplank
390
500
80
500
Kalsiboard T: 3,5mm
Kalsiboard T: 3,5mm
Kalsiboard T: 3,5mm
SAHRULI ASMAR, ST, MSi
18
80
60
352
SAHRUDIN, S.Ag
40
Dinding Finish Cat
Dinding Finish Cat
Dinding Finish Cat
Dinding Finish Cat
450
DRS. SUDIRMAN, S.ST, MSI
300
MUSOLLAH
KORIDOR
RUANG TAMU
200
TERAS
-0.05
30
60
80
350
1250
250
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
1600
Ir. ABD. BASIT AMIR
POTONGAN B - B
SKALA 1:100
POTONGAN B - B
1850
100
350
300
350
K1
150
S1
350
100
250
K1
Poer
Poer
K3
S1
K1
K1
350
S1
K1
K3
K3
K1
S1
450
K3
K1
S1
S1
K1
SAHRULI ASMAR, ST, MSi
K1
250
S1
S1
K1
S1
K2
SAHRUDIN, S.Ag
K1
1300
400
K1
200
S1
S1
K1
1300
DRS. SUDIRMAN, S.ST, MSI
K1
K1
K1
S1
K1
K1
K1
S1
K1
S1
K1
K2
350
S1
K1
K3
K1
Drs. H. M. AMIN M., M.HI
450
K3
CV. ORIENT ENGINEERING
S1
S1
150
S1
K1
K1
K1
K1
Poer
Poer
S1
K1
Ir. ABD. BASIT AMIR
K3
100
200
K3
450
250
250
350
100
250
1600
RENCANA PONDASI
RENCANA PONDASI
SKALA 1:100
15
PLIN LANTAI CAT MINYAK
(WARNA HITAM)
30
PASANGAN 1/2 BATU BATA
SLOF 20/30
150
PONDASI BATU KALI
30
30
10
SAHRULI ASMAR, ST, MSi
20
30
20
18
60
11
20
SAHRUDIN, S.Ag
25
80
60
TANAH URUG
DRS. SUDIRMAN, S.ST, MSI
20
5
60
BATU KOSONG
PASIR URUG
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
60
60
Ir. ABD. BASIT AMIR
DETAIL POER
25
SKALA 1:20
60
DETAIL PONDASI BATU KALI 1
SKALA 1:20
DETAIL PONDASI BATU
KALI & DETAIL POER
1850
350
300
350
150
350
100
250
RB 15 X 20
125
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
400
1300
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
350
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
200
450
SAHRULI ASMAR, ST, MSi
RB 15 X 20
1300
RB 15 X 20
250
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
350
125
450
CV. ORIENT ENGINEERING
150
RB 15 X 20
450
RB 15 X 20
RB 15 X 20
RB 15 X 20
125
200
Drs. H. M. AMIN M., M.HI
125
RB 15 X 20
250
250
Ir. ABD. BASIT AMIR
350
100
250
1600
RENCANA RINGBALK
SKALA 1:100
RENCANA RINGBALK
15
30
30
15
30
15
SAHRULI ASMAR, ST, MSi
DETAIL (K1)
SKALA 1:20
DETAIL (K2)
SKALA 1:20
DETAIL (K3)
SKALA 1:20
SAHRUDIN, S.Ag
20
15
30
DRS. SUDIRMAN, S.ST, MSI
20
Drs. H. M. AMIN M., M.HI
DETAIL SLOOP
SKALA 1:20
DET. RINGBALK
SKALA 1:20
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
DETAIL PEMBESIAN
1850
100
350
300
125
J1
350
150
J1
J2
J1
350
100
250
125
J1
P4
J1
350
P3
J1
450
P3
SAHRULI ASMAR, ST, MSi
P3
P3
J1
250
P3
SAHRUDIN, S.Ag
1300
P1
150
J1
200
400
1300
50
200P3
150
P3
P2
DRS. SUDIRMAN, S.ST, MSI
P3
100
350
Drs. H. M. AMIN M., M.HI
J1
450
P4
CV. ORIENT ENGINEERING
150
J2
J1
J1
Ir. ABD. BASIT AMIR
J1
J1
100
200
450
250
250
350
100
250
1600
RENC.PERLETAKAN KUSEN
SKALA 1:100
RENCANA
PERLETAKAN KUSEN
5
30
15
30
28
385
4
10
Aluminium Composite Panel
Aluminium Composite Panel
300
130
SAHRULI ASMAR, ST, MSi
220
SAHRUDIN, S.Ag
30
10
3
19
3
10
3
DRS. SUDIRMAN, S.ST, MSI
19
3
10
10
80
54
10 10
80
54
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
10
385
15
19
PINTU UTAMA (P1)
SKALA 1:50
Ir. ABD. BASIT AMIR
5
158
5
PINTU (P2)
SKALA 1: 20
5
55 65
5
15
61
5
5
5
15
9
71
KACA
5 mm
55
39
5
8
9
5
JALUSI (J2)
SKALA 1:50
SAHRULI ASMAR, ST, MSi
KACA
5 mm
KACA
5 mm
275
215
SAHRUDIN, S.Ag
211
210
5
KACA
5 mm
KACA
5 mm
35
5
214
60
60
5
5
15
5
15
5
CV. ORIENT ENGINEERING
JENDELA (J1)
15
84
73
92
PINTU TOILET (P4)
PINTU (P3)
SKALA 1:50
Drs. H. M. AMIN M., M.HI
135
82
5
DRS. SUDIRMAN, S.ST, MSI
SKALA 1:50
CATATAN: PINTU TOILET
TAHAN AIR
SKALA 1:50
Ir. ABD. BASIT AMIR
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
TAMPAK ATAS
SKALA 1:100
TAMPAK ATAS
Reng baja ringan jarak 25 cm
Perletakan Kuda-Kuda
100
100
Lisplank
93
93
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
RENCANA ATAP
SKALA 1:100
RENCANA ATAP
KETERANGAN
SAMBUNGAN
KABEL
1850
100
350
300
LAMPU PIJAR
9 WATT
350
150
350
100
LAMPU SL 20
WATT
250
METERAN
MCB
125
SAKLAR TUNGGAL
125
SAKLAR GANDA
STOP KONTAK
350
450
SAHRULI ASMAR, ST, MSi
250
SAHRUDIN, S.Ag
1300
400
150
200
1300
50
200
150
DRS. SUDIRMAN, S.ST, MSI
100
350
450
CV. ORIENT ENGINEERING
TEMPAT WUDHU
150
125
100
Drs. H. M. AMIN M., M.HI
200
450
Ir. ABD. BASIT AMIR
125
250
250
350
100
250
1600
RENC.INSTALASI LISTRIK
SKALA 1:100
RENCANA
INSTALASI LISTRIK
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
RENCANA GARIS ATAP
SKALA 1:100
RENCANA GARIS ATAP
1850
100
350
300
350
150
KM / WC
-0.05
100
250
125
RUANG
KEPALA KUA
350
RUANG STAFF
RUANG
ARSIP
RUANG
KOMPUTER
125
350
450
150
TERAS
-0.05
RUANG TAMU
RESEPSIONIS
RUANG
PENYULUH
200
1300
KORIDOR
250
MUSOLLAH
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
400
1300
50
200
150
DRS. SUDIRMAN, S.ST, MSI
R. LAMMING
+0.25
RUANG
PENGHULU
R. BALAI NIKAH &
MANASAIK HAJI
PANTRY
KM / WC
-0.05
150
TEMPAT WUDHU
350
TERAS
-0.05
100
125
100
200
450
250
450
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
125
250
350
100
250
1600
LAYOUT FURNITURE
SKALA 1:100
RENCANA RINGBALK
1850
350
300
350
150
RUANG
KEPALA KUA
KM / WC
-0.05
RESEPSIONIS
450
150
TERAS
-0.05
RUANG
PENYULUH
200
1300
250
SAHRULI ASMAR, ST, MSi
KORIDOR
250
MUSOLLAH
350
100
125
RUANG STAFF
RUANG
ARSIP
RUANG
KOMPUTER
125
350
RUANG TAMU
100
400
1300
SAHRUDIN, S.Ag
50
200
150
DRS. SUDIRMAN, S.ST, MSI
R. LAMMING
+0.25
RUANG
PENGHULU
R. BALAI NIKAH &
MANASAIK HAJI
PANTRY
KM / WC
-0.05
150
TEMPAT WUDHU
350
TERAS
-0.05
100
125
100
200
450
250
450
CV. ORIENT ENGINEERING
125
250
Drs. H. M. AMIN M., M.HI
Ir. ABD. BASIT AMIR
350
100
250
1600
RENCANA KABEL LAN DAN TV
SKALA 1:100
RENCANA KABEL
LAN DAN TV
1850
100
350
300
350
150
125
Plafond
kalsiboard
350
350
100
250
125
Plafond
kalsiboard
+ 4.00
+ 4.00
Plafond
kalsiboard
450
+ 4.00
SAHRULI ASMAR, ST, MSi
Plafond
kalsiboard
250
+ 4.00
Plafond
kalsiboard
200
Plafond
kalsiboard
+ 4.00
Plafond
kalsiboard
1300
Rangka Plafond
hollow 44 60 -60
SAHRUDIN, S.Ag
400
+ 4.00
1300
+ 4.00
DRS. SUDIRMAN, S.ST, MSI
350
Plafond
kalsiboard
Plafond
kalsiboard
450
Drs. H. M. AMIN M., M.HI
+ 4.00
+ 4.00
CV. ORIENT ENGINEERING
150
125
100
200
450
Ir. ABD. BASIT AMIR
125
250
250
350
100
250
1600
RENCANA PLAFOND DALAM
SKALA 1:100
RENCANA
PLAFOND DALAM
SAHRULI ASMAR, ST, MSi
as
CROSS RUNNER
FURING CHANNEL
as
MAIN RUNNER
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
DETAIL PLAFOND
SKALA 1:100
DETAIL PLAFOND
1850
100
350
300
Plafond kalsiboard
350
125
150
Plafond kalsiboard
350
100
250
125
350
450
SAHRULI ASMAR, ST, MSi
200
Plafond kalsiboard
1300
Plafond kalsiboard
250
SAHRUDIN, S.Ag
400
1300
DRS. SUDIRMAN, S.ST, MSI
350
450
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
150
Plafond kalsiboard
100
200
450
Plafond kalsiboard
125
250
250
Ir. ABD. BASIT AMIR
125
350
100
250
1600
RENCANA PLAFOND LUAR
SKALA 1:100
RENCANA
PLAFOND LUAR
1850
100
350
300
350
150
125
keramik granit
60x60
350
keramik granit
60x60
keramik
40x40
350
100
250
125
keramik granit
60x60
keramik granit
60x60
450
SAHRULI ASMAR, ST, MSi
keramik granit
60x60
250
keramik granit
60x60
SAHRUDIN, S.Ag
keramik granit
60x60
1300
keramik granit
60x60
200
400
1300
350
TERAS
-0.05
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
TEMPAT WUDHU
150
CV. ORIENT ENGINEERING
keramik
40x40
Ir. ABD. BASIT AMIR
125
100
450
keramik granit
60x60
keramik granit
60x60
200
450
125
250
250
350
100
250
1600
RENC. KERAMIK
SKALA 1:100
Tampak Samping Kanan
Tampak Samping KIRI
SAHRULI ASMAR, ST, MSi
40
80
Kalsiboard T: 3,5mm
+4.00
pipa 2''
SAHRUDIN, S.Ag
450
450
230
460
PLIN LANTAI CAT MINYAK
(WARNA HITAM)
PLIN LANTAI CAT MINYAK
(WARNA HITAM)
DRS. SUDIRMAN, S.ST, MSI
MUSOLLAH
30
30
100
80
Drs. H. M. AMIN M., M.HI
200
350
400
DETAIL POT. PLAT TOILET
CV. ORIENT ENGINEERING
DETAIL PIPA
BUANGAN AIR HUJAN
POTONGAN PLAFOND
Ir. ABD. BASIT AMIR
SKALA 1:50
SKALA 1:50
SKALA 1:50
DETAIL
POT. PLAT TOILET
DETAIL PIPA
BUANGAN AIR HUJAN
POTONGAN PLAFOND
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DET.POT A-A
DET.POT B-B
SKALA 1:30
SKALA 1:30
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
DET.POT C-C
Ir. ABD. BASIT AMIR
SKALA 1:30
SEPTIK TANK
SKALA 1:20
DETAIL SEPTIK TANK
170
20
6
23
6
110
69 81
170
6
40
57
57
70
52
170
SAHRULI ASMAR, ST, MSi
30
TAMPAK S. KANAN
250
SKALA 1:30
DENAH RESEPSIONIS
SKALA 1:30
SAHRUDIN, S.Ag
20
170
DRS. SUDIRMAN, S.ST, MSI
90
90
70
30
29
200
23
23
110
81
69 81
6
CV. ORIENT ENGINEERING
6
6
110
Drs. H. M. AMIN M., M.HI
6
6
110
Ir. ABD. BASIT AMIR
81 69
6
170
55
47
TAMPAK DEPAN
SKALA 1:30
50
250
50
47
TAMPAK S. KIRI
SKALA 1:30
RESEPSIONIS
2000
450
300
500
300
450
KEMENTERIAN AGAMA
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
A
B
TAMPAK DEPAN
SKALA 1:100
450
60
60
36
SAHRULI ASMAR, ST, MSi
40
150
20
60
50
SAHRUDIN, S.Ag
50
A
DETAIL A
DRS. SUDIRMAN, S.ST, MSI
SKALA
1:50
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
20
500
460
20
KERAMIK 40X40
188
36
KEMENTERIAN AGAMA
12
KANTOR URUSAN AGAMA (KUA)
40
20
Ir. ABD. BASIT AMIR
36
KECAMATAN KAHU KABUPATEN BONE
40
15
20
10
60
60
333
269
25
25
565
B
PAGAR DEPAN
DETAIL B
SKALA
1:50
A
B
C
2000
450
300
300
500
450
KEMENTERIAN AGAMA
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
A
C
B
TAMPAK DEPAN
SAHRULI ASMAR, ST, MSi
SKALA 1:100
SAHRUDIN, S.Ag
55
60
19
25
25
25
15
15
DRS. SUDIRMAN, S.ST, MSI
LOGO KUA
30
150 20
60
30
Pagar Besi
150 20
Pasangan 1/2
Batu Bata
30
TANAMAN
HIAS
SLOF 20/20
Pasangan 1
Batu Bata
60
41
150
Drs. H. M. AMIN M., M.HI
95
CV. ORIENT ENGINEERING
30
80
POTONGAN A-A
SKALA 1:50
POTONGAN B-B
SKALA 1:50
30
Ir. ABD. BASIT AMIR
POTONGAN C-C
SKALA 1:50
DETAIL PAGAR DEPAN
350
112
63
63
112
75
45
45
SAHRULI ASMAR, ST, MSi
70
SAHRUDIN, S.Ag
120
BALAI NIKAH DAN MANASIK HAJI
10
KANTOR URUSAN AGAMA (KUA)
13
KECAMATAN KAHU KABUPATEN BONE
10
120
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
187
CV. ORIENT ENGINEERING
210
236
Ir. ABD. BASIT AMIR
DETAIL PAPAN NAMA KANTOR
SKALA 1:100
DETAIL
PAPAN NAMA KANTOR
BALAI NIKAH DAN MANASIK HAJI
PEMBANGUNAN
GEDUNG DAN FASILITAS
BALAI NIKAH DAN MANASIK HAJI
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
LOKASI : KECAMATAN KAHU
CV. ORIENT ENGINEERING
DAFTAR ISI
NAMA GAMBAR
HALAMAN
NAMA GAMBAR
HALAMAN
PETA LOKASI
1
RECANA ATAP
18
SITE PLAN
2
RENC. INSTALASI LISTRIK
19
DENAH lOKASI
3
RECANA GARIS ATAP
20
DENAH
4
LAYOUT FURNITURE
21
RENC. KABEL LAN DAN TV
22
RENCANA PLAFOND DALAM
23
DETAIL PLAFOND
24
RENCANA PLAFOND LUAR
25
26
TAMPAK DEPAN
5
TAMPAK BELAKSNG
TAMPAK SAMPING KANAN
TAMPAK SAMPING KIRI
6
POTONGAN A - A
7
RENCANA KERAMIK
POTONGAN B - B
8
RENCANA PONDASI
9
DETAIL POT. PLAT TOILET
DETAIL PIPABUANGAN AIR HUJAN
POTONGAN PLAFOND
SEPTIK TANK
DETAIL PONDASI BATU KALI
10
RESEPSIONIS
DETAIL POER
27
28
29
RENCANA RINGBALK
11
PAGAR
30
DETAIL PEMBESIAN
12
POTONGAN PAGAR
31
PERLETAKAN KUSEN
13
DETAIL KUSEN PINTU DAN JENDELA
14
DETAIL KUSEN PINTU DAN JENDELA
15
DETAIL KUSEN PINTU DAN JENDELA
16
RENCANA ATAP
17
U
PETA KABUPATEN BONE
B
T
S
KE
C.
CE
NR
AN
A
KEC.AJANGALE
OE
CC
UA
BO
C.D
KE
E
NG
ING
KEC.AMALI
TT
SIA
LU
EL
C.T
KE
KEC.AWANGPO
KA
AK
AL
C.P
KE
KEC.LAMURU
KEC.TAN
RIATTAN ETE
G TIMUR
RIA KEC
TT .TA
AN NE
T
G
BA E
RA
T
KEC.ULAWENG
KEC.TANE
TE
RIATTANG
NE
SAHRULI ASMAR, ST, MSi
PO
E
KEC.BAREBBO
KE
C.T
EL
LU
LIM
KEC.BENGO
KEC.PONRE
KEC.SIBULUE
SAHRUDIN, S.Ag
KEC.CINA
KEC.LAPPARIAJA
KEC. MARE
DRS. SUDIRMAN, S.ST, MSI
KEC.LIBURENG
PETA SULAWESI SELATAN
KEC. TONRA
KEC. PATIMPENG
Luwu Utara
Luwu Timur
Drs. H. M. AMIN M., M.HI
Luwu
KEC. KAHU
Tanah Toraja Utara
KEC. SALOMEKKO
Palopo
CV. ORIENT ENGINEERING
Tanah Toraja
KEC. BONTOCANI
Luwu
Pinrang
KEC. KAJUARA
Pinrang
Sidrap
Wajo
Parepare
Ir. ABD. BASIT AMIR
Soppeng
Barru
Bone
Pangkep
Maros
sar
kas
Ma
PETA LOKASI
Sinjai
Gowa
Takalar
Bulukumba
Bantaeng
Jeneponto
INDEX PETA
PETA LOKASI
JALAN POROS PALATTAE
2000
2480
2690
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
MESJID
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
2350
SITE PLAN
SITE PLAN KUA KAHU
SKALA 1:150
R. BALAI NIKAH &
MANASAIK HAJI
150
R. LAMMING
+0.25
PANTRY
TERAS
-0.05
RUANG
PENYULUH
150
343
243
2350
TERAS
-0.05
RUANG TAMU
RESEPSIONIS
KORIDOR
MUSOLLAH
2480
RUANG
PENGHULU
KM / WC
-0.05
TEMPAT WUDHU
RUANG
KEPALA KUA
RUANG STAFF
KM / WC
-0.05
RUANG
KOMPUTER
RUANG
ARSIP
DENAH LOKASI
2400
725
437
454
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
2000
50
Drs. H. M. AMIN M., M.HI
200
100
350
CV. ORIENT ENGINEERING
590
Ir. ABD. BASIT AMIR
DENAH LOKASI
A
1850
350
300
350
150
125
225
350
100
250
125
RUANG
KEPALA KUA
350
RUANG STAFF
RUANG
ARSIP
RUANG
KOMPUTER
200
KM / WC
-0.05
100
450
200
TERAS
-0.05
150
B
RUANG TAMU
1300
RESEPSIONIS
MUSOLLAH
B
250
KORIDOR
RUANG
PENYULUH
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
400
1300
50
200
150
DRS. SUDIRMAN, S.ST, MSI
R. LAMMING
+0.00
RUANG
PENGHULU
KM / WC
-0.05
125
100
200
450
250
Drs. H. M. AMIN M., M.HI
450
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
125
250
350
100
250
1600
A
150
TEMPAT WUDHU
350
R. BALAI NIKAH &
MANASAIK HAJI
PANTRY
350
TERAS
-0.05
100
DENAH
SKALA 1:100
BALAI NIKAH DAN MANASIK HAJI
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
Tampak Depan
SKALA 1:100
BALAI NIKAH DAN MANASIK HAJI
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
SAHRULI ASMAR, ST, MSi
Tampak Depan
SKALA 1:100
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
Tampak Belakang
SKALA 1:100
Tampak Depan
Tampak Belakang
SAHRULI ASMAR, ST, MSi
Tampak Samping Kanan
SKALA 1:100
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
Tampak Samping Kanan
Tampak Samping KIRI
Tampak Samping KIRI
SKALA 1:100
Genteng Bubungan Multi Roof
Genteng Multi Roof
Kuda-kuda Baja Ringan
Reng Baja Ringan
Nusaplank
850
390
850
345
208
80
200
Kalsiboard T: 3,5mm
SAHRULI ASMAR, ST, MSi
245
130
250
230
Kalsiboard T: 3,5mm
Kalsiboard T: 3,5mm
80
SAHRUDIN, S.Ag
Dinding Finish Cat
Dinding Finish Cat
50
Dinding Finish Cat
450
350
DRS. SUDIRMAN, S.ST, MSI
RUANG STAFF
RUANG PENGHULU
30
Drs. H. M. AMIN M., M.HI
80
125
125
CV. ORIENT ENGINEERING
1550
Ir. ABD. BASIT AMIR
POTONGAN A - A
SKALA 1:100
POTONGAN A - A
802
100
100
100
100
100
100
100
102
Nusaplank
390
500
80
500
Kalsiboard T: 3,5mm
Kalsiboard T: 3,5mm
Kalsiboard T: 3,5mm
SAHRULI ASMAR, ST, MSi
18
80
60
352
SAHRUDIN, S.Ag
40
Dinding Finish Cat
Dinding Finish Cat
Dinding Finish Cat
Dinding Finish Cat
450
DRS. SUDIRMAN, S.ST, MSI
300
MUSOLLAH
KORIDOR
RUANG TAMU
200
TERAS
-0.05
30
60
80
350
1250
250
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
1600
Ir. ABD. BASIT AMIR
POTONGAN B - B
SKALA 1:100
POTONGAN B - B
1850
100
350
300
350
K1
150
S1
350
100
250
K1
Poer
Poer
K3
S1
K1
K1
350
S1
K1
K3
K3
K1
S1
450
K3
K1
S1
S1
K1
SAHRULI ASMAR, ST, MSi
K1
250
S1
S1
K1
S1
K2
SAHRUDIN, S.Ag
K1
1300
400
K1
200
S1
S1
K1
1300
DRS. SUDIRMAN, S.ST, MSI
K1
K1
K1
S1
K1
K1
K1
S1
K1
S1
K1
K2
350
S1
K1
K3
K1
Drs. H. M. AMIN M., M.HI
450
K3
CV. ORIENT ENGINEERING
S1
S1
150
S1
K1
K1
K1
K1
Poer
Poer
S1
K1
Ir. ABD. BASIT AMIR
K3
100
200
K3
450
250
250
350
100
250
1600
RENCANA PONDASI
RENCANA PONDASI
SKALA 1:100
15
PLIN LANTAI CAT MINYAK
(WARNA HITAM)
30
PASANGAN 1/2 BATU BATA
SLOF 20/30
150
PONDASI BATU KALI
30
30
10
SAHRULI ASMAR, ST, MSi
20
30
20
18
60
11
20
SAHRUDIN, S.Ag
25
80
60
TANAH URUG
DRS. SUDIRMAN, S.ST, MSI
20
5
60
BATU KOSONG
PASIR URUG
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
60
60
Ir. ABD. BASIT AMIR
DETAIL POER
25
SKALA 1:20
60
DETAIL PONDASI BATU KALI 1
SKALA 1:20
DETAIL PONDASI BATU
KALI & DETAIL POER
1850
350
300
350
150
350
100
250
RB 15 X 20
125
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
400
1300
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
350
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
200
450
SAHRULI ASMAR, ST, MSi
RB 15 X 20
1300
RB 15 X 20
250
RB 15 X 20
RB 15 X 20
RB 15 X 20
RB 15 X 20
350
125
450
CV. ORIENT ENGINEERING
150
RB 15 X 20
450
RB 15 X 20
RB 15 X 20
RB 15 X 20
125
200
Drs. H. M. AMIN M., M.HI
125
RB 15 X 20
250
250
Ir. ABD. BASIT AMIR
350
100
250
1600
RENCANA RINGBALK
SKALA 1:100
RENCANA RINGBALK
15
30
30
15
30
15
SAHRULI ASMAR, ST, MSi
DETAIL (K1)
SKALA 1:20
DETAIL (K2)
SKALA 1:20
DETAIL (K3)
SKALA 1:20
SAHRUDIN, S.Ag
20
15
30
DRS. SUDIRMAN, S.ST, MSI
20
Drs. H. M. AMIN M., M.HI
DETAIL SLOOP
SKALA 1:20
DET. RINGBALK
SKALA 1:20
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
DETAIL PEMBESIAN
1850
100
350
300
125
J1
350
150
J1
J2
J1
350
100
250
125
J1
P4
J1
350
P3
J1
450
P3
SAHRULI ASMAR, ST, MSi
P3
P3
J1
250
P3
SAHRUDIN, S.Ag
1300
P1
150
J1
200
400
1300
50
200P3
150
P3
P2
DRS. SUDIRMAN, S.ST, MSI
P3
100
350
Drs. H. M. AMIN M., M.HI
J1
450
P4
CV. ORIENT ENGINEERING
150
J2
J1
J1
Ir. ABD. BASIT AMIR
J1
J1
100
200
450
250
250
350
100
250
1600
RENC.PERLETAKAN KUSEN
SKALA 1:100
RENCANA
PERLETAKAN KUSEN
5
30
15
30
28
385
4
10
Aluminium Composite Panel
Aluminium Composite Panel
300
130
SAHRULI ASMAR, ST, MSi
220
SAHRUDIN, S.Ag
30
10
3
19
3
10
3
DRS. SUDIRMAN, S.ST, MSI
19
3
10
10
80
54
10 10
80
54
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
10
385
15
19
PINTU UTAMA (P1)
SKALA 1:50
Ir. ABD. BASIT AMIR
5
158
5
PINTU (P2)
SKALA 1: 20
5
55 65
5
15
61
5
5
5
15
9
71
KACA
5 mm
55
39
5
8
9
5
JALUSI (J2)
SKALA 1:50
SAHRULI ASMAR, ST, MSi
KACA
5 mm
KACA
5 mm
275
215
SAHRUDIN, S.Ag
211
210
5
KACA
5 mm
KACA
5 mm
35
5
214
60
60
5
5
15
5
15
5
CV. ORIENT ENGINEERING
JENDELA (J1)
15
84
73
92
PINTU TOILET (P4)
PINTU (P3)
SKALA 1:50
Drs. H. M. AMIN M., M.HI
135
82
5
DRS. SUDIRMAN, S.ST, MSI
SKALA 1:50
CATATAN: PINTU TOILET
TAHAN AIR
SKALA 1:50
Ir. ABD. BASIT AMIR
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
TAMPAK ATAS
SKALA 1:100
TAMPAK ATAS
Reng baja ringan jarak 25 cm
Perletakan Kuda-Kuda
100
100
Lisplank
93
93
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
RENCANA ATAP
SKALA 1:100
RENCANA ATAP
KETERANGAN
SAMBUNGAN
KABEL
1850
100
350
300
LAMPU PIJAR
9 WATT
350
150
350
100
LAMPU SL 20
WATT
250
METERAN
MCB
125
SAKLAR TUNGGAL
125
SAKLAR GANDA
STOP KONTAK
350
450
SAHRULI ASMAR, ST, MSi
250
SAHRUDIN, S.Ag
1300
400
150
200
1300
50
200
150
DRS. SUDIRMAN, S.ST, MSI
100
350
450
CV. ORIENT ENGINEERING
TEMPAT WUDHU
150
125
100
Drs. H. M. AMIN M., M.HI
200
450
Ir. ABD. BASIT AMIR
125
250
250
350
100
250
1600
RENC.INSTALASI LISTRIK
SKALA 1:100
RENCANA
INSTALASI LISTRIK
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
RENCANA GARIS ATAP
SKALA 1:100
RENCANA GARIS ATAP
1850
100
350
300
350
150
KM / WC
-0.05
100
250
125
RUANG
KEPALA KUA
350
RUANG STAFF
RUANG
ARSIP
RUANG
KOMPUTER
125
350
450
150
TERAS
-0.05
RUANG TAMU
RESEPSIONIS
RUANG
PENYULUH
200
1300
KORIDOR
250
MUSOLLAH
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
400
1300
50
200
150
DRS. SUDIRMAN, S.ST, MSI
R. LAMMING
+0.25
RUANG
PENGHULU
R. BALAI NIKAH &
MANASAIK HAJI
PANTRY
KM / WC
-0.05
150
TEMPAT WUDHU
350
TERAS
-0.05
100
125
100
200
450
250
450
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
125
250
350
100
250
1600
LAYOUT FURNITURE
SKALA 1:100
RENCANA RINGBALK
1850
350
300
350
150
RUANG
KEPALA KUA
KM / WC
-0.05
RESEPSIONIS
450
150
TERAS
-0.05
RUANG
PENYULUH
200
1300
250
SAHRULI ASMAR, ST, MSi
KORIDOR
250
MUSOLLAH
350
100
125
RUANG STAFF
RUANG
ARSIP
RUANG
KOMPUTER
125
350
RUANG TAMU
100
400
1300
SAHRUDIN, S.Ag
50
200
150
DRS. SUDIRMAN, S.ST, MSI
R. LAMMING
+0.25
RUANG
PENGHULU
R. BALAI NIKAH &
MANASAIK HAJI
PANTRY
KM / WC
-0.05
150
TEMPAT WUDHU
350
TERAS
-0.05
100
125
100
200
450
250
450
CV. ORIENT ENGINEERING
125
250
Drs. H. M. AMIN M., M.HI
Ir. ABD. BASIT AMIR
350
100
250
1600
RENCANA KABEL LAN DAN TV
SKALA 1:100
RENCANA KABEL
LAN DAN TV
1850
100
350
300
350
150
125
Plafond
kalsiboard
350
350
100
250
125
Plafond
kalsiboard
+ 4.00
+ 4.00
Plafond
kalsiboard
450
+ 4.00
SAHRULI ASMAR, ST, MSi
Plafond
kalsiboard
250
+ 4.00
Plafond
kalsiboard
200
Plafond
kalsiboard
+ 4.00
Plafond
kalsiboard
1300
Rangka Plafond
hollow 44 60 -60
SAHRUDIN, S.Ag
400
+ 4.00
1300
+ 4.00
DRS. SUDIRMAN, S.ST, MSI
350
Plafond
kalsiboard
Plafond
kalsiboard
450
Drs. H. M. AMIN M., M.HI
+ 4.00
+ 4.00
CV. ORIENT ENGINEERING
150
125
100
200
450
Ir. ABD. BASIT AMIR
125
250
250
350
100
250
1600
RENCANA PLAFOND DALAM
SKALA 1:100
RENCANA
PLAFOND DALAM
SAHRULI ASMAR, ST, MSi
as
CROSS RUNNER
FURING CHANNEL
as
MAIN RUNNER
SAHRUDIN, S.Ag
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
Ir. ABD. BASIT AMIR
DETAIL PLAFOND
SKALA 1:100
DETAIL PLAFOND
1850
100
350
300
Plafond kalsiboard
350
125
150
Plafond kalsiboard
350
100
250
125
350
450
SAHRULI ASMAR, ST, MSi
200
Plafond kalsiboard
1300
Plafond kalsiboard
250
SAHRUDIN, S.Ag
400
1300
DRS. SUDIRMAN, S.ST, MSI
350
450
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
150
Plafond kalsiboard
100
200
450
Plafond kalsiboard
125
250
250
Ir. ABD. BASIT AMIR
125
350
100
250
1600
RENCANA PLAFOND LUAR
SKALA 1:100
RENCANA
PLAFOND LUAR
1850
100
350
300
350
150
125
keramik granit
60x60
350
keramik granit
60x60
keramik
40x40
350
100
250
125
keramik granit
60x60
keramik granit
60x60
450
SAHRULI ASMAR, ST, MSi
keramik granit
60x60
250
keramik granit
60x60
SAHRUDIN, S.Ag
keramik granit
60x60
1300
keramik granit
60x60
200
400
1300
350
TERAS
-0.05
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
TEMPAT WUDHU
150
CV. ORIENT ENGINEERING
keramik
40x40
Ir. ABD. BASIT AMIR
125
100
450
keramik granit
60x60
keramik granit
60x60
200
450
125
250
250
350
100
250
1600
RENC. KERAMIK
SKALA 1:100
Tampak Samping Kanan
Tampak Samping KIRI
SAHRULI ASMAR, ST, MSi
40
80
Kalsiboard T: 3,5mm
+4.00
pipa 2''
SAHRUDIN, S.Ag
450
450
230
460
PLIN LANTAI CAT MINYAK
(WARNA HITAM)
PLIN LANTAI CAT MINYAK
(WARNA HITAM)
DRS. SUDIRMAN, S.ST, MSI
MUSOLLAH
30
30
100
80
Drs. H. M. AMIN M., M.HI
200
350
400
DETAIL POT. PLAT TOILET
CV. ORIENT ENGINEERING
DETAIL PIPA
BUANGAN AIR HUJAN
POTONGAN PLAFOND
Ir. ABD. BASIT AMIR
SKALA 1:50
SKALA 1:50
SKALA 1:50
DETAIL
POT. PLAT TOILET
DETAIL PIPA
BUANGAN AIR HUJAN
POTONGAN PLAFOND
SAHRULI ASMAR, ST, MSi
SAHRUDIN, S.Ag
DET.POT A-A
DET.POT B-B
SKALA 1:30
SKALA 1:30
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
DET.POT C-C
Ir. ABD. BASIT AMIR
SKALA 1:30
SEPTIK TANK
SKALA 1:20
DETAIL SEPTIK TANK
170
20
6
23
6
110
69 81
170
6
40
57
57
70
52
170
SAHRULI ASMAR, ST, MSi
30
TAMPAK S. KANAN
250
SKALA 1:30
DENAH RESEPSIONIS
SKALA 1:30
SAHRUDIN, S.Ag
20
170
DRS. SUDIRMAN, S.ST, MSI
90
90
70
30
29
200
23
23
110
81
69 81
6
CV. ORIENT ENGINEERING
6
6
110
Drs. H. M. AMIN M., M.HI
6
6
110
Ir. ABD. BASIT AMIR
81 69
6
170
55
47
TAMPAK DEPAN
SKALA 1:30
50
250
50
47
TAMPAK S. KIRI
SKALA 1:30
RESEPSIONIS
2000
450
300
500
300
450
KEMENTERIAN AGAMA
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
A
B
TAMPAK DEPAN
SKALA 1:100
450
60
60
36
SAHRULI ASMAR, ST, MSi
40
150
20
60
50
SAHRUDIN, S.Ag
50
A
DETAIL A
DRS. SUDIRMAN, S.ST, MSI
SKALA
1:50
Drs. H. M. AMIN M., M.HI
CV. ORIENT ENGINEERING
20
500
460
20
KERAMIK 40X40
188
36
KEMENTERIAN AGAMA
12
KANTOR URUSAN AGAMA (KUA)
40
20
Ir. ABD. BASIT AMIR
36
KECAMATAN KAHU KABUPATEN BONE
40
15
20
10
60
60
333
269
25
25
565
B
PAGAR DEPAN
DETAIL B
SKALA
1:50
A
B
C
2000
450
300
300
500
450
KEMENTERIAN AGAMA
KANTOR URUSAN AGAMA (KUA)
KECAMATAN KAHU KABUPATEN BONE
A
C
B
TAMPAK DEPAN
SAHRULI ASMAR, ST, MSi
SKALA 1:100
SAHRUDIN, S.Ag
55
60
19
25
25
25
15
15
DRS. SUDIRMAN, S.ST, MSI
LOGO KUA
30
150 20
60
30
Pagar Besi
150 20
Pasangan 1/2
Batu Bata
30
TANAMAN
HIAS
SLOF 20/20
Pasangan 1
Batu Bata
60
41
150
Drs. H. M. AMIN M., M.HI
95
CV. ORIENT ENGINEERING
30
80
POTONGAN A-A
SKALA 1:50
POTONGAN B-B
SKALA 1:50
30
Ir. ABD. BASIT AMIR
POTONGAN C-C
SKALA 1:50
DETAIL PAGAR DEPAN
350
112
63
63
112
75
45
45
SAHRULI ASMAR, ST, MSi
70
SAHRUDIN, S.Ag
120
BALAI NIKAH DAN MANASIK HAJI
10
KANTOR URUSAN AGAMA (KUA)
13
KECAMATAN KAHU KABUPATEN BONE
10
120
DRS. SUDIRMAN, S.ST, MSI
Drs. H. M. AMIN M., M.HI
187
CV. ORIENT ENGINEERING
210
236
Ir. ABD. BASIT AMIR
DETAIL PAPAN NAMA KANTOR
SKALA 1:100
DETAIL
PAPAN NAMA KANTOR