REFERENCES Analysing Cost Implications Of Building Design Variables As Areas Of Modelling To Achieve Value For Money A Study on Selected Buildings in Surakarta and Surrounding Areas.

REFERENCES
Aeroboe, M. B. (1995). Energy management strategies for facility managers, SA
Refrigeration and Air-conditioning, 11(1), 43–53.
Al., Q. in I. et. (2015). Nigerian building and Road Research Institute (NABRRI)
(1989).
Al-Asfoor, M. D. (1993). Computerized Conceptual Cost-Estimating System for
Domestic Water Supply Projects, unpublished thesis. King Fahd University
of Petroleum and Minerals, Dhahran, Saudi Arabia.
Allsopp, K. (1983)Journal Vol. 177(4), pp. 29. (n.d.). An Architects View,
architects.
Al-Momani, A. H. (1996). Construction cost prediction for public school
buildings in Jordan. Construction Management Economics, 14, 311–317.
Anastasia, M. Nancy, Y.N. Ricky, K. Beni, T. (2012). Korelasi bentuk, struktur
dan konstruksi pada bangunan bentang besar dengan struktur membran
(studi kasus: convention center yayasan pendidikan telkom, bandung).
Ashworth, A. & H. (2004). Willis’ Practice and Procedure Quantity Surveyors.
Blackwell Science Ltd.
Ashworth, A. and Skitmore, R. M. (1983). Accuracy in Estimating. The Chartered
Institute of Building.
Baxter, A. (1983). Buildability: A Structural Engineer’s View,. Architects’
Journal, 177(5), pp.30.

Beeston, D. T. (1987). A future for cost modelling. Building cost Modelling and
Computers. P.S. Brandon, E & FN Spon , 15–24.
Bojic, M., Yik, F., Wan, K. and Burnett, J. (2002). Influence of envelope and
partition.
Bozai, G. A. (1981). Regression Analysis Models for Preliminary Cost Estimating
in Highway Construction, unpublished thesis presented in partial fulfillment
for the degree of Master of Science. NED University of Engineering and
Technology, Pakistan.
C. Gray, W. H. (2001). Building Design Management. Butterworth-Heinemann,
Boston, MA,.
Carroll. (1982). Mechanical and Electrical Services Elements,.
Cartlidge, D. (2013). Quantity Surveyor‟s Pocketbook (2nd ed.). Oxford.:
Elsevier.
Charleson, A. W. (2005). Structure as Architecture. . Oxford: Architectural Press.
Chasey, A. D. & Schexneyder, A. M. (2000). Constructability: The key to
reducing investment risk. AACE International Transactions, RI3A.
Chau, Wong, Y. and Y. (2007). (n.d.). Determining optimal building height.
Urban Studies, 44(3), 591–607.

133


Cheung, F. (2005). -Development and Testing of a Method for Forecasting Prices
of Multi-Storey Buildings during the Early Desing Stage: the Storey
Enclosure Method Revisited. PhD Thesis. Queensland University of
Technology (Australia).
CIRIA. (1983). Buildability: An Assessment.
CIRIA (1983). (1983). Buildability: An Assessment.
Clark, W. and Kingston, J. (1930). The Skyscraper: A Study in the Economic
Height of Modern Office Buildings. American Institute of Steel Construction,
New York.
Coombs, M. (1983). Buildability: A Delegate’s View. Architects Journal, 177(5
April), 47.
Cunningham, T. (2013). Factors Affecting The Cost of Building Work -. In An
Overview. Dublin Institute of Technology.
Cyon Research. (2003). The building information model: A look at Graphisoft’s
virtual building concept. Retrieved from
http://www.wbh.com/WhitePapers/Graphisoft_Virtual_Building_Modela_Cyon_Research_White_Paper_030102.pdf#search=%22fragmented
construction% 20%22BIM%22%22.
Department of the Environment (1971). (n.d.). Local Authority Offices: Areas and
Costs. London.

Eastman, C. M. (1999). Building Product Models: Computer Environments
Supporting Devopment Construction . CRC Press. New York: CRC Press.
Eldeen, T. A. M. S. (1996). Budget Estimating Models for the Construction Cost
of Public School Buildings in Saudi Arabia, unpublished thesis . King Fahd
University of Petroleum and Minerals, Dhahran, Saudi Arabia.
Ellen, L. and K. S. Y. (2007). A Study of the Economic Value of High-rise Office
Buildings in China Strategic Integration of Surveying Services. In FIG
Working Week 2007. Hong Kong SAR, China.
Ellis, M. W. (1996). Practical evaluation and integrated simulation of building
HVAC system performance. University of Pretoria.
Establishment, B. R. (1970). Building Research Establishment Digest 64 soils and
foundation 3HMSO.
Etuka. (1989). Engineering Practice in Nigeria, in the millennium, The Abuja
Engineers. A Publication of Nigeria Association of Engineers., 2(3), 295–
302.
Ezetah. (1999). Developing local materials for building use. In A paper presented
at Housing Corporation in Nigeria, workshop. Abuja.
Ferry, D. and Brandon, P. S. (1991). Cost Planning of Buildings. Oxford:
Blackwell Scientific Publications.
Ferry, D., Brandon, P., and Ferry, J. (1999). Cost Planning of Buildings, (7th

Editio). Blackwell Science.
134

Flanagan, R. and N. G. (1978). The relationship between construction price and
height. Chartered Surveyor Building and Quantity Surveying Quarterly, 5(4),
68–71.
Fortune, C. and Hinks, J. (1998). Strategic building project price forecasting
models in use – paradigm shift postponed. Journal of Financial Management
of Property and Construction , 3(1), 3–26.
Fortune, C. and Lees, M. (1994). The relative performance of new and traditional
cost models in strategic advice and clients,. The Royal Institution of
Chartered Surveyors.
Fortune, C., Lees, M. (1996). The relative performance of new and traditional cost
models in strategic advice and clients. The Royal Institution of Chartered
Surveyors.
Frampton, K. (1995). Studies in Tectonic Culture: The Poetics of Construction in
Nineteenth and Twentieth Century Architecture . Massachusetts Institute of
Technology.
Frick, H. (1998). Sistem Bentuk Struktur Bangunan: Dasar-dasar konstruksi
dalam Arsitektur. Yogyakarta:Kanisius.

Horner, M. and Zakieh, R. (1996). Characteristic items – a new approach to
pricing and controlling construction projects. Construction Management
Economics, 14, 241–252.
Ibrahim, A. . (2004). Application of Regression Analysis for Assessing the Effect
of Variation in Building Plan Shape on Unit Construction Cost. Samaru
Journal of Information Studies, 4(2), 20 –26.
Ibrahim, A. D. (2007). Effect of changes in Building Layout on the unit
construction cost of Residential Building. Quantity Surveying Section, 7(1).
Ibrahim, S, Alumbugu, P. O, Abdul Azeez, A, Wasiu, A. (2015). Assessment of
the Effect of Plan Shapes on Cost of Institutional Buildings in Nigeria,.
International Refereed Journal of Engineering and Science (IRJES) ISSN,
Volume 4(Issue 3 (March 2015)), 39–50.
Illingworth, J. R. (1984). (1984). Buildability, Concrete, August, pp. 10–11.
J., A. S. (1985). Long-Range Forecasting: From Crystal Ball to Computer (2 nd
ed.). New York: John Wiley & Sons Inc.
J.F., M. (1988). Design productivity: A quality problem. Journal of Management
Engineering ASCE , 4(4), 350–362.
Jagger, J. S. and D. (2007). Building cost planning for the design team (2nd ed.).
Amsterdam : Elsevier Butterwworth-Heinemann.
Johan, Johny, dan L. D. (1998). Analisis Penerapan Value Engineering pada

Proses Perencanaan/Desain Sub Struktur Bangunan Apartemen di Jakarta”.
Jurnal Teknik Sipil Fakultas Teknik, No. 1 Tahu.
Jong, P. de., Oss, S.C.F. van. and Wamelink, J. W. F. (2007). High rise ability, In
Brebbia, C. A. et al. (Eds.), Earthquake Resistant Engineering Structures VI.
WIT Press, Southampton.
135

Kim, G. H. Yoon, J. E. An, s. H. Cho, H. H. and Kang, K. I. (2004). Neural
network model incorpating a genetic algorithm in estimating construction
costs. Building and Environment, 39(11), 1330–1340.
Kirkham, R. (2007). Ferry and Brandon’s Cost Planning of Buildings (8 th ed.).
Oxford.: Blackwell Publishing.
Kosonen, R., and Shemeika, J. (1997). The use of a simple simulation tool for
energy analysis. Proceedings of the Fifth International IBPSA Conference,
Prague, Czech Republic, 2 ., 369–376.
Kouskoulas, V and Koehn, E. (1974). (1974). Predesign Cost-Estimation Function
for Buildings. Journal of the Construction Division ASCE, 100(12), 589–604.
Kozy, B. and S, T. (2007). Stability Analysis and Bracing for System Buckling in
Twin i-Girder B bridge Structures: Assessement,. Besign and Construction,
Volume 3(No. 3-4 Routledge Journals), pp 149–163.

Landow, G. P. A. (2000). A Ruskin quotation? Retrieved from
http://www.victorianweb.org/ authors/ruskin/quotation.html (accessed 20
July 2015).
Langston, G. (2002). A New Era in Cost Planning. In Rick, B and Gerald, D
(2002) (eds) Design and Construction: Building in Value . Oxford:
Butterworth Heinemann.
Lawson, B. (2006). How designers think. (4th editio). Oxford: Elsevier.
Lee, Y. (2005). The relationship between height and cost of building. Retrieved
August 1, 2015, from http://www.archren.com/archly
Lowe, D J, Emsley, M W and Harding, A. (2007). Relationships between total
construction cost and design related variables. Journal of Financial
Management of Property and Construction , 12(1), 11–23. Retrieved from
https://www.escholar.manchester.ac.uk
MacDonald, A. J. (2001). Struktur & Arsitektur, terjemahan. Dr. Ir. Pariatmono
dan Ir.
Mahendra, R. (2006). Studi Value Engineering dengan Metode Initial Cost dalam
Rangka Usaha Penghematan Biaya Proyek Konstruksi . Universitas
Indonesia, Jakarta.
Mao, W., Zhu, Y. and Irtishad, A. (2007). Applying metadata models to
unstructured content of construction documents: a view-based approach.

Automation in Construction, 16, 242–52.
Mark and Halliburton. (1972). Soil Science. Journal of Soil Mechanic and
Foundation (ASCE), 4(3), 327–339.
Maver, T. (1970). “A Theory of Architectural Design in which the Role of the
Computer is Identified.” Building Science, 4, 199–207.
Maver, T. (1979). Cost Performance Modelling, . Chartered Quantity Surveyor ,
2: , 11–15.
Meiss, P. van. (1990). Elements of Architecture: From Form to Place. Presses
Polytechniques Romandes.
136

Moore, P. (1988). Working along the right lines, .
Morton, R. & Jagger, D. (1995). (1995). Design and the Economics of Building.
Spon Press.
Newton, S. (. (1982). Cost modeling: a tentative specification, in Brandon, P. S.
(eds) Building Cost Techniques: New Directions. London: E&FN Spon.
Palmer, A., Kelly, J., and Male, S. (1996). Holistic Appraisal of Value
Engineering in Construction in United States. Journal. Construction. Eng.
Management., 10 ,(1061), 324–328.
Pena. W. and Parshell, S. A. (2001). Problem seeking: an architectural

programming primer. (4th ed.). New York: Wiley.
Peter F, K. dan E. B. P. (2013). Penerapan Value Engineering (ve) oleh
Kontraktor dan Konsultan Indonesia. In Konferensi Nasional Teknik Sipil 7
(KoNTekS 7) Universitas Sebelas Maret (UNS), 24-26 Oktober . Surakarta.
Picken, D. H. and I. B. D. (2003). Height and construction costs of buildings in
Hong Kong. Construction Management and Economics,21 (2), pp.107–111.
Plebankiewicz, K. and Zima, E. (2012). Analysis of the building shape erected in
Krakow and its impact on organization, technology and management in
construction. An International Journal, 4(1).
Priyatno, H. (2010). Pengoptimalan Value Engineering pada Tahap Desain
Bangunan Gedung di Indonesia . Universitas Indonesia Depok.
Ranasinghe, M. (1996). Total project cost: a simplified model for decision
makers. Construction Management Economics, 14, 497–505.
Renata, S. H. (2014). ISO/DIS 15686-5 (2006), Life Cycle Cost optimization
within decision making on alternative designs,. In Creative Construction
Conference.
Renata Schneiderova Heralova. (2014). Life Cycle Cost optimization within
decision making on alternative designs Czech Technical University in
Prague. In Czech Republic. Creative Construction Conference. Faculty of
Civil Engineering, Thakurova 7. 166 29 Prague 6.

RIBA. (2013). RIBA Plan of Work: Retrieved July 6, 2015, from www.a4a.sk/
RIBA-outline.htm
Rochmanhadi. (1992). Teknik Penilaian Disain (Value Engineering), Yayasan
Gema Aproteknika, Semarang .
S, A. Z. A. (2005). Cost Implications of Architectural design Variables.
Saleem A., Andrzej M., Bartosz K., A. M. and P. N. (2011). Value Management
(Online) The original manual was published in 2011. Retrieved August 24,
2015, from
(http://www.designingbuildings.co.uk/wiki/Value_management_in_building
_design_and_construction
Schodek, D. L. (1999). Struktur, edisi kedua, terjemahan oleh. Ir. Bambang
Suryoatmono, (edisi kedu).
Schueller, W. (1986). High-rise Building Structures. Robert Krieger, Malabar .
137

Seeley, I. H. (1983). Building Economics: Appraisal and Control of Building
Design Cost and Efficience (3rd ed.). Macmillan.
Seeley, I. H. (1996). Building Economics. London.: Macmillan.
Seeley, I. H. (1997). Building Economics. (Shittu A.A; A.D Adamu and M.A.
Shehu(2013)., Ed.) (5th editio). The Macmillan press Ltd London.

Seeley, I. H. (1999). Building Economics,. London: Macmillan.
Shittu A.A, A. . A. and M. A. S. (2013). Cost Modelling of Mechanical and
Electrical Services in Institutional Building Projects in Lagos State of
Nigeria.
Sir Stuart Lipton, C. C. (2001). Improving Standards of Design in the
Procurement of Public Buildings (CABE/OGC).
Skitmore, R.M. and Marston, V. K. (1999). Cost Modelling. London: E & FN
Spon.
Skoyles, T. (1985). The Quantity Surveyor. (8 (3) ed.). London.
Staedman, P., Evans, S. and Batty, M. (2009). Wall area, volume and plan depth
in the building stock. Building Research & Information , 37(5), 455 – 467.
Steyert, R. S. (1972). The economics of high rise apartment buildings of alternate
design construction, U.S.A. American Society of Civil Engineers.
Swaffield, L.M. and Pasquire, C. L. (1996). A critique of mechanical and
electrical services cost planning: existing methods and published
information,. Journal of Financial Management of Property and
Construction, 1(3), 23–41.
Tan, W. (1999). Construction cost and building height, Construction.
Management Economics, 17, 129–132.
Thomsen, C. (1966). How high to rise. Appraisal Journal, 34(4), 585–91.
Tregenza, P. (1972). Association between building height and cost. Architects
Journal, November , 1031–2.
Turner, G. R. (1986). Construction Economics and Building Design: A Historical
Approach. Van Nostrand Reinhold Company, New York.
v. (2015). Retrieved July 8, 2015, from
www.designingbuildings.co.uk/wiki/Value_in_building
design_and_construction
Warszawski, A. (2003). Analysis of Costs and Benefits of Tall Buildings,. Journal
of Construction Engineering and Management, 129(4), 421–430.
Williams, T. P. (2002). Predicting completed cost using bidding data,.
Construction Management Economics, 20, 225–235.
Wing, C. K. (1999). “On the issue of plan shape complexity: plan shape indices
revisited.” Construction Management and Economic, 17, 473–482.
Zainuddin H. (1997.). CONPLAN: Construction planning and buildability
evaluation in an integrated and intelligent construction environment. T.I.M.E
138

Research Institute Department of Surveying University of Salford, Salford,
UK Submitted in Partial Fulfilment for the Degree of D.
Zima. (2008). “Influence of building shape on the construction cost”, Scientific
Papers of the Institute of Building Engineering of the Wrocław University of
Technology No. 91, series: Studies and Materials No. 20. Technology and
Management in Construction, Wrocław (in Polish)., pp. 155–162.

139