LAMP UND CV. INDO KONSTRUKSI

DAFTAR HARGA SATUAN PEKERJAAN YANG TIMPANG

PERUSAHAAN
NO

I

II

IV

V

VI

VII

: CV. INDO KONSTRUKSI
URAIAN PEKERJAAN

SATUAN


HARGA
SATUAN
PENAWARAN

PERIMBANGAN
HARGA
(%)

KET

PEKERJAAN PENDAHULUAN
4. Pemasangan Bowplank
5. Lansiran Material

m2
Set

34,439.68
69,375,419.94


143.83
114.35

Timpang
Timpang

PEKERJAAN TANAH
1. Galian Tanah
2. Tanah Datang CBR 10%

m3
m3

75,735.00
288,000.00

125.17
470.20


Timpang
Timpang

PEKERJAAN BETON BERTULANG
1. Beton K - 225 ( Manual ) Slum, 12 + 2cm
2. Bekisting

m3
m2

1,832,640.18
232,373.24

127.09
128.81

Timpang
Timpang

PEKERJAAN DEWATERING

1. Kisdam ( Tinggi 1,5 M )

m'

502,831.45

113.19

Timpang

PEKERJAAN PINTU AIR
1.Pintu Ulir lebar 80 x 100 cm (t max 1 m)
2.Pintu Ulir lebar 60 x 70 cm (t max 1 m)
3.Pintu Ulir lebar 60 x 100 cm (t max 1 m)

unit
unit
unit

8,500,000.00

7,000,000.00
7,500,000.00

170.00
155.56
166.67

Timpang
Timpang
Timpang

PEKERJAAN LAIN-LAIN
1.Penanda Bangunan

unit

400,000.00

200.00


Timpang