LAMP UND CV. INDO KONSTRUKSI
DAFTAR HARGA SATUAN PEKERJAAN YANG TIMPANG
PERUSAHAAN
NO
I
II
IV
V
VI
VII
: CV. INDO KONSTRUKSI
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
PENAWARAN
PERIMBANGAN
HARGA
(%)
KET
PEKERJAAN PENDAHULUAN
4. Pemasangan Bowplank
5. Lansiran Material
m2
Set
34,439.68
69,375,419.94
143.83
114.35
Timpang
Timpang
PEKERJAAN TANAH
1. Galian Tanah
2. Tanah Datang CBR 10%
m3
m3
75,735.00
288,000.00
125.17
470.20
Timpang
Timpang
PEKERJAAN BETON BERTULANG
1. Beton K - 225 ( Manual ) Slum, 12 + 2cm
2. Bekisting
m3
m2
1,832,640.18
232,373.24
127.09
128.81
Timpang
Timpang
PEKERJAAN DEWATERING
1. Kisdam ( Tinggi 1,5 M )
m'
502,831.45
113.19
Timpang
PEKERJAAN PINTU AIR
1.Pintu Ulir lebar 80 x 100 cm (t max 1 m)
2.Pintu Ulir lebar 60 x 70 cm (t max 1 m)
3.Pintu Ulir lebar 60 x 100 cm (t max 1 m)
unit
unit
unit
8,500,000.00
7,000,000.00
7,500,000.00
170.00
155.56
166.67
Timpang
Timpang
Timpang
PEKERJAAN LAIN-LAIN
1.Penanda Bangunan
unit
400,000.00
200.00
Timpang
PERUSAHAAN
NO
I
II
IV
V
VI
VII
: CV. INDO KONSTRUKSI
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
PENAWARAN
PERIMBANGAN
HARGA
(%)
KET
PEKERJAAN PENDAHULUAN
4. Pemasangan Bowplank
5. Lansiran Material
m2
Set
34,439.68
69,375,419.94
143.83
114.35
Timpang
Timpang
PEKERJAAN TANAH
1. Galian Tanah
2. Tanah Datang CBR 10%
m3
m3
75,735.00
288,000.00
125.17
470.20
Timpang
Timpang
PEKERJAAN BETON BERTULANG
1. Beton K - 225 ( Manual ) Slum, 12 + 2cm
2. Bekisting
m3
m2
1,832,640.18
232,373.24
127.09
128.81
Timpang
Timpang
PEKERJAAN DEWATERING
1. Kisdam ( Tinggi 1,5 M )
m'
502,831.45
113.19
Timpang
PEKERJAAN PINTU AIR
1.Pintu Ulir lebar 80 x 100 cm (t max 1 m)
2.Pintu Ulir lebar 60 x 70 cm (t max 1 m)
3.Pintu Ulir lebar 60 x 100 cm (t max 1 m)
unit
unit
unit
8,500,000.00
7,000,000.00
7,500,000.00
170.00
155.56
166.67
Timpang
Timpang
Timpang
PEKERJAAN LAIN-LAIN
1.Penanda Bangunan
unit
400,000.00
200.00
Timpang