KOREKSI PEMEL. BERKALA JALAN MOPUSI MENGKANG

TABEL KOREKSI ARITMATIK
KEGIATAN

:

REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN

:

PEMELIHARAAN BERKALA JALAN MOPUSI - MENGKANG

LOKASI

:

KECAMATAN LOLAYAN
HPS

No. Mata

Pembayaran

Uraian

Satuan

Kuantitas

Harga
Satuan
(Rupiah)

DIVISI 1. UMUM
1.2

Mobilisasi

CV. TRI UTAMA ABADI
Jumlah
Harga-harga

(Rupiah)

Harga
Satuan
(Rupiah)

16,812,000.00
Ls

1.00

16,812,000.00

16,812,000.00

CV. NIRWARNA KARYA
Harga
Satuan
(Rupiah)


27,450,000.00
27,450,000.00

205,861,424.04

DIVISI 2. DRAINASE

Jumlah
Harga-harga
(Rupiah)

27,450,000.00

Jumlah
Harga-harga
(Rupiah)

CV. SINAR MOKIKIT
Harga
Satuan

(Rupiah)

28,900,000.00
28,900,000.00

208,820,625.83

28,900,000.00

Jumlah
Harga-harga
(Rupiah)
29,345,000.00

29,345,000.00

209,867,655.12

29,345,000.00
209,867,655.12


2.1

Galian untuk Selokan Drainase dan Saluran Air

M

3

37.00

53,453.53

1,977,780.61

60,810.32

2,249,981.84

60,888.12


2,252,860.44

60,888.12

2,252,860.44

2.2

Pasangan Batu dengan Mortar

M

3

276.34

737,799.97

203,883,643.43


747,523.50

206,570,643.99

751,302.00

207,614,794.68

751,302.00

207,614,794.68

40,733,172.10

DIVISI 3. PEKERJAAN TANAH

27,868,909.59

27,887,430.43


27,887,430.43

3.1.1

Galian Biasa

M

3

33.00

57,052.50

1,882,732.50

55,560.12

1,833,483.96


55,638.75

1,836,078.75

55,638.75

1,836,078.75

3.2.2

Timbunan Biasa

M

3

131.62

289,567.60


38,112,887.51

182,110.33

23,969,361.63

182,216.22

23,983,298.88

182,216.22

23,983,298.88

Pembersihan dan Pengupasan Lahan

M

2


352.00

2,095.32

737,552.09

5,869.50

2,066,064.00

5,875.15

2,068,052.80

5,875.15

2,068,052.80

3.3

388,722,976.58

DIVISI 5. PERKERASAN BERBUTIR

339,842,537.40

338,083,814.10

338,083,814.10

5.1.1

Lapis Pondasi Agregat Kelas A

M

3

410.00

747,096.24

306,309,457.96

612,767.02

251,234,478.20

609,446.29

249,872,978.90

609,446.29

249,872,978.90

5.1.2

Lapis Pondasi Agregat Kelas B

M

3

80.00

653,749.01

52,299,921.02

573,546.05

45,883,684.00

570,200.54

45,616,043.20

570,200.54

45,616,043.20

5.2.1

Lapis Pondasi Agregat Kelas C

M

3

80.00

376,419.97

30,113,597.60

534,054.69

42,724,375.20

532,434.90

42,594,792.00

532,434.90

42,594,792.00

600,588,011.25

DIVISI 6. PERKERASAN ASPAL
6.1 (1) (a)
6.3(6a)

659,550,540.48

659,608,699.53

659,811,559.53

Lapis Resap Pengikat - Aspal Cair

Liter

2,310.00

9,589.57

22,151,907.80

14,798.10

34,183,611.00

14,863.50

34,334,685.00

14,863.50

34,334,685.00

Laston Lapis Antara (AC-BC) (gradasi halus/kasar)

Ton

507.15

581,636.17

294,976,782.55

608,630.06

308,666,734.93

604,035.70

306,336,705.26

604,035.70

306,336,705.26

6.3.8.a

Aspal Minyak

Ton

27.89

9,570,000.00

266,938,402.50

10,575,579.30

294,987,277.31

10,648,509.30

297,021,532.03

10,648,509.30

297,021,532.03

6.3.10a

Bahan Pengisi (Filler) Tambahan (Semen)

Kg

10,143.00

1,300.00

13,185,900.00

1,380.68

14,004,237.24

1,380.68

14,004,237.24

1,380.68

14,004,237.24

6.4.(6)

Bahan Anti Pengelupasan (anti stripping agent)

81.14

41,100.00

3,335,018.40

95,000.00

7,708,680.00

97,500.00

7,911,540.00

100,000.00

Liter

110,919,211.35

DIVISI 7. STRUKTUR

98,162,789.42

98,544,295.76

8,114,400.00
98,544,295.76

7.1 (7)

Beton mutu sedang dengan fc’= 20 MPa (K-250)

M

3

5.40

2,281,390.08

12,319,506.44

1,184,239.37

6,394,892.60

1,185,648.35

6,402,501.09

1,185,648.35

6,402,501.09

7.1 (8)

Beton mutu rendah dengan fc’= 15 MPa (K-175)

M

3

1.80

1,384,056.01

2,491,300.82

1,041,947.43

1,875,505.37

1,043,367.66

1,878,061.79

1,043,367.66

1,878,061.79

7.3 (1)
7.9

Baja Tulangan BJ 24 Polos

Kg

729.00

15,891.70

11,585,049.30

21,659.69

15,789,914.01

21,683.75

15,807,453.75

21,683.75

15,807,453.75

Pasangan Batu

M

3

101.16

835,542.10

84,523,354.79

732,528.18

74,102,477.44

736,025.63

74,456,279.13

736,025.63

74,456,279.13

Jumlah
PPN 10%
JUMLAH + PPN

Dibulatkan
Penawaran :
Selisih Koreksi

1,363,636,795.32

1,361,695,402.72

1,362,891,894.93

136,363,679.53

136,169,540.27

136,289,189.49

136,353,975.49

1,500,000,474.85

1,497,864,942.99

1,499,181,084.42

1,499,893,730.42

1,500,000,000.00

1,497,864,000.00

1,499,181,000.00

1,499,893,000.00

1,497,826,000.00

1,499,142,000.00

1,499,855,000.00

38,000.00

39,000.00

38,000.00

Lolak,
April 2013
POKJA JASA KONSTRUKSI

1,363,539,754.93