No. PU Plot number
Jenis kanal Type of canal
Panjang Length m
Volume m
3
Waktu, Jam
Time, hour
Produktivitas, mjam
Productivity,m hour
Biaya Cost Rpm
1. PT WKS Jambi
250 m x 978,8 m Kisaran Range
Kanal primerMain
5,40-9,70 170,10-305,55
0,25-0,25 21,60-38,80
12.840-23.065 250 m x 500 m
Kisaran Range Kanal
primerMain 5,90-9,80
185,85-308,70 0,25-0,25
23,60-39,20 12.709-21.110
250m x 750 m Kisaran Range
Kanal primerMain
5,50-9,70 173,25-305,55
0,25-0,25 22,00-38,80
12.840-22.645 250 m x 978,8 m
Kisaran Range Kanal sekunder
Secondary canal 6,20-9,80
120,90-191,10 0,25-0,25
24,80-39,20 12.709-20.089
250 m x 250 m Kisaran Range
Kanal sekunder Secondary canal
6,10-9,60 118,95-187,20
0,25-0,25 24,40-38,40
12.974-20.418 250 m x 500 m
Kanal sekunder Kisaran Range
Secondary canal 6,10-9,90
118,95-193,05 0,25-0,25
24,40-39,60 12.581-20.418
250 m x 750 m Kisaran Range
Rata-rataMean Kanal
sekunder Secondary canal
6,80-10,20 8,32
214,20-321,30 262,08
0,25-0,25 0,25
27,20-40,80 33,28
12.211-18.316 15.120
250 m x 978,8 m Kisaran Range
Kanal tersier Tertiary canal
9,20-14,80 27,60-44,40
0,25-0,25 36,80-59,20
5.465-8.791 250 m x 500 m
Kisaran Range Kanal tersier
Tertiary canal 10,10-15,70
30,30-47,10 0,25-0,25
40,40-62,80 5.152-8.000
250 m x 250 m Kisaran Range
Kanal tersier Tertiary canal
9,50-15,40 28,50-46,20
0,25-0,25 38,00-61,60
5.252-8.514 250 m x 750 m
Kisaran Range Kanal tersier
Tertiary canal 9,20-17,50
27,60-52,50 0,25-0,25
36,80-70,00 4.622-8.791
2. PT RAPP Riau
400 m x 750 m Kisaran Range
Kanal sekunder Secondary canal
4,30-9,10 116,10-245,70
0,25-0,25 17,20-36,40
12.038-25.477 250 m x 250 m
Kisaran Range
Kanal sekunder Secondary canal
4,20-8,90 113,40-240,30
0,25-0,25 16,80-35,60
12.309-26.083 250m x 500 m
Kisaran Range
Kanal sekunder Secondary canal
4,50-8,90 121,50-240,30
0,25-0,25 18,00-35,60
12.309-24.344 250 m x 750 m
Kisaran Range
Kanal sekunder Secondary canal
5,20-8,90 140,40-240,30
0,25-0,25 20,80-35,60
12.309-21.067 400 m x 750 m
Kisaran Range Cross drain canal
89,10-107,00 111,37-133,75
0,25-0,25 356,40-428,00
756-908 250 m x 250 m
Kisaran Range Cross drain canal
89,30-108,00 111,62-135,00
0,25-0,25 357,20-432,00
749-906 250m x 500 m
Kisaran Range Cross drain canal
89,90-107,00 112,37-133,75
0,25-0,25 359,60-428,00
756-900 250 m x 750 m
Kisaran Range Cross drain canal
89,70-104,00 112,12-130,00
0,25-0,25 358,80-416,00
778-902 400 m x 750 m
Kisaran Range Mid drain canal
18,10-29,30 22,62-36,62
0,25-0,25 72,40-117,20
2.760-4.469 250 m x 250 m
Kisaran Range Mid drain canal
18,20-29,60 22,75-37,00
0,25-0,25 72,80-118,40
2.732-4.444 206
Tabel 6. Produktivitas dan biaya pemeliharaanpembuatan kanal di HTI Jambi dan Riau Table 6. Productivity and cost of canal maintenanceestablishment at timber estate in Jambi
and Riau
No. PU Plot number
Jenis kanal Type of canal
Panjang Length m
Volume m
3
Waktu, Jam
Time, hour
Produktivitas, mjam
Productivity,m hour
Biaya Cost Rpm
250m x 500 m Kisaran Range
Mid drain canal 19,20-29,70
28,87-37,12 0,25-0,25
76,80-118,80 2.732-4.213
250 m x 750 m Kisaran Range
Mid drain canal 19,10-29,80
23,87-37,25 0,25-0,25
76,40-119,20 2.714-4.235
400 m x 750 m Kisaran Range
Infield drain canal
30,00-39,80 30,00-39,80
0,25-0,25 120,00-159,20
2.032-2.696 250 m x 250 m
Infield drain
Tabel 6. Lanjutan Table 6. Continued
Kisaran Range canal
31,00 41,30 31,00 41,30
0,25 0,25 124,00 165,20
1.958 2.609 -
- -
- -
250m x 500 Infield drain
m Kisaran Range
canal 30,00 41,30
30,00 41,30 0,25 0,25
120,00 165,20 1.958 2.696
- -
- -
- 250 m x 750
Infield drain m
Kisaran Range canal
31,30 41,40 31,30 41,40
0,25 0,25 125,20 165,60
1.954 2.584 -
- -
- -
Rata rataMean 35,43
35,43 0,25
142,13 2.290
-
branch cross
drain mid drain
infeld drain Dari Tabel 6 menunjukkan bahwa rata-rata
produktivitas kanal primer, tersier dan kanal sekunder pada petak tebang 250m x 750m di
PT WKS Jambi lebih tinggi daripada petak tebang lain masing-masing sebesar 29,84, 54,12 dan
33,28 mjam dengan biaya kanal primer, tersier dan sekunder juga lebih rendah daripada petak
tebang lainnya masing-masing sebesar Rp 16.978m, Rp 6.122m dan Rp 15.120m.
Tingginya produktivitas dan rendahnya biaya kanal sekunder pada petak tebang 250m x 750m
mengindikasikan bahwa pada petak tersebut untuk pelaksanaan pemeliharaan kanal lebih baik
daripada petak tebang lainnya. Hal ini sama dengan kegiatan penyaradan dari hasil penelitian
ini. Dengan tingginya rata-rata produktivitas penyaradan dan rendahnya rata-rata biaya
penyaradan, ukuran petak tebang tersebut merupakan ukuran petak tebang yang paling
efisien dalam kegiatan penyaradan. Berdasarkan aspek teknis berupa produktivitas kanal dan aspek
biaya maka petak tebang yang paling efisien adalah petak
dengan ukuran 250m x 750 m. Di PT RAPP Riau juga menunjukkan hal yang sama yaitu
dengan ukuran petak tebang 250m x 750m diperoleh rata-rata produktivitas
kanal, dan
serta lebih tinggi
dengan rata-rata biaya kanal lebih rendah.
D. Petak Tebang Optimal