PT RAPP Riau Produktivitas dan Biaya Pemeliharaan Pembuatan Kanal

No. PU Plot number Jenis kanal Type of canal Panjang Length m Volume m 3 Waktu, Jam Time, hour Produktivitas, mjam Productivity,m hour Biaya Cost Rpm

1. PT WKS Jambi

250 m x 978,8 m Kisaran Range Kanal primerMain 5,40-9,70 170,10-305,55 0,25-0,25 21,60-38,80 12.840-23.065 250 m x 500 m Kisaran Range Kanal primerMain 5,90-9,80 185,85-308,70 0,25-0,25 23,60-39,20 12.709-21.110 250m x 750 m Kisaran Range Kanal primerMain 5,50-9,70 173,25-305,55 0,25-0,25 22,00-38,80 12.840-22.645 250 m x 978,8 m Kisaran Range Kanal sekunder Secondary canal 6,20-9,80 120,90-191,10 0,25-0,25 24,80-39,20 12.709-20.089 250 m x 250 m Kisaran Range Kanal sekunder Secondary canal 6,10-9,60 118,95-187,20 0,25-0,25 24,40-38,40 12.974-20.418 250 m x 500 m Kanal sekunder Kisaran Range Secondary canal 6,10-9,90 118,95-193,05 0,25-0,25 24,40-39,60 12.581-20.418 250 m x 750 m Kisaran Range Rata-rataMean Kanal sekunder Secondary canal 6,80-10,20 8,32 214,20-321,30 262,08 0,25-0,25 0,25 27,20-40,80 33,28 12.211-18.316 15.120 250 m x 978,8 m Kisaran Range Kanal tersier Tertiary canal 9,20-14,80 27,60-44,40 0,25-0,25 36,80-59,20 5.465-8.791 250 m x 500 m Kisaran Range Kanal tersier Tertiary canal 10,10-15,70 30,30-47,10 0,25-0,25 40,40-62,80 5.152-8.000 250 m x 250 m Kisaran Range Kanal tersier Tertiary canal 9,50-15,40 28,50-46,20 0,25-0,25 38,00-61,60 5.252-8.514 250 m x 750 m Kisaran Range Kanal tersier Tertiary canal 9,20-17,50 27,60-52,50 0,25-0,25 36,80-70,00 4.622-8.791

2. PT RAPP Riau

400 m x 750 m Kisaran Range Kanal sekunder Secondary canal 4,30-9,10 116,10-245,70 0,25-0,25 17,20-36,40 12.038-25.477 250 m x 250 m Kisaran Range Kanal sekunder Secondary canal 4,20-8,90 113,40-240,30 0,25-0,25 16,80-35,60 12.309-26.083 250m x 500 m Kisaran Range Kanal sekunder Secondary canal 4,50-8,90 121,50-240,30 0,25-0,25 18,00-35,60 12.309-24.344 250 m x 750 m Kisaran Range Kanal sekunder Secondary canal 5,20-8,90 140,40-240,30 0,25-0,25 20,80-35,60 12.309-21.067 400 m x 750 m Kisaran Range Cross drain canal 89,10-107,00 111,37-133,75 0,25-0,25 356,40-428,00 756-908 250 m x 250 m Kisaran Range Cross drain canal 89,30-108,00 111,62-135,00 0,25-0,25 357,20-432,00 749-906 250m x 500 m Kisaran Range Cross drain canal 89,90-107,00 112,37-133,75 0,25-0,25 359,60-428,00 756-900 250 m x 750 m Kisaran Range Cross drain canal 89,70-104,00 112,12-130,00 0,25-0,25 358,80-416,00 778-902 400 m x 750 m Kisaran Range Mid drain canal 18,10-29,30 22,62-36,62 0,25-0,25 72,40-117,20 2.760-4.469 250 m x 250 m Kisaran Range Mid drain canal 18,20-29,60 22,75-37,00 0,25-0,25 72,80-118,40 2.732-4.444 206 Tabel 6. Produktivitas dan biaya pemeliharaanpembuatan kanal di HTI Jambi dan Riau Table 6. Productivity and cost of canal maintenanceestablishment at timber estate in Jambi and Riau No. PU Plot number Jenis kanal Type of canal Panjang Length m Volume m 3 Waktu, Jam Time, hour Produktivitas, mjam Productivity,m hour Biaya Cost Rpm 250m x 500 m Kisaran Range Mid drain canal 19,20-29,70 28,87-37,12 0,25-0,25 76,80-118,80 2.732-4.213 250 m x 750 m Kisaran Range Mid drain canal 19,10-29,80 23,87-37,25 0,25-0,25 76,40-119,20 2.714-4.235 400 m x 750 m Kisaran Range Infield drain canal 30,00-39,80 30,00-39,80 0,25-0,25 120,00-159,20 2.032-2.696 250 m x 250 m Infield drain Tabel 6. Lanjutan Table 6. Continued Kisaran Range canal 31,00 41,30 31,00 41,30 0,25 0,25 124,00 165,20 1.958 2.609 - - - - - 250m x 500 Infield drain m Kisaran Range canal 30,00 41,30 30,00 41,30 0,25 0,25 120,00 165,20 1.958 2.696 - - - - - 250 m x 750 Infield drain m Kisaran Range canal 31,30 41,40 31,30 41,40 0,25 0,25 125,20 165,60 1.954 2.584 - - - - - Rata rataMean 35,43 35,43 0,25 142,13 2.290 - branch cross drain mid drain infeld drain Dari Tabel 6 menunjukkan bahwa rata-rata produktivitas kanal primer, tersier dan kanal sekunder pada petak tebang 250m x 750m di PT WKS Jambi lebih tinggi daripada petak tebang lain masing-masing sebesar 29,84, 54,12 dan 33,28 mjam dengan biaya kanal primer, tersier dan sekunder juga lebih rendah daripada petak tebang lainnya masing-masing sebesar Rp 16.978m, Rp 6.122m dan Rp 15.120m. Tingginya produktivitas dan rendahnya biaya kanal sekunder pada petak tebang 250m x 750m mengindikasikan bahwa pada petak tersebut untuk pelaksanaan pemeliharaan kanal lebih baik daripada petak tebang lainnya. Hal ini sama dengan kegiatan penyaradan dari hasil penelitian ini. Dengan tingginya rata-rata produktivitas penyaradan dan rendahnya rata-rata biaya penyaradan, ukuran petak tebang tersebut merupakan ukuran petak tebang yang paling efisien dalam kegiatan penyaradan. Berdasarkan aspek teknis berupa produktivitas kanal dan aspek biaya maka petak tebang yang paling efisien adalah petak dengan ukuran 250m x 750 m. Di PT RAPP Riau juga menunjukkan hal yang sama yaitu dengan ukuran petak tebang 250m x 750m diperoleh rata-rata produktivitas kanal, dan serta lebih tinggi dengan rata-rata biaya kanal lebih rendah.

D. Petak Tebang Optimal