KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU
PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG
LOKASI : DESA LABEAN, DUSUN III MAPAGA
TAHUN ANGGARAN : 2012
HARGA SATUAN JUMLAH HARGA
Rp Rp
I. PEKERJAAN PERSIAPAN
1 Pengukuran Pemasangan Bouwplank
1.000 Ls
500,000.00 500,000.00
2 Papan Nama Proyek
1.000 Ls
250,000.00 250,000.00
750,000.00 I.
PEKERJAAN JEMBATAN PENGHUBUNG LEBAR 4 M
1 Pek. Tiang kayu 15 x 15 cm; Lrata-rata = 4 m
18.000 Bh
348,560.00 6,274,080.00
2 Pek. Tiang kayu 15 x 15 cm; Lrata-rata = 7.5 m
18.000 Bh
614,560.00 11,062,080.00
3 Pek. Lantai Papan, Tebal 5 cm
96.000 M²
171,525.00 16,466,400.00
4 Pek. Gelagar Induk, Gelagar Lantai dan Scor Angin
6.980 M³
4,444,700.00 31,024,006.00
5 Pemasangan Baut dan mur Ø 12 mm
300.000 Set
7,000.00 2,100,000.00
66,926,566.00 II.
PEKERJAAN TAMBATAN PERAHU LEBAR 6 M
1 Pek. Tiang kayu 20 x 20 cm
66.000 Bh
1,253,516.00 82,732,056.00
2 Pek. Lantai Papan, Tebal 5 cm
120.000 M²
171,525.00 20,583,000.00
3 Pek. Gelagar Induk, Gelagar Lantai dan Scor Angin
18.325 M³
4,444,700.00 81,449,543.08
4 Pemas. Baut dan mur Ø 12 mm
704.000 Set
7,000.00 4,928,000.00
189,692,599.08 III.
PEKERJAAN JALAN AKSES SEPANJANG 10 M
1 Pek. Galian tanah Talud
13.650 M³
18,000.00 245,700.00
2 Pek. Urugan pasir bawah talud
1.050 M³
108,500.00 113,925.00
3 Pek. Urugan tasirtu
34.150 M³
119,250.00 4,072,444.74
4 Pas. Baru Kosong
4.200 M³
244,830.00 1,028,286.00
5 Pek. Pas. Batu Kali
13.410 M³
537,020.00 7,201,438.20
6 Pek. Cor jalan beton 1pc : 3Ps : 5 Kr
3.330 M³
624,055.12 2,078,103.55
7 Pek. Siar
11.500 M³
27,724.80 318,835.20
15,058,732.69 IV.
PEKERJAAN FINISHING
1 Pembersihan Akhir
1.000 Ls
300,000.00 300,000.00
300,000.00 NO.
URAIAN PEKERJAAN VOLUME
SA- TUAN
BILL OF QUANTITY BOQ
KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU
PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG
LOKASI : DESA LABEAN, DUSUN III MAPAGA
TAHUN ANGGARAN : 2012
10 M Pekerjaan Pengukuran dan Pemasangan Bowplank 0.001 M³
Kayu 57 kelas III Rp.
1,300,000.00 = Rp.
1,560.00 0.020 Kg
Paku biasa 2 - 5 Rp.
18,000.00 = Rp.
360.00 0.007 M³
Papan ukuran 230 kelas III Rp.
1,300,000.00 = Rp.
9,100.00 0.100 Oh
Pekerja Rp.
40,000.00 = Rp.
4,000.00 0.100 Oh
Tukang Rp.
65,000.00 = Rp.
6,500.00 0.010 Oh
Kepala Tukang Rp.
70,000.00 = Rp.
700.00 0.005 Oh
Mandor Rp.
50,000.00 = Rp.
250.00 = Rp.
22,470.00
Untuk 1 m
= Rp. 2,247.00
1 M³ Galian tanah biasa sedalam 1 m 0.400 Oh Pembantu tukang
Rp. 40,000.00
= Rp. 16,000.00
Oh Tukang gali Rp.
65,000.00 = Rp.
- Oh Kepala tukang
Rp. 70,000.00
= Rp. -
0.040 Oh Mandor Rp.
50,000.00 = Rp.
2,000.00 Rp.
18,000.00 1 M³ Urugan kembali tanah galian
0.192 Oh Pembantu tukang Rp.
40,000.00 = Rp.
7,680.00 Oh Tukang gali
Rp. 65,000.00
= Rp. -
Oh Kepala tukang Rp.
70,000.00 = Rp.
- 0.019 Oh Mandor
Rp. 50,000.00
= Rp. 950.00
Rp. 8,630.00
1 M³ Urugan Pasir 1.200 M
3
Pasir urug Rp.
80,000.00 = Rp.
96,000.00 0.300 Oh Pembantu tukang
Rp. 40,000.00
= Rp. 12,000.00
Oh Tukang gali Rp.
65,000.00 = Rp.
- Oh Kepala tukang
Rp. 70,000.00
= Rp. -
0.010 Oh Mandor Rp.
50,000.00 = Rp.
500.00 Rp.
108,500.00 1 M³ Urugan Sirtu
1.200 M
3
Sirtu Rp.
90,000.00 = Rp.
108,000.00 0.250 Oh Pembantu tukang
Rp. 40,000.00
= Rp. 10,000.00
Oh Tukang Rp.
65,000.00 = Rp.
- Oh Kepala tukang
Rp. 70,000.00
= Rp. -
0.025 Oh Mandor Rp.
50,000.00 = Rp.
1,250.00 Rp.
119,250.00 1 M³ Pasang pondasi batu kali 1 Pc : 4 Psr
1.100 M
3
Batu belah 1520 cm Rp.
133,000.00 = Rp.
146,300.00 0.520 M
3
Pasir pasang Rp.
110,000.00 = Rp.
57,200.00 163.000 Kg Semen portland
Rp. 1,390.00
= Rp. 226,570.00
1.500 Org Pekerja Rp.
40,000.00 = Rp.
60,000.00 0.600 Org Tukang batu
Rp. 65,000.00
= Rp. 39,000.00
0.060 Org Kepala tukang Rp.
70,000.00 = Rp.
4,200.00 0.075 Org Mandor
Rp. 50,000.00
= Rp. 3,750.00
Rp. 537,020.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
BOQ TambatanAnalisa
1 M³ Pasang pondasi batu kosong 1.200 M
3
Batu belah 1520 cm Rp.
133,000.00 = Rp.
159,600.00 0.300 M
3
Pasir urug Rp.
80,000.00 = Rp.
24,000.00 0.780 Org Pekerja
Rp. 40,000.00
= Rp. 31,200.00
0.390 Org Tukang batu Rp.
65,000.00 = Rp.
25,350.00 0.039 Org Kepala tukang
Rp. 70,000.00
= Rp. 2,730.00
0.039 Org Mandor Rp.
50,000.00 = Rp.
1,950.00 Rp.
244,830.00 1 M² Plesteran, 1 Pc : 2 Ps tebal 15 mm
8.520 Kg Semen portland Rp.
1,390.00 = Rp.
11,842.80 0.017 M
3
Pasir pasang Rp.
110,000.00 = Rp.
1,870.00 0.200 Oh Pembantu tukang
Rp. 40,000.00
= Rp. 8,000.00
0.150 Oh Tukang batu Rp.
65,000.00 = Rp.
9,750.00 0.015 Oh Kepala tukang
Rp. 70,000.00
= Rp. 1,050.00
0.010 Oh Mandor Rp.
50,000.00 = Rp.
500.00 Rp.
33,012.80 1 M² Plesteran, 1 Pc : 5 Ps tebal 15 mm
4.320 Kg Semen portland Rp.
1,390.00 = Rp.
6,004.80 0.022 M
3
Pasir pasang Rp.
110,000.00 = Rp.
2,420.00 0.200 Oh Pembantu tukang
Rp. 40,000.00
= Rp. 8,000.00
0.150 Oh Tukang batu Rp.
65,000.00 = Rp.
9,750.00 0.015 Oh Kepala tukang
Rp. 70,000.00
= Rp. 1,050.00
0.010 Oh Mandor Rp.
50,000.00 = Rp.
500.00 Rp.
27,724.80 1 M² Acian plesteran
0.520 Kg Semen Pc Rp.
1,390.00 = Rp.
722.80 0.038 Oh Pembantu tukang
Rp. 40,000.00
= Rp. 1,520.00
0.075 Oh Tukang batu Rp.
65,000.00 = Rp.
4,875.00 0.008 Oh Kepala tukang
Rp. 70,000.00
= Rp. 525.00
0.002 Oh Mandor Rp.
50,000.00 = Rp.
95.00 = Rp.
7,737.80 1 M³ Membuat beton fc 9,8 Mpa K
125
276.000 Kg Semen portland Rp.
1,390.00 = Rp.
383,640.00 828.000 Kg Pasir beton
Rp. 85.71
= Rp. 70,967.88
1012.000 Kg Kerikil Rp.
78.52 = Rp.
79,462.24 1.650 Org Pekerja
Rp. 40,000.00
= Rp. 66,000.00
0.275 Org Tukang batu Rp.
65,000.00 = Rp.
17,875.00 0.028 Org Kepala tukang
Rp. 70,000.00
= Rp. 1,960.00
0.083 Org Mandor Rp.
50,000.00 = Rp.
4,150.00 Rp.
624,055.12 1 Bh Tiang Kayu Uk. 15 x 15 x 400 cm Dipancangkan Sedalam 1,0 Meter
4.000 M Kayu ukuran 15 x 15 cm
Rp. 76,000.00
= Rp. 304,000.00
1.000 Set Alat bantu pancang
Rp. 15,000.00
= Rp. 15,000.00
0.645 Oh Pekerja
Rp. 40,000.00
= Rp. 25,800.00
0.030 Oh Tukang Kayu
Rp. 65,000.00
= Rp. 1,950.00
0.003 Oh Kepala Tukang
Rp. 70,000.00
= Rp. 210.00
0.032 Oh Mandor
Rp. 50,000.00
= Rp. 1,600.00
= Rp. 348,560.00
BOQ TambatanAnalisa
1 Bh Tiang Kayu Uk. 15 x 15 x 750 cm Dipancangkan Sedalam 1,0 Meter 7.500 M
Kayu ukuran 15 x 15 cm Rp.
76,000.00 = Rp.
570,000.00 1.000 Set
Alat bantu pancang Rp.
15,000.00 = Rp.
15,000.00 0.645 Oh
Pekerja Rp.
40,000.00 = Rp.
25,800.00 0.030 Oh
Tukang Kayu Rp.
65,000.00 = Rp.
1,950.00 0.003 Oh
Kepala Tukang Rp.
70,000.00 = Rp.
210.00 0.032 Oh
Mandor Rp.
50,000.00 = Rp.
1,600.00 = Rp.
614,560.00 1 Bh Tiang Kayu Uk. 20 x 20 x 1000 cm Dipancangkan Sedalam 1,5 Meter
9.000 M Kayu ukuran 20 x 20 cm
Rp. 134,000.00
= Rp. 1,206,000.00
1.000 Set Alat bantu pancang
Rp. 15,000.00
= Rp. 15,000.00
0.710 Oh Pekerja
Rp. 40,000.00
= Rp. 28,380.00
0.033 Oh Tukang Kayu
Rp. 65,000.00
= Rp. 2,145.00
0.003 Oh Kepala Tukang
Rp. 70,000.00
= Rp. 231.00
0.035 Oh Mandor
Rp. 50,000.00
= Rp. 1,760.00
= Rp. 1,253,516.00
1 M² Lantai Papan Tebal 5 cm 0.055 M³
Kayu Klas II, Papan Rp.
2,450,000.00 = Rp.
134,750.00 0.400 Kg
Paku Biasa Rp.
18,000.00 = Rp.
7,200.00 0.133 Oh
Pekerja Rp.
40,000.00 = Rp.
5,320.00 0.333 Oh
Tukang Kayu Rp.
65,000.00 = Rp.
21,645.00 0.033 Oh
Kepala Tukang Rp.
70,000.00 = Rp.
2,310.00 0.006 Oh
Mandor Rp.
50,000.00 = Rp.
300.00 = Rp.
171,525.00 1 M³ Balok Gelagar, Sandaran Skor Angin
1.100 M³ Kayu klas I, Balok
Rp. 3,350,000.00
= Rp. 3,685,000.00
0.400 Kg Paku Biasa
Rp. 18,000.00
= Rp. 7,200.00
5.000 Oh Pekerja
Rp. 40,000.00
= Rp. 200,000.00
7.500 Oh Tukang Kayu
Rp. 65,000.00
= Rp. 487,500.00
0.750 Oh Kepala Tukang
Rp. 70,000.00
= Rp. 52,500.00
0.250 Oh Mandor
Rp. 50,000.00
= Rp. 12,500.00
= Rp. 4,444,700.00
BOQ TambatanAnalisa
DAFTAR HARGA SATUAN UPAH
KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU
PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG
LOKASI : DESA LABEAN, DUSUN III MAPAGA
TAHUN ANGGARAN : 2012
NO. SATUAN
VOLUME UPAH
Rp. KETERANGAN
1 Mandor
Orang - Hari 50,000.00
2 Pekerja
Orang - Hari 40,000.00
3 Kepala Tukang Gali
Orang - Hari 70,000.00
4 Tukang Batu
Orang - Hari 65,000.00
5 Kepala Tukang Batu
Orang - Hari 70,000.00
6 Tukang Kayu
Orang - Hari 65,000.00
7 Kepala Tukang Kayu
Orang - Hari 70,000.00
8 Tukang Besi
Orang - Hari 65,000.00
9 Kepala Tukang Besi
Orang - Hari 70,000.00
10 Tukang Cat
Orang - Hari 65,000.00
11 Kepala Tukang Cat
Orang - Hari 70,000.00
12 Tukang Listrik
Orang - Hari 65,000.00
13 Kepala Tukang Listrik
Orang - Hari 70,000.00
14 Laden Tukang
Orang - Hari 35,000.00
15 Tukang Pipa
Orang - Hari 65,000.00
16 Kepala Tukang Pipa
Orang - Hari 70,000.00
17 Operator
Orang - Hari 80,000.00
18 Sopir
Orang - Hari 45,000.00
19 Penjaga Malam
Orang - Hari 35,000.00
U R A I A N
DAFTAR HARGA SATUAN PERALATAN
KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU
PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG
LOKASI : DESA LABEAN, DUSUN III MAPAGA
TAHUN ANGG. : 2012
HARGA NO.
SATUAN SATUAN
KETERANGAN
Rp. 1
Vibrator Concrete Jam
35,000.00 2
Stamper Jam
65,000.00 3
Wheel loader Jam
385,000.00 4
Tandem Roller Jam
315,000.00 5
Dump Truck Jam
250,000.00 6
Water Tank Truck Jam
225,000.00 7
Pan Pencampur Latasir Jam
50,000.00 JENIS PERALATAN
DAFTAR HARGA SATUAN BAHAN
KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU
PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG
LOKASI : DESA LABEAN, DUSUN III MAPAGA
TAHUN ANGGARAN : 2012
I. Batu Pecah Manual