PEKERJAAN PERSIAPAN LPSE Kabupaten Donggala BOQ Tambatan

KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG LOKASI : DESA LABEAN, DUSUN III MAPAGA TAHUN ANGGARAN : 2012 HARGA SATUAN JUMLAH HARGA Rp Rp

I. PEKERJAAN PERSIAPAN

1 Pengukuran Pemasangan Bouwplank 1.000 Ls 500,000.00 500,000.00 2 Papan Nama Proyek 1.000 Ls 250,000.00 250,000.00 750,000.00 I. PEKERJAAN JEMBATAN PENGHUBUNG LEBAR 4 M 1 Pek. Tiang kayu 15 x 15 cm; Lrata-rata = 4 m 18.000 Bh 348,560.00 6,274,080.00 2 Pek. Tiang kayu 15 x 15 cm; Lrata-rata = 7.5 m 18.000 Bh 614,560.00 11,062,080.00 3 Pek. Lantai Papan, Tebal 5 cm 96.000 M² 171,525.00 16,466,400.00 4 Pek. Gelagar Induk, Gelagar Lantai dan Scor Angin 6.980 M³ 4,444,700.00 31,024,006.00 5 Pemasangan Baut dan mur Ø 12 mm 300.000 Set 7,000.00 2,100,000.00 66,926,566.00 II. PEKERJAAN TAMBATAN PERAHU LEBAR 6 M 1 Pek. Tiang kayu 20 x 20 cm 66.000 Bh 1,253,516.00 82,732,056.00 2 Pek. Lantai Papan, Tebal 5 cm 120.000 M² 171,525.00 20,583,000.00 3 Pek. Gelagar Induk, Gelagar Lantai dan Scor Angin 18.325 M³ 4,444,700.00 81,449,543.08 4 Pemas. Baut dan mur Ø 12 mm 704.000 Set 7,000.00 4,928,000.00 189,692,599.08 III. PEKERJAAN JALAN AKSES SEPANJANG 10 M 1 Pek. Galian tanah Talud 13.650 M³ 18,000.00 245,700.00 2 Pek. Urugan pasir bawah talud 1.050 M³ 108,500.00 113,925.00 3 Pek. Urugan tasirtu 34.150 M³ 119,250.00 4,072,444.74 4 Pas. Baru Kosong 4.200 M³ 244,830.00 1,028,286.00 5 Pek. Pas. Batu Kali 13.410 M³ 537,020.00 7,201,438.20 6 Pek. Cor jalan beton 1pc : 3Ps : 5 Kr 3.330 M³ 624,055.12 2,078,103.55 7 Pek. Siar 11.500 M³ 27,724.80 318,835.20 15,058,732.69 IV. PEKERJAAN FINISHING 1 Pembersihan Akhir 1.000 Ls 300,000.00 300,000.00 300,000.00 NO. URAIAN PEKERJAAN VOLUME SA- TUAN BILL OF QUANTITY BOQ KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG LOKASI : DESA LABEAN, DUSUN III MAPAGA TAHUN ANGGARAN : 2012 10 M Pekerjaan Pengukuran dan Pemasangan Bowplank 0.001 M³ Kayu 57 kelas III Rp. 1,300,000.00 = Rp. 1,560.00 0.020 Kg Paku biasa 2 - 5 Rp. 18,000.00 = Rp. 360.00 0.007 M³ Papan ukuran 230 kelas III Rp. 1,300,000.00 = Rp. 9,100.00 0.100 Oh Pekerja Rp. 40,000.00 = Rp. 4,000.00 0.100 Oh Tukang Rp. 65,000.00 = Rp. 6,500.00 0.010 Oh Kepala Tukang Rp. 70,000.00 = Rp. 700.00 0.005 Oh Mandor Rp. 50,000.00 = Rp. 250.00 = Rp. 22,470.00 Untuk 1 m = Rp. 2,247.00 1 M³ Galian tanah biasa sedalam 1 m 0.400 Oh Pembantu tukang Rp. 40,000.00 = Rp. 16,000.00 Oh Tukang gali Rp. 65,000.00 = Rp. - Oh Kepala tukang Rp. 70,000.00 = Rp. - 0.040 Oh Mandor Rp. 50,000.00 = Rp. 2,000.00 Rp. 18,000.00 1 M³ Urugan kembali tanah galian 0.192 Oh Pembantu tukang Rp. 40,000.00 = Rp. 7,680.00 Oh Tukang gali Rp. 65,000.00 = Rp. - Oh Kepala tukang Rp. 70,000.00 = Rp. - 0.019 Oh Mandor Rp. 50,000.00 = Rp. 950.00 Rp. 8,630.00 1 M³ Urugan Pasir 1.200 M 3 Pasir urug Rp. 80,000.00 = Rp. 96,000.00 0.300 Oh Pembantu tukang Rp. 40,000.00 = Rp. 12,000.00 Oh Tukang gali Rp. 65,000.00 = Rp. - Oh Kepala tukang Rp. 70,000.00 = Rp. - 0.010 Oh Mandor Rp. 50,000.00 = Rp. 500.00 Rp. 108,500.00 1 M³ Urugan Sirtu 1.200 M 3 Sirtu Rp. 90,000.00 = Rp. 108,000.00 0.250 Oh Pembantu tukang Rp. 40,000.00 = Rp. 10,000.00 Oh Tukang Rp. 65,000.00 = Rp. - Oh Kepala tukang Rp. 70,000.00 = Rp. - 0.025 Oh Mandor Rp. 50,000.00 = Rp. 1,250.00 Rp. 119,250.00 1 M³ Pasang pondasi batu kali 1 Pc : 4 Psr 1.100 M 3 Batu belah 1520 cm Rp. 133,000.00 = Rp. 146,300.00 0.520 M 3 Pasir pasang Rp. 110,000.00 = Rp. 57,200.00 163.000 Kg Semen portland Rp. 1,390.00 = Rp. 226,570.00 1.500 Org Pekerja Rp. 40,000.00 = Rp. 60,000.00 0.600 Org Tukang batu Rp. 65,000.00 = Rp. 39,000.00 0.060 Org Kepala tukang Rp. 70,000.00 = Rp. 4,200.00 0.075 Org Mandor Rp. 50,000.00 = Rp. 3,750.00 Rp. 537,020.00 DAFTAR ANALISA HARGA SATUAN PEKERJAAN BOQ TambatanAnalisa 1 M³ Pasang pondasi batu kosong 1.200 M 3 Batu belah 1520 cm Rp. 133,000.00 = Rp. 159,600.00 0.300 M 3 Pasir urug Rp. 80,000.00 = Rp. 24,000.00 0.780 Org Pekerja Rp. 40,000.00 = Rp. 31,200.00 0.390 Org Tukang batu Rp. 65,000.00 = Rp. 25,350.00 0.039 Org Kepala tukang Rp. 70,000.00 = Rp. 2,730.00 0.039 Org Mandor Rp. 50,000.00 = Rp. 1,950.00 Rp. 244,830.00 1 M² Plesteran, 1 Pc : 2 Ps tebal 15 mm 8.520 Kg Semen portland Rp. 1,390.00 = Rp. 11,842.80 0.017 M 3 Pasir pasang Rp. 110,000.00 = Rp. 1,870.00 0.200 Oh Pembantu tukang Rp. 40,000.00 = Rp. 8,000.00 0.150 Oh Tukang batu Rp. 65,000.00 = Rp. 9,750.00 0.015 Oh Kepala tukang Rp. 70,000.00 = Rp. 1,050.00 0.010 Oh Mandor Rp. 50,000.00 = Rp. 500.00 Rp. 33,012.80 1 M² Plesteran, 1 Pc : 5 Ps tebal 15 mm 4.320 Kg Semen portland Rp. 1,390.00 = Rp. 6,004.80 0.022 M 3 Pasir pasang Rp. 110,000.00 = Rp. 2,420.00 0.200 Oh Pembantu tukang Rp. 40,000.00 = Rp. 8,000.00 0.150 Oh Tukang batu Rp. 65,000.00 = Rp. 9,750.00 0.015 Oh Kepala tukang Rp. 70,000.00 = Rp. 1,050.00 0.010 Oh Mandor Rp. 50,000.00 = Rp. 500.00 Rp. 27,724.80 1 M² Acian plesteran 0.520 Kg Semen Pc Rp. 1,390.00 = Rp. 722.80 0.038 Oh Pembantu tukang Rp. 40,000.00 = Rp. 1,520.00 0.075 Oh Tukang batu Rp. 65,000.00 = Rp. 4,875.00 0.008 Oh Kepala tukang Rp. 70,000.00 = Rp. 525.00 0.002 Oh Mandor Rp. 50,000.00 = Rp. 95.00 = Rp. 7,737.80 1 M³ Membuat beton fc 9,8 Mpa K 125 276.000 Kg Semen portland Rp. 1,390.00 = Rp. 383,640.00 828.000 Kg Pasir beton Rp. 85.71 = Rp. 70,967.88 1012.000 Kg Kerikil Rp. 78.52 = Rp. 79,462.24 1.650 Org Pekerja Rp. 40,000.00 = Rp. 66,000.00 0.275 Org Tukang batu Rp. 65,000.00 = Rp. 17,875.00 0.028 Org Kepala tukang Rp. 70,000.00 = Rp. 1,960.00 0.083 Org Mandor Rp. 50,000.00 = Rp. 4,150.00 Rp. 624,055.12 1 Bh Tiang Kayu Uk. 15 x 15 x 400 cm Dipancangkan Sedalam 1,0 Meter 4.000 M Kayu ukuran 15 x 15 cm Rp. 76,000.00 = Rp. 304,000.00 1.000 Set Alat bantu pancang Rp. 15,000.00 = Rp. 15,000.00 0.645 Oh Pekerja Rp. 40,000.00 = Rp. 25,800.00 0.030 Oh Tukang Kayu Rp. 65,000.00 = Rp. 1,950.00 0.003 Oh Kepala Tukang Rp. 70,000.00 = Rp. 210.00 0.032 Oh Mandor Rp. 50,000.00 = Rp. 1,600.00 = Rp. 348,560.00 BOQ TambatanAnalisa 1 Bh Tiang Kayu Uk. 15 x 15 x 750 cm Dipancangkan Sedalam 1,0 Meter 7.500 M Kayu ukuran 15 x 15 cm Rp. 76,000.00 = Rp. 570,000.00 1.000 Set Alat bantu pancang Rp. 15,000.00 = Rp. 15,000.00 0.645 Oh Pekerja Rp. 40,000.00 = Rp. 25,800.00 0.030 Oh Tukang Kayu Rp. 65,000.00 = Rp. 1,950.00 0.003 Oh Kepala Tukang Rp. 70,000.00 = Rp. 210.00 0.032 Oh Mandor Rp. 50,000.00 = Rp. 1,600.00 = Rp. 614,560.00 1 Bh Tiang Kayu Uk. 20 x 20 x 1000 cm Dipancangkan Sedalam 1,5 Meter 9.000 M Kayu ukuran 20 x 20 cm Rp. 134,000.00 = Rp. 1,206,000.00 1.000 Set Alat bantu pancang Rp. 15,000.00 = Rp. 15,000.00 0.710 Oh Pekerja Rp. 40,000.00 = Rp. 28,380.00 0.033 Oh Tukang Kayu Rp. 65,000.00 = Rp. 2,145.00 0.003 Oh Kepala Tukang Rp. 70,000.00 = Rp. 231.00 0.035 Oh Mandor Rp. 50,000.00 = Rp. 1,760.00 = Rp. 1,253,516.00 1 M² Lantai Papan Tebal 5 cm 0.055 M³ Kayu Klas II, Papan Rp. 2,450,000.00 = Rp. 134,750.00 0.400 Kg Paku Biasa Rp. 18,000.00 = Rp. 7,200.00 0.133 Oh Pekerja Rp. 40,000.00 = Rp. 5,320.00 0.333 Oh Tukang Kayu Rp. 65,000.00 = Rp. 21,645.00 0.033 Oh Kepala Tukang Rp. 70,000.00 = Rp. 2,310.00 0.006 Oh Mandor Rp. 50,000.00 = Rp. 300.00 = Rp. 171,525.00 1 M³ Balok Gelagar, Sandaran Skor Angin 1.100 M³ Kayu klas I, Balok Rp. 3,350,000.00 = Rp. 3,685,000.00 0.400 Kg Paku Biasa Rp. 18,000.00 = Rp. 7,200.00 5.000 Oh Pekerja Rp. 40,000.00 = Rp. 200,000.00 7.500 Oh Tukang Kayu Rp. 65,000.00 = Rp. 487,500.00 0.750 Oh Kepala Tukang Rp. 70,000.00 = Rp. 52,500.00 0.250 Oh Mandor Rp. 50,000.00 = Rp. 12,500.00 = Rp. 4,444,700.00 BOQ TambatanAnalisa DAFTAR HARGA SATUAN UPAH KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG LOKASI : DESA LABEAN, DUSUN III MAPAGA TAHUN ANGGARAN : 2012 NO. SATUAN VOLUME UPAH Rp. KETERANGAN 1 Mandor Orang - Hari 50,000.00 2 Pekerja Orang - Hari 40,000.00 3 Kepala Tukang Gali Orang - Hari 70,000.00 4 Tukang Batu Orang - Hari 65,000.00 5 Kepala Tukang Batu Orang - Hari 70,000.00 6 Tukang Kayu Orang - Hari 65,000.00 7 Kepala Tukang Kayu Orang - Hari 70,000.00 8 Tukang Besi Orang - Hari 65,000.00 9 Kepala Tukang Besi Orang - Hari 70,000.00 10 Tukang Cat Orang - Hari 65,000.00 11 Kepala Tukang Cat Orang - Hari 70,000.00 12 Tukang Listrik Orang - Hari 65,000.00 13 Kepala Tukang Listrik Orang - Hari 70,000.00 14 Laden Tukang Orang - Hari 35,000.00 15 Tukang Pipa Orang - Hari 65,000.00 16 Kepala Tukang Pipa Orang - Hari 70,000.00 17 Operator Orang - Hari 80,000.00 18 Sopir Orang - Hari 45,000.00 19 Penjaga Malam Orang - Hari 35,000.00 U R A I A N DAFTAR HARGA SATUAN PERALATAN KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG LOKASI : DESA LABEAN, DUSUN III MAPAGA TAHUN ANGG. : 2012 HARGA NO. SATUAN SATUAN KETERANGAN Rp. 1 Vibrator Concrete Jam 35,000.00 2 Stamper Jam 65,000.00 3 Wheel loader Jam 385,000.00 4 Tandem Roller Jam 315,000.00 5 Dump Truck Jam 250,000.00 6 Water Tank Truck Jam 225,000.00 7 Pan Pencampur Latasir Jam 50,000.00 JENIS PERALATAN DAFTAR HARGA SATUAN BAHAN KEGIATAN : PEMBANGUNAN TAMBATAN PERAHU PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU KECAMATAN BALAESANG LOKASI : DESA LABEAN, DUSUN III MAPAGA TAHUN ANGGARAN : 2012

I. Batu Pecah Manual