20.8 10.9 13.6 1 17.7 11 10 Adaro Energy Annual Report 2013 English

54 ‹Œ IABlE, STrong, EFFICIEnT E5000 coal from Tutupan mine Left scale: Right scale: E4000 coal from Wara mine E5000 coal from Paringin mine Overburden removed 1993 1994 1995 1996 1997 1998 Million tonnes 1999 2000 2001 2002 1992 1.0 1.0 1.0 2.1 5.4 12.9 30.1 26.8 22.7 24.6 40.4 48.2

9.4 20.8

1.4 10.9

2.4 13.6

5.5 15.5

8.6 17.7

50 40 30 20 10 AI Coal Production and Overburden Stripping AI continues its long-term trend of growing production volume at its South Kalimantan mines Asian Financial Crisis starts Indonesian constitutional reform starts AI Operations in 2013 Millions of tonnes unless specified FY13 FY12 Change Coal Production Total 52.26

47.19 11

Tutupan 38.65 38.62 paringin 5.74 0.94 511 Wara 7.87 7.63 3 Coal Sales Total 52.16

47.41 10

E5000 34.09 37.71 -10 E4700 E4900 8.43 - - E4000 E4500 9.64 9.70 -1 Overburden Removal Overburden stripping Mbcm 294.86 331.48 -11 Average Planned Strip Ratio x 5.75 6.4 -10 AI 5-Year Highlights 2009 2010 2011 2012 2013 Key Financial Highlights US million Total assets 2,304.4 1,885.0 2,699.6 2,927.4 2,912.3 Total liabilities 1,844.1 1,648.6 2,312.1 2,508.3 2,401.3 Interest-bearing debt 1,204.3 1,141.3 1,629.7 1,806.9 1,688.2 Total equity 459.3 236.4 387.5 419.1 511.0 Revenue 2,406.9 2,412.0 3,386.2 3,343.1 2,984.6 Operating Statistics Coal production Mt 40.6 42.2 47.7

47.2 52.3

Coal sales Mt 41.1 42.5 47.2 47.4 52.2 Overburden removal Mbcm 208.5 225.9 299.3 331.5 294.9 Average planned strip ratio x 5.0 5.5 5.9 6.4 5.75 Ž u r p r o F Il E o u r M E SSA g E S o u r B u S In E S S o u r pE o pl E o u r g o v Ern A n C E o ur C o M M un IT IE S o u r I n v E S T o r S o ur F In An C E S  DAro EnErgy 2013 AnnuAl rEporT 55 sustainable value from Indonesian coal. In 2013, AI recorded a lost time injury frequency rate lTIFr of 0.16 compared to 0.28 in 2012, better than our target of 0.25. We had 10 lost time injuries lTIs, a 44 improvement from 18 lTIs in 2012. With a total of 62,060,850 work hours, we went 6.3 million hours without a single accident. We had no lTIs in December 2013, an exemplary safety performance. Coal Mining 2013 was our best year of production with 52.3Mt of thermal coal mined and hauled, an 11 increase. Strong customer demand, normal weather conditions and good performance by the contractors combined to help attain our record results. our contractors performed at a high level, with 145,680 tonnes mined daily on average from all three pits. Tutupan remains our main mine, producing 38.65Mt in 2013, relatively lat year-on-year. production from Wara was 7.87Mt in 2013, a 3 increase, while paringin grew by more than ive previously, four contractors worked in the tutupan pit, while three contractors split the work in Wara and paringin pits. Starting in 2013, we have two contractors working in tutupan, two contractors in Wara and one contractor in paringin. this allowed for better co-ordination in each pit, thereby improving productivity. We will also negotiate mining contracting rates to be more competitive for 2014. In addition to the new annual production record of 52.3Mt, AI and its contractors also achieved a quarterly production record of 13.73Mt in 3Q13, as well as a daily coal-hauling record of 187,331 tonnes in December 2013. the following table shows the breakdown of overburden removal, and coal mining and hauling activities of our contractors as a percentage of the company’s total in 2013. Having a number of contractors helps us obtain good results in terms of cost and performance. Safety is always a top priority. Safe and reliable operations create trust with our partners, which is important to achieve our objective of creating Million bank cubic meters 2003 2004 2005 2006 56.1 66.0 85.6 122.8 119.9 159.3 208.5 225.9 299.3

22.5 24.3