Summary of Literature Review Background

viii LIST OF TABLES

2.1 Summary of Literature Review

29 4.1 Time study data collection for Final Assembly 40 4.1.1 Assembly Process Descriptions 41 4.2 Machine Section and Name 46 4.3 Performance Rating for each workers 49 4.4 The Allowance of the Process 50 4.5 The Normal Time and Standard Time 51 4.6 VA and NVA Category 54 4.7 After New Process Network Diagram Improvement 60 ix LIST OF FIGURES 2.1 Frederick Winslow Taylor 6 2.2 Bethlehem Steel Works 9 2.3 Henry Laurence Gantt 10 2.4 Harrington Emerson 10 2.5 Ralph Mosser Barnes 11 2.6 Continuous Stopwatch 13 2.7 Snapback Stopwatch 14 2.8 MTM Stopwatch 15 2.9 Digital Stopwatch 17 2.10 Digital Stopwatch 17 2.11 Computerized Electronic Timer 18 2.12 Video Recorder 19 2.13 Video Recorder 19 2.14 Video Recorder 19 2.15 Video Recorder 19 3.1 PSM 1 Flow Chart 32 3.2 PSM 2 Flow Chart 34 3.3 Time Study Flow Chart 36 4.1 Assembly Process Flow Chart 44 4.2 Machine Section 45 4.3 Graph of Assembly Process Comparison 52 4.4 Graph of Value added and Non-value added Comparison 56 4.5 Network Diagram of Initial Process Flow 57 4.6 Network Diagram of Initial Electrical Plate Mounting Process 58 4.7 After Developing New Network Diagram 59 4.8 Graph Before Network Process Improvement 62 x 4.9 Graph After Network Process Improvement 63 4.10 Lead Time Graph Comparison 64 4.11 Network Process Before Overall Improvement 65 4.12 Network Process After Overall Improvement 65 4.13 Graph of Overall Reduction in Lead Time 65 4.14 Warehouse inventory management and JIT system 68 xi LIST OF ABBREVIATIONS PSM – Projek Sarjana Muda WIP – Work in progress MTM – Methods Time Measurement TMU – Time Measurement Unit MOST – Maynard Operation Sequence Techniques DS – Die Sorting VA - Value Added NVA – Non-Value Added JIT - Just In Time 1 CHAPTER 1 INTRODUCTION

1.1 Background

A general study of an industrial organization for productivity improvement and cost reduction can be described in term of the Time Study application. A sense of employee involvement in work system is considered as the major affects in done the job with easier and faster. Basically the measurement of work can be using Time Study which divided into few techniques. The way how does the measurement can be applied is based on stop watch, computer software and video recording. In term of applying Time Study in a production system, there are some task to be studied before proceed to time observation. The tasks that need to determined are such as the process of work elements, job order or work standard and part of jobs. In another word, Time Study determined the time systems, standard data and work sampling that used for measuring work in organization. Time Study used to require the time of a qualified and well trained employee who work at a normal pace to do a specific task. Developments in Time Study are taking place with rapid changes to concern with design of work systems and methods. 2

1.2 Problem Statement