4,933 Adaro Energy 2012 Annual Report English

O UR W OR L D O UR TH O U g HT s O UR B U s IN E s s O UR PE O PL E O UR C O M M U N IT IE s O UR g O v ERN A N C E O UR IN v E s T O R s O UR F INAN C E s OU R B US IN E S S ADARO ENERgY 2012 ANNUAL REPORT 107 Coal resources as at Dec. 31, 2011 Calculated changes to Adaro Energys coal resources 2012 vs. 2011 Total measured, indicated inferred coal resources Mt Measured Mt Indicated Mt Inferred Mt Adaro Energy ownership equity Adaro Energy attributable Total Measured, Indicated Inferred Mt Changes to operating company total measured, indicated inferred Mt Changes to operating company total measured, indicated inferred Changes to Adaro Energy attributable total measured, indicated inferred Mt Changes to Adaro Energy attributable total measured, indicated inferred 2,408 729 814 865 100 2,408 170 7 170 7 297 116 96 85 297 89 30 89 30 south Paringin was not included in 2011 resources NA 117 NA 117 NA 1,301 486 366 449 1,301 -34 -3 -34 -3 367 133 134 100 367 7 2 7 2 4,373 1,464 1,410 1,499 100 4,373 349 8 349 8 PT Bhakti Energi Persada was not acquired until 2012 1,401 NA 1,261 NA 1,817 NA 1,636 NA 186 NA 167 NA 745 NA 671 NA 2,696 NA 2,426 NA 1,093 NA 984 NA 19 NA 17 NA 7,957 NA 7,161 NA 110 72 31 7 25 28 - - - - 10 10 3 - - - - 14 11 2 1 4 - - - - 80 80 20 - - - - 60 60 15 - - - - 70 70 18 - - - - 430 430 108 - - - - 774 83 33 658 194 - - - - 286 250 36 75 215 -5 -2 -4 -2 - - - - 61 - - - - - 286 250 36 75 215 -5 - -4 -2 774 83 33 658 25 194 - - - - 4,659 1,714 1,446 1,499 98.40 4,588 344 8 345 8 PT Bhakti Energi Persada was not acquired until 2012 7,957 NA 7,161 NA 5 Based on PT. Mustika Indah Permais MIP 2012 JORC statement by Joseph Crisostomo CP Resources. 6 Tonnage based on Adaro Energy exercising its option to increase its 10 equity share in BEP to 90. NB Totals may not add up due to rounding. Adaro Energy JORC-Compliant Coal Resource Quality Metallurgical Coal Air Dried Basis Operating company Locality Coal resource quality estimated as at June 30, 2012 Ash adb Volatile matter adb Total sulphur adb IndoMet Coal 1 Lampunut metallurgical 4.2 28.5 0.55 Lampunut thermal Haju metallurgicalthermal 4.7 39.2 0.98 Luon metallurgicalthermal 3.6 18.7 0.72 Luon metallurgical underground 3.4 18.8 0.56 Bumbun metallurgicalthermal 4.5 17.4 0.80 Juloi NorthWest metallurgicalthermal 4.5 27.7 0.49 Adaro Energy JORC-Compliant Coal Resource Quality Air Dried Basis Operating company Locality Estimated as at Dec. 31, 2012 Moisture in the analysis sample adb Ash adb Volatile matter adb Total sulphur adb Calorific value Kcalkg adb PT Adaro Indonesia 2 Tutupan 19.1 2.2 40.5 0.12 5,436 North Paringin 19.1 3.4 38.4 0.32 5,443 south Paringin 18.9 3.5 38.3 0.25 5,439 Wara I 21.6 3.8 39.1 0.29 5,113 Wara II 18.8 4.4 41.6 0.33 5,262 Total South Kalimantan 19.8

2.9 40.0

0.20 5,336

PT Bhakti Energi Persada 3 PT Bumi Kaliman sejahtera 14.3 5.9 41.4 0.17 5,328 PT Bumi Murau Coal 14.0 4.6 41.9 0.15 5,474 PT Birawa Pandu selaras 13.5 5.3 41.9 0.15 5,488 PT Khazana Bumi Kaliman 13.4 5.6 41.9 0.16 5,436 PT Persada Multi Bara 14.2 4.6 41.8 0.16 5,418 PT Telen Eco Coal 13.5 4.6 42.9 0.17 5,517 PT Tri Panuntun Persada 13.6 4.2 44.4 0.16 5,441 Total East Kalimantan 13.6

5.0 42.1

0.16 5,457

PT Mustika Indah Permai 4 Lahat Regency, south sumatra 21.5 6.0 37.4 0.49 5,167 Total South Sumatra 21.5

6.0 37.4

0.5 5,167

Total Adaro Energy sub-bituminous coal resources 5 inc. PT Adaro Indonesia PT Mustika Indah Permai

19.9 3.0

39.8 0.20

5,340 Total Adaro Energy low-rank coal resources 6

i.e. PT Bhakti Energi Persada 13.6

5.0 42.1

0.2 5,457

Quality of Coal Resources Adaro Energy JORC-Compliant Coal Resource Quality Gross as Received Basis Operating company Locality Estimated as at Dec. 31, 2012 Total moisture Ash gar Volatile matter gar Total sulphur gar Calorific value Kcalkg gar PT Adaro Indonesia 2 Tutupan 28.0 2.0 36.0 0.11 4,843 North Paringin 28.7 3.0 33.8 0.28 4,799 south Paringin 30.8 2.9 32.7 0.21 4,651 Wara I 38.9 2.9 30.5 0.22 3,997 Wara II 43.6 3.1 28.9 0.23 3,657 Total South Kalimantan 32.3

2.4 33.7

0.16 4,514

PT Bhakti Energi Persada 3 PT Bumi Kaliman sejahtera 47.3 3.6 25.4 0.10 3,272 PT Bumi Murau Coal 46.3 2.9 26.2 0.09 3,415 PT Birawa Pandu selaras 46.0 3.3 26.2 0.09 3,423 PT Khazana Bumi Kaliman 47.0 3.5 25.7 0.10 3,329 PT Persada Multi Bara 47.8 2.8 25.5 0.10 3,297 PT Telen Eco Coal 45.2 2.9 27.2 0.11 3,497 PT Tri Panuntun Persada 42.7 2.8 29.4 0.10 3,606 Total East Kalimantan 46.9

3.1 25.9

0.10 3,354

PT Mustika Indah Permai 4 Lahat Regency, south sumatra 34.2 5.0 31.3 0.41 4,333 Total South Sumatra 34.2

5.0 31.3

0.41 4,333

Adaro Energy total sub-bituminous coal resources 5 inc. PT Adaro Indonesia PT Mustika Indah Permai

32.4 2.5

33.6 0.17

4,506 Adaro Energy total low-rank coal resources 5

i.e. PT Bhakti Energi Persada 46.9

3.1 25.9

0.10 3,354

DELIvERINg POsITIvE ENERgY 108 increase in JORC coal resources overall due to gains in Tutupan and North Paringin plus the addition of south Paringin coal. Wara 1 lost resources due to depletion and Wara 2 gained some tonnes. In 2012, AI maintained its conservative practice of using only seams with cored intersections in drill holes as points of observation and a 1,000-meter inferred resource radius. The AI Resource study uses a cut-off depth that varies per deposit based on current mining economics. This method tends to make the quoted resource relect the remaining potential within which further open-pit reserves might be deined. The resource polygons retain vertical walls. AI intends to complete a life-of-mine plan during 2013 which will allow a more focused evaluation of future resources in each mined area. Overall, AI’s resources show a slight fall-off in rank as more of the higher-rank Tutupan coal is mined. The effect is minimal, as shown in the resource coal quality tables at right. JORC Coal Reserves: AI’s JORC-compliant coal reserves show an overall slight gain of 30 million tonnes, mainly due to the introduction of the ive-year mining plan reserves for North Paringin. North Paringin is currently being mined, but the reserves have not yet been reported. Tutupan reserves dropped by 16 million tonnes and Wara 1 by 10 million tonnes. Overall reserves were 921 million tonnes. The overall coal quality of AI’s reserves remained steady. PT Mustika Indah Permai JORC Coal Resources: since a JORC report by Marston released in March 2012, MIP has completed another 127 drill holes, analyzed extra cores and gathered extensive LIDAR light detection and ranging topography data. Using the new drilling and topography data, AEI remodeled the MIP deposit and estimated the coal resources. The result was within 2 of the original resource estimate. The MIP concession area contains three main coal seams and two minor seams, ranging from 1.6 to 17 meters thick. Examination of the changes between the Marston model and the Adaro Eksplorasi JORC model showed minor coal loss due to more accurate mapping of topography along the crop line, which showed some small areas where the upper half of the main B seam had been eroded. This was balanced by more accurate topography down dip which reduced the overall ratio. The overall resource tonnage reduction was 5 million tonnes. Meanwhile, the increased drilling has increased the conidence level of our data by moving all but 8 million tonnes of coal resources into the measured category. AEI used both open holes and cored holes as points of observation for JORC estimation purposes. Total measured, indicated and inferred coal resources are 282 million tonnes, of which Adaro Energy owns 75, or 211 million tonnes. The MIP coal resources quality has remained constant with that resolved in the Marston 2012 study, with the exception of sodium which has increased to an average of 4 over the whole deposit due to the inluence of deeper cores where higher sodium levels occur. The MIP resources are conined within a theoretical pit shell which is based on the C2 seam and has a deined high and O UR W OR L D O UR TH O U g HT s O UR B U s IN E s s O UR PE O PL E O UR C O M M U N IT IE s O UR g O v ERN A N C E O UR IN v E s T O R s O UR F INAN C E s OU R B US IN E S S Coal resource quality as at June 30, 2011 Calculated quality changes to Adaro Energys metallurgical coal resources 2012 vs. 2011 Notes Ash adb Volatile matter adb Total sulphur adb Ash adb Volatile matter adb Total sulphur adb 1 Based on BHP Billitons 2012 Annual Report with the permission of BHP Billiton. 4.2 28.5 0.55 - - - - - - 4.7 39.2 0.98 - - - 3.6 18.7 0.72 - - - 3.4 18.8 0.56 - - - 4.5 17.4 0.80 - - - 4.5 27.7 0.49 - - - Calculated as at Dec. 31, 2011 1 Calculated quality changes to Adaro Energy coal resources 2012 vs. 2011 Notes Moisture in the analysis sample adb Ash adb Volatile matter adb Total sulphur adb Calorific value Kcal kg adb Moisture in the analysis sample adb Ash adb Volatile matter adb Total sulphur adb Calorific value Kcal kg adb 1 2011 Adaro Indonesia coal quality estimates are restatements of the quality in Adaro Indonesias 2010 JORC Coal Resources and Reserves statement 2 PT Adaro Indonesias coal quality samples have been analysed to AsTM standards 3 PT Bhakti Energi Persadas coal quality samples have been analysed to AsTM standards 4 PT Mustika Indah Permais coal quality samples have been analysed to IsO standards 5 The Adaro Energy group coal quality was derived by combining the coal quality parameters of the Coal Resources of the component operating companies using weight averaging 6 The Adaro Energy group coal quality was derived by combining the coal quality parameters of the Coal Resources of the component operating companies using weight averaging. 17.6 2.1 41.2 0.11 5,563 1.5 0.1 -0.7 0.01 -127 16.9 3.3 41.0 0.23 5,799 2.2 -0.1 -2.6 0.09 -356 south Paringin was not included in 2011 Resources 19.1 3.8 40.3 0.28 5,278 2.5 - -1.2 0.01 -165 19.3 4 41.4 0.28 5,215 -0.5 0.4 0.2 0.05 47

18.1 2.8

41 0.20 5,466 1.7

0.1 -1.1

0.01 -130

PT Bhakti Persada Energi was not acquired until 2012

22.2 6.5

36.6 0.49

5,114 -0.7 -0.5 0.8 - 53

22.2 6.5

36.6 0.49

5,114 -0.7 -0.5 0.7 -0.01 53

18.1 2.8

41.0 0.20

5,466 1.8

0.2 -1.2

- -126 PT Bhakti Persada Energi was not acquired until 2012 As at Dec. 31, 2011 1 Calculated quality changes to Adaro Energy coal resources 2012 vs. 2011 Notes Total Moisture Ash gar Volatile matter gar Total sulphur gar Calorific Value Kcal kg gar Total moisture Ash gar Volatile matter gar Total sulphur gar Calorific value Kcal kg gar 1 2011 Adaro Indonesia Coal quality estimates are restatements of the quality in PT Adaro Indonesias 2010 JORC Coal Resources and Reserves statement 2 PT Adaro Indonesias coal quality samples have been analysed to AsTM standards 3 PT Bhakti Energi Persadas coal quality samples have been analysed to AsTM standards 4 PT Mustika Indah Permais coal quality samples have been analysed to IsO standards 5 The Adaro Energy group coal quality was derived by combining the coal quality parameters of the coal resources of the component operating companies using weight averaging. 27.1 1.9 36.5 0.10 4,922 0.9 0.1 -0.5 0.01 -79 29.1 2.8 35.0 0.20 4,948 -0.4

0.2 -1.2

0.08 -149 south Paringin was not included in 2011 Resources 38.9 2.9 30.4 0.21 3,986 - - 0.1 0.01 11 43.4 2.8 29.0 0.20 3,658 0.2 0.3 -0.1 0.03 -1

32.2 2.3

33.9 0.15

4,525 0.1

0.1 -0.2

0.01 -11

PT Bhakti Energi Persada was not acquired until 2012

33.9 5.5

31.1 0.42

4,345 0.3 -0.5 0.2 -0.01 -12

33.9 5.5

31.1 0.42

4,345 0.3 -0.5 0.2 -0.01 -12

32.2 2.3

33.9 0.15

4,525 0.2

0.2 -0.4

0.02 -19

PT Bhakti Energi Persada was not acquired until 2012 ADARO ENERgY 2012 ANNUAL REPORT 109