81
Copyright © 2014 Open Geospatial Consortium
11. RESET Feasibility Planning Requirement Class
This section reports all the requirements a RESET server has to comply with for claiming conformance with respect to the Feasibility Planning class. This class shall implement all
functionalities that perform a feasibility analysis process and then submit the results of this process.
This section is structured by resources: for each RESET resource, a dedicated sub-section describes all related requirements:
‐ Capabilities in §11.1; ‐ Procedures in §11.211.2 ;
‐ Feasibility in §11.3; ‐ Planning in §11.4.
Requirements Class http:www.opengis.netspecRESET1.0reqFeasibilityPlanning
Target type
RESET Server
Dependency http:www.opengis.netspecRESET1.0reqCore
http:www.opengis.netspecRESET1.0reqFeasibility http:www.opengis.netspecRESET1.0reqPlanning
11.1 Capabilities
None.
11.2 Procedures
None.
11.3 Feasibility
82
Copyright © 2014 Open Geospatial Consortium
11.3.1 Submission Requirement
http:www.opengis.netspecRESET1.0reqFeasibilityPlanningFeasibilityAnalysis submission
The RESET Server shall allow submission of a Feasibility resource by:
HTTP POST request to the Feasibility resource URL:
http:hostname:portcontext pathRESET1.0.0feasibility{taskID} where taskID is a path parameter
HTTP pathquery parameters including several {segmentID} elements.
Requirement
http:www.opengis.netspecRESET1.0reqFeasibilityPlanningFeasibilityAnalysis submissioncontent
On successful FeasibilityStudy submission, a RESET server shall return:
‐ HTTP status code: 201 created; ‐ HTTP entity body:
o eosps:StatusReport as described in the Task status operation section
8.3.1 above; o
eosps:ProgrammingStatus as described in the Creation section 0 of the RESET Planning Requirement Class in section 10.
Requirement
http:www.opengis.netspecRESET1.0reqFeasibilityPlanningFeasibilityAnalysis submissioncontentstatus
On successful Feasibility Study submission, the server shall use the same status identifiers as in the Creation section 0 and Acquisition section
10.3.3 of the RESET Planning Requirement Class in section 10.
Requirement
http:www.opengis.netspecRESET1.0reqFeasibilityPlanningFeasibilityAnalysis submissioncontentsegments
On successful Planning submission, the status of the segments provided in the ProgrammingStatus shall be one of:
‐ “ACCEPTED”: the segment has been planned ‐ “REJECTED”: the segment could not be planned
11.4 Planning
None.
83
Copyright © 2014 Open Geospatial Consortium
12. RESET Reservation Requirement Class
This section reports all the requirements a RESET server has to comply with for claiming conformance with respect to the Reservation class. This class shall implement all
functionalities that perform a feasibility analysis process and then submit the results of this process.
This section is structured by resources: for each RESET resource, a dedicated sub-section describes all related requirements:
‐ Capabilities in §12.1; ‐ Procedures in §12.2;
‐ Planning in §12.3; ‐ Reservation in §12.4.