6.5.2 Geothermal Power Plant Capacity

MW No Working Area Location Turbine Capacity Operator Total Capacity 1 PLTP Kamojang, West Java 1 x 30 MWe PLN 200 Pertamina 2 x 55 MWe PLN 1 x 40 MWe PLN 2 PLTP Lahendong, North Sulawesi 2 x 20 MWe PLN 40 Pertamina 3 PLTP Sibayak, North Sumatera 1 x 2 MWe Pertamina 2.5 Pertamina 4 PLTP Salak, West Java 3 x 60 MWe PLN 375 Chevron GS 3 x 65 MWe CGS 5 PLTP Darajat West Java 1 x 55 MWe PLN 255 Chevron GI 1 x 90 MWe CGI 1 x 110 MWe CGI 6 PLTP Wayang Windu West Java 1 x 110 MWe SE 110 Star Energi 7 PLTP Dieng, Central Java 1 x 60 MWe GDE 60 Geo Dipa Energi Total 1,042.5 Source : Statistics Geothermal Business Indonesia 2006. Directorat Geothermal, Directorate General of Mineral, Coal and Geothermal 6 68 HA NDBO O K o f ENERG Y EC O NO MIC STA TISTIC S o f INDO NESIA 6

6.5.3 Geothermal Steam Production

Year Pertamina Field KOB Field Kamojang Sibayak Lahendong Sub Total Salak Darajat 2000 8,238 66 - 8,304 19,494 4,876 2001 8,623 242 457 9,322 22,044 7,242 2002 9,292 212 954 10,458 21,742 7,453 2003 9,274 42 1,132 10,448 21,325 7,435 2004 9,277 126 1,173 10,576 22,595 8,011 2005 7,462 74 1,012 8,548 24,167 7,551 2006 8,096 165 1,240 9,501 24,527 7,633 2007 8,121 84 1,311 9,517 24,346 10,322 Source : Statistics Geothermal Business Indonesia 2006. Directorat Geothermal, Directorate General of Mineral, Coal and Geothermal

6.5.4 Geothermal Electricity Production

Year Pertamina Field KOB Field Kamojang Sibayak Lahendong Sub Total Salak Darajat 2000 1,072 3 - 1,075 2,398 741 2001 1,116 11 61 1,188 2,726 1,107 2002 1,202 10 93 1,305 2,668 1,169 2003 1,201 1 155 1,357 2,637 1,170 2004 1,200 4 159 1,363 2,737 1,251 2005 963 2 134 1,099 2,930 1,218 2006 1,043 6 166 1,215 2,920 1,176 2007 1,049 3 177 1,229 2,963 1,605 Source : Statistics Geothermal Business Indonesia 2006. Directorat Geothermal, Directorate General of Mineral, Coal and Geothermal