67
HA NDBO O K o f ENERG Y EC O NO MIC STA TISTIC S o f INDO NESIA
6.5.2 Geothermal Power Plant Capacity
MW No
Working Area Location
Turbine Capacity Operator
Total Capacity
1 PLTP Kamojang,
West Java 1 x 30 MWe
PLN 200
Pertamina 2 x 55 MWe
PLN 1 x 40 MWe
PLN 2
PLTP Lahendong, North
Sulawesi 2 x 20 MWe
PLN 40
Pertamina 3
PLTP Sibayak, North
Sumatera 1 x 2 MWe
Pertamina 2.5
Pertamina 4
PLTP Salak, West Java
3 x 60 MWe PLN
375 Chevron
GS 3 x 65 MWe
CGS 5
PLTP Darajat West Java
1 x 55 MWe PLN
255 Chevron GI
1 x 90 MWe CGI
1 x 110 MWe CGI
6 PLTP Wayang Windu
West Java 1 x 110 MWe
SE 110
Star Energi
7 PLTP Dieng,
Central Java 1 x 60 MWe
GDE 60
Geo Dipa Energi Total
1,042.5 Source : Statistics Geothermal Business Indonesia 2006. Directorat Geothermal, Directorate General
of Mineral, Coal and Geothermal
6
68
HA NDBO O K o f ENERG Y EC O NO MIC STA TISTIC S o f INDO NESIA
6
6.5.3 Geothermal Steam Production
Year Pertamina Field
KOB Field Kamojang
Sibayak Lahendong
Sub Total Salak
Darajat 2000
8,238 66
- 8,304
19,494 4,876
2001 8,623
242 457
9,322 22,044
7,242 2002
9,292 212
954 10,458
21,742 7,453
2003 9,274
42 1,132
10,448 21,325
7,435 2004
9,277 126
1,173 10,576
22,595 8,011
2005 7,462
74 1,012
8,548 24,167
7,551 2006
8,096 165
1,240 9,501
24,527 7,633
2007 8,121
84 1,311
9,517 24,346
10,322
Source : Statistics Geothermal Business Indonesia 2006. Directorat Geothermal, Directorate General of Mineral, Coal and Geothermal
6.5.4 Geothermal Electricity Production
Year Pertamina Field
KOB Field Kamojang
Sibayak Lahendong
Sub Total Salak
Darajat 2000
1,072 3
- 1,075
2,398 741
2001 1,116
11 61
1,188 2,726
1,107 2002
1,202 10
93 1,305
2,668 1,169
2003 1,201
1 155
1,357 2,637
1,170 2004
1,200 4
159 1,363
2,737 1,251
2005 963
2 134
1,099 2,930
1,218 2006
1,043 6
166 1,215
2,920 1,176
2007 1,049
3 177
1,229 2,963
1,605
Source : Statistics Geothermal Business Indonesia 2006. Directorat Geothermal, Directorate General of Mineral, Coal and Geothermal