PEKERJAAN : PEMBANGUNAN KANTOR KELURAHAN CILENGGANG HARGA SATUAN
JUMLAH Rp.
Rp. 1
PEKERJAAN LANTAI 1 I. PEKERJAAN PERSIAPAN :
1 -
1.00 ls 10,000,000.00
10,000,000.00 2
- 1.00 ls
10,000,000.00 10,000,000.00
3 I. 009
224.00 m
2
2,085.36 467,119.83
4 I. 011
122.70 m
1
42,852.37 5,257,985.81
5 I. 002
1.00 unit
245,284.79 245,284.79
6 I. 020
224.00 m
2
4,346.31 973,573.44
7 -
1.00 ls
5,000,000.00 5,000,000.00
8 I. 005
1.00 set
5,678,969.08 5,678,969.08
9 I. 017
24.00 m
2
359,992.57 8,639,821.79
10 I. 012
102.00 m
1
427,537.91 43,608,867.24
11 -
1.00 ls 12,750,000.00
12,750,000.00 102,621,621.99
II, PEKERJAAN TANAH :
1 III. 003
104.97 m
3
30,170.48 3,166,995.29
2 VI. 001
3.12 m
3
238,660.42 744,620.51
3 VI. 001
22.09 m
3
238,660.42 5,272,008.68
4 III. 015
66.26 m
3
221,907.40 14,703,584.59
5 III. 013
62.27 m
3
14,458.83 900,351.37
24,787,560.43 III. PEK. BETON BERTULANG :
1 XIX. 003
1.57 m
3
1,391,006.89 2,183,880.82
2 XIX. 163
9.36 m
3
5,389,243.79 50,443,321.89
3 XIX. 163
0.39 m
3
5,389,243.79 2,101,805.08
4 XIX. 163
0.25 m
3
5,389,243.79 1,347,310.95
5 XIX. 166
7.32 m
3
4,995,782.64 36,569,128.95
6 XIX. 164
1.11 m
3
4,599,555.39 5,105,506.49
7 XIX. 005
24.03 m
3
793,315.71 19,063,376.61
8 XIX. 182
8.46 m
3
5,721,551.84 48,404,328.59
9 XIX. 183
1.72 m
3
5,454,928.44 9,382,476.92
10 XIX. 183
0.86 m
3
5,454,928.44 4,691,238.46
11 XIX. 170
2.21 m
3
4,585,423.22 10,133,785.32
12 XIX. 170
0.88 m
3
4,585,423.22 4,035,172.43
13 XIX. 172
3.76 m
3
3,728,192.91 14,018,005.33
14 XIX. 172
0.14 m
3
3,728,192.91 521,947.01
15 XIX. 001
97.85 m
2
99,317.93 9,718,259.44
217,719,544.29 IV. PEKERJAAN PASANGAN :
1 VII. 014
42.70 m
3
733,302.47 31,312,015.51
2 VII. 006
8.54 m
3
330,379.26 2,821,438.88
3 VIII. 005
351.71 m
2
94,247.76 33,147,879.44
4 VIII. 004
8.00 m
2
96,270.48 770,163.82
5 X. 006
643.02 m
2
38,585.52 24,811,262.49
6 X. 017
60.40 m
2
58,869.15 3,555,696.95
7 -
46.28 m
2
240,950.00 11,151,166.00
8 XI. 012
217.88 m
2
108,780.76 23,701,151.69
9 XI. 012
32.68 m
2
108,780.76 3,554,955.19
10 XI. 017
18.30 m
2
107,141.88 1,960,696.44
11 XI. 018
4.65 m
2
83,613.26 388,801.67
12 XI. 018
1.40 m
2
83,613.26 117,058.57
13 XVII. 001
1.00 bh
2,203,175.75 2,203,175.75
14 XVII. 002
1.00 bh
560,225.08 560,225.08
15 XVII. 006
1.00 bh
1,581,398.86 1,581,398.86
16 XVII. 007
2.00 bh
507,752.89 1,015,505.78
17 -
2.00 bh
100,000.00 200,000.00
142,852,592.08 V. PEK.KUSEN,PINTU JENDELA+PLAFOND :
1 -
5.00 Unit
2,783,966.29 13,919,831.47
2 -
2.00 Unit
4,298,332.59 8,596,665.17
3 -
2.00 Unit
609,880.54 1,219,761.07
4 -
1.00 Unit
506,000.00 506,000.00
5 -
1.00 Unit
5,904,832.14 5,904,832.14
6 -
12.00 Unit
1,773,657.21 21,283,886.51
7 -
1.00 Unit
2,297,371.87 2,297,371.87
8 -
1.00 Unit
3,072,679.46 3,072,679.46
9 -
1.00 Unit
8,327,266.90 8,327,266.90
10 -
17.00 Unit
957,710.21 16,281,073.65
11 XII. 027
4.65 m
2
87,974.84 409,083.02
12 -
217.88 m
2
121,488.28 26,469,867.19
13 -
205.60 m
1
27,000.00 5,551,200.00
113,839,518.43
Kusen Pintu jendela BV Pas. Penutup Plafond GRC t=5 mm Rangka Hollow 20x40
Pas. Penutup Plafond Gypsum=9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM
Kusen pintu P 4 Kusen Pintu PJ 1
Kusen Pintu jendela J 1 Kusen Pintu jendela J 2 loket
Kusen Pintu jendela J 3 Kusen Pintu jendela J 4
Pas. Bak Mandi Fiber Glass Pas. Jet Washer
Kusen pintu P 1 Kusen pintu P 2
Kusen pintu P 3 Pas. Keramik Dinding 2025 CorakWarna setara Masterina KW II
Pas. Keramik Lantai 2020 CorakWarna Setara Masterina KW I Pas. Keramik Meja Pantry 2020 CorakWarna Setara Masterina KW I
Pas. Closet Duduk Setara HCG Pas. Closet Jongkok Setara Toto
Pas. Kitchen Zink lengkap Accessories Pas. Plesteran Biasa 1:5 + Acian t=15 cm
Pas. Plesteran Biasa 1:5 + Acian t=25 cm Pas. Batu Alam Andesit
Pas. Lantai Keramik 4040 warna setara Masterina KW I Pas. Plint Lantai 2040 warna setara Masterina KW I
Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kgm3 Pek. Rabat Beton t= 7cm
Pas. Pondasi Batu Belah 1:5 Pas. Batu Kosong
Pas. Dinding Bata a.d 1:5 Pas. Bata Rolag
Pek. Kolom Utama 3030, Beton Site Mix K-225, Besi = 195 Kg, K1 Pek. Kolom Teras 20100, Beton Site Mix K-225, Besi = 120kg, K2
Pek. Kolom Teras 2050, Beton Site Mix K-225, Besi = 120kg, K3 Pek. Kolom Praktis 1515, Beton Site Mix K-175, Besi = 153kg, KP
Pek. Balok Lintel 1215, Beton Site Mix K-175, Besi = 153kg, BL Pek. Plat Canopy, Beton Ready Mix K-225, Besi = 88kgm3
Pek. Pondasi Plat Beton Setempat,besi 250 kg, K1 Pek. Pondasi Plat Beton Setempat,besi 250 kg, k2
Pek. Pondasi Plat Beton Setempat,besi 250 kg, k3 Pek. Sloof Beton , uk 20x30 Beton Site Mix K-175, Besi = 200 kg, Bekisting Papan 50
Pek. Sloof Beton , 15x20 Beton Site Mix K-175, Besi = 154 kg, Bekisting Papan 50 Pek. Beton Tumbuk Lantai Kerja 1:3:5
Urugan Pasir Bawah Pondasi t:10 cm. Urugan Pasir Bawah Lantai
Urugan Tanah Merah dipadatkan tiap 20 Cm Urugan Tanah Kembali Bekas galian
Pek. Lantai Kerja Pondasi 1:2:4 Pek. Direksikeet Gudang
Pek. Gudang Kerja Pek. Pagar Pengaman Proyek
Pek.Bongkaran bangunan eksisting
Galian Tanah Pondasi Mobilisasi dan Demobilisasi Alat Bantu
Pek. Pengukuran kembali Pematokan Pekerjaan Bouwplank
Papan Nama Proyek Uk. 60x90 cm Pembersihan LokasiPerataan Tanah
Pengadaan Air Kerja dan Listrik Kerja
NO. URAIAN PEKERJAAN
ANA- VOLUME
LISA
Biaya Pengurusan IMB
DAFTAR KUANTITAS DAN HARGA PEMERINTAH KOTA TANGERANG SELATAN
DINAS TATA KOTA, BANGUNAN DAN PEMUKIMAN KEGIATAN PEMBANGUNAN GEDUNG KANTOR
VI. TANGGA :