MDU LPSE Kabupaten Indragiri Hulu BQ PAUH RANAF PDF
NO STN
VOL MATERI AL
JASA MATERI AL
JASA JUMLAH
Rp Rp
Rp Rp
1 3
4 5
6 7= 4x5
8= 4X6 9= 7+ 8
2 HARGA SATUAN
PEKERJAAN MATERI AL JUMLAH HARGA
Jasa Konstruksi
1 Kepala Tukang Listrik Mandor HO
0.50 2 Tukang Listrik
HO 0.50
3 Pekerja HO
0.50
Angkutan
1 Angkutan Darat Ton Km
- 2 Angkutan Laut
Ton Km -
JUMLAH
8 Konst. Tiang Pencab. pd T.Besi Lama TM- 7 + CO
Unit 1.00
MDU
1 I solator Tarik 20 KV String I nsulator Complit Set
3.00 -
- 2 I solator Tumpu 20 KV Pin Post I nsulator Complit
Bh 1.00
- -
3 Fuse Cut Out 20 KV 100 Amp Lengkap Fuse Link Set
3.00
NON MDU
1 Cross Arm UNP 100x50x6x2000 mm Galvanis Btg
2.00 -
- 2 Double Arm Bolt Nut M14x300 + Washer
Set 4.00
28,000.00 -
- 3 Arm Brace Besi L.40x40x4 mm
Btg 4.00
48,000.00 -
- 4 Band For Arm Brace Galvanis
Set 1.00
38,000.00 -
38,000.00 -
5 Bolt Nut M16x50 + Washer Galvanis Set
2.00 14,000.00
- 28,000.00
- 6 All Bending Wire 3,2 mm Preformed top Tie
Mtr 1.50
12,000.00 -
18,000.00 -
7 Compression Joint A3C70 mm Bh
6.00 40,000.00
- -
8 Bimetal Terminal Lug CU AL Bh
6.00 76,000.00
- -
Jasa Konstruksi
1 Kepala Tukang Listrik Mandor HO
0.50 -
- 2 Tukang Listrik
HO 1.00
- -
3 Pekerja HO
0.50 -
-
Angkutan
1 Angkutan Darat Ton Km
- -
- -
- -
2 Angkutan Laut Ton Km
- -
- -
- -
JUMLAH
8 Konst. Tiang Pencab. pd T.Besi Lama TM- 7
Unit 1.00
MDU MDU
1 I solator Tarik 20 KV String I nsulator Complit Set
3.00 -
- 2 I solator Tumpu 20 KV Pin Post I nsulator Complit
Bh 1.00
- -
3 Fuse Cut Out 20 KV 100 Amp Lengkap Fuse Link Set
- NON MDU
- 1 Cross Arm UNP 100x50x6x2000 mm Galvanis
Btg 2.00
- -
2 Double Arm Bolt Nut M14x300 + Washer Set
4.00 28,000.00
- -
3 Arm Brace Besi L.40x40x4 mm Btg
4.00 48,000.00
- -
4 Band For Arm Brace Galvanis Set
1.00 38,000.00
- 38,000.00
- 5 Bolt Nut M16x50 + Washer Galvanis
Set 2.00
14,000.00 -
28,000.00 -
6 All Bending Wire 3,2 mm Preformed top Tie Mtr
1.50 12,000.00
- 18,000.00
- 7 Compression Joint A3C70 mm
Bh 6.00
40,000.00 -
- 8 Bimetal Terminal Lug CU AL
Bh 6.00
76,000.00 -
- -
Jasa Konstruksi -
1 Kepala Tukang Listrik Mandor HO
0.50 -
- 2 Tukang Listrik
HO 1.00
- -
3 Pekerja HO
0.50 -
-
Angkutan -
1 Angkutan Darat Ton Km
- -
- -
- -
2 Angkutan Laut Ton Km
- -
- -
- -
JUMLAH
Konst. Tiang Belokan Sudut T.Besi TM- 10 Unit