MDU LPSE Kabupaten Indragiri Hulu BQ PAUH RANAF PDF

NO STN VOL MATERI AL JASA MATERI AL JASA JUMLAH Rp Rp Rp Rp 1 3 4 5 6 7= 4x5 8= 4X6 9= 7+ 8 2 HARGA SATUAN PEKERJAAN MATERI AL JUMLAH HARGA Jasa Konstruksi 1 Kepala Tukang Listrik Mandor HO 0.50 2 Tukang Listrik HO 0.50 3 Pekerja HO 0.50 Angkutan 1 Angkutan Darat Ton Km - 2 Angkutan Laut Ton Km - JUMLAH 8 Konst. Tiang Pencab. pd T.Besi Lama TM- 7 + CO Unit 1.00 MDU 1 I solator Tarik 20 KV String I nsulator Complit Set 3.00 - - 2 I solator Tumpu 20 KV Pin Post I nsulator Complit Bh 1.00 - - 3 Fuse Cut Out 20 KV 100 Amp Lengkap Fuse Link Set 3.00 NON MDU 1 Cross Arm UNP 100x50x6x2000 mm Galvanis Btg 2.00 - - 2 Double Arm Bolt Nut M14x300 + Washer Set 4.00 28,000.00 - - 3 Arm Brace Besi L.40x40x4 mm Btg 4.00 48,000.00 - - 4 Band For Arm Brace Galvanis Set 1.00 38,000.00 - 38,000.00 - 5 Bolt Nut M16x50 + Washer Galvanis Set 2.00 14,000.00 - 28,000.00 - 6 All Bending Wire 3,2 mm Preformed top Tie Mtr 1.50 12,000.00 - 18,000.00 - 7 Compression Joint A3C70 mm Bh 6.00 40,000.00 - - 8 Bimetal Terminal Lug CU AL Bh 6.00 76,000.00 - - Jasa Konstruksi 1 Kepala Tukang Listrik Mandor HO 0.50 - - 2 Tukang Listrik HO 1.00 - - 3 Pekerja HO 0.50 - - Angkutan 1 Angkutan Darat Ton Km - - - - - - 2 Angkutan Laut Ton Km - - - - - - JUMLAH 8 Konst. Tiang Pencab. pd T.Besi Lama TM- 7 Unit 1.00 MDU MDU 1 I solator Tarik 20 KV String I nsulator Complit Set 3.00 - - 2 I solator Tumpu 20 KV Pin Post I nsulator Complit Bh 1.00 - - 3 Fuse Cut Out 20 KV 100 Amp Lengkap Fuse Link Set - NON MDU - 1 Cross Arm UNP 100x50x6x2000 mm Galvanis Btg 2.00 - - 2 Double Arm Bolt Nut M14x300 + Washer Set 4.00 28,000.00 - - 3 Arm Brace Besi L.40x40x4 mm Btg 4.00 48,000.00 - - 4 Band For Arm Brace Galvanis Set 1.00 38,000.00 - 38,000.00 - 5 Bolt Nut M16x50 + Washer Galvanis Set 2.00 14,000.00 - 28,000.00 - 6 All Bending Wire 3,2 mm Preformed top Tie Mtr 1.50 12,000.00 - 18,000.00 - 7 Compression Joint A3C70 mm Bh 6.00 40,000.00 - - 8 Bimetal Terminal Lug CU AL Bh 6.00 76,000.00 - - - Jasa Konstruksi - 1 Kepala Tukang Listrik Mandor HO 0.50 - - 2 Tukang Listrik HO 1.00 - - 3 Pekerja HO 0.50 - - Angkutan - 1 Angkutan Darat Ton Km - - - - - - 2 Angkutan Laut Ton Km - - - - - - JUMLAH Konst. Tiang Belokan Sudut T.Besi TM- 10 Unit

1.00 MDU

1 I solator Tarik 20 KV String I nsulator Complit Set 6.00 - - 2 I solator Tumpu 20 KV Pin Post I nsulator Complit Bh 2.00 - - NON MDU 1 Cross Arm UNP 100x50x6x2000 mm Galvanis Bh 4.00 - - 2 All Bending Wire 3,2 mm Preformed top Tie Mtr 2.40 28,000.00 - 67,200.00 - 3 Tap Connector 25-70 mm2 Brass Teeth Bh 6.00 48,000.00 - - 4 Double Arm Bolt Nut M14x300 + Washer Bh 8.00 38,000.00 - - 5 Bolt Nut M16x300 + Washer Galvanis Bh 3.00 14,000.00 - 42,000.00 - 6 Arm Brace Besi L.40x40x4 mm Bh 8.00 12,000.00 - 96,000.00 - 7 Bolt Nut M16x50 + Washer Galvanis Bh 8.00 40,000.00 - - 8 Band For Arm Brace Galvanis Set 2.00 76,000.00 - - Jasa Konstruksi 1 Kepala Tukang Listrik Mandor HO 0.50 - - 2 Tukang Listrik HO 1.00 - - 3 Pekerja HO 0.50 - - Angkutan 1 Angkutan Darat Ton Km - - - - - - 2 Angkutan Laut Ton Km - - - - - - JUMLAH NO STN VOL MATERI AL JASA MATERI AL JASA JUMLAH Rp Rp Rp Rp 1 3 4 5 6 7= 4x5 8= 4X6 9= 7+ 8 2 HARGA SATUAN PEKERJAAN MATERI AL JUMLAH HARGA Konst. Tiang Akhir dgn Arrester T.Besi TM- 15 Unit

1.00 MDU