0.6200 oh
Pekerja 0.3500
oh Tukang batu
0.0350 oh
Kepala tukang 0.0300
oh Mandor
10 03-7395-2008
1 M Pasang nozing tangga 5x20 :
5.000 bh
Nozing 5x20 2.600
kg Portland Cemen PC
0.405 kg
PC warna 0.011
m3 Pasir pasang
0.088 oh
Tukang 0.009
oh Kepala tukang
0.155 oh
Pekerja 0.008
oh Mandor
11 03-7395-2008
1 M Pasang keramik border dinidng kmwc 5x30 :
4.000 bh
Keramik border 5x30 1.140
kg Portland Cemen PC
0.025 kg
PC warna 0.003
m3 Pasir pasang
0.090 oh
Tukang 0.009
oh Kepala tukang
0.090 oh
Pekerja 0.005
oh Mandor
12 1 M Pasang plint kaca rayband 5 mm L = 10 cm
0.1000 m2
Plint kaca rayband 5 mm L = 10 cm 1.1400
kg Portland Cemen PC
0.090 oh
Pekerja 0.090
oh Tukang
0.009 oh
Kepala tukang 0.005
oh Mandor
13 03-7395-2008
1 M Pasang kuku macan 2,5x10 :
10.000 bh
Kuku macan 2,5x10 0.945
kg Portland Cemen PC
0.147 kg
PC warna 0.004
m3 Pasir pasang
0.032 oh
Tukang 0.003
oh Kepala tukang
0.056 oh
Pekerja 0.003
oh Mandor
14 03-7395-2008
6.57 1 M2 Pasang batu serit mortar
1.1000 m2
Batu serit 11.7500
kg Portland Cemen PC
0.0350 m3
Pasir pasang 0.6200
oh Pekerja
0.3500 oh
Tukang batu 0.0350
oh Kepala tukang
0.0300 oh
Mandor
E. PEKERJAAN BETON
1 03-7394-2008
6.4 1 M3 Beton lantai kerja mutu fc = 7,4 Mpa K100 slum 3-6 cm wc = 0,87
230.0000 kg
Portland Cemen PC 893.0000
kg Pasir beton
1,024.0000 kg
Kerikil maksimum 30 mm 200.0000
ltr air
1.2000 oh
Pekerja 0.2000
oh Tukang batu
0.0200 oh
Kepala tukang 0.0060
oh Mandor
2 03-7394-2008
6.5 1 M3 Beton mutu fc = 9,8 Mpa K175 slum 12±2 cm wc = 0,66
326.0000 kg
Portland Cemen PC 760.0000
kg Pasir beton
1,029.0000 kg
Kerikil maksimum 30 mm
215.0000 ltr
air 1.6500
oh Pekerja
0.2500 oh
Tukang batu 0.0250
oh Kepala tukang
0.0800 oh
Mandor 3
03-7394-2008 6.7
1 M3 Beton mutu fc = 19,3 Mpa K225 slum 12±2 cm wc = 0,58
371.0000 kg
Portland Cemen PC 698.0000
kg Pasir beton
1,047.0000 kg
Kerikil maksimum 30 mm 215.0000
ltr air
1.6500 oh
Pekerja 0.2500
oh Tukang batu
0.0250 oh
Kepala tukang 0.0800
oh Mandor
4 03-7394-2008
6.9 1 M3 Beton mutu fc = 24 Mpa K275 slum 12±2 cm wc = 0,53
406.0000 kg
Portland Cemen PC 684.0000
kg Pasir beton
1,026.0000 kg
Kerikil maksimum 30 mm 215.0000
ltr air
1.6500 oh
Pekerja 0.2500
oh Tukang batu
0.0250 oh
Kepala tukang 0.0800
oh Mandor
5 03-7394-2008
6.9 1 M3 Beton mutu fc = 26.4 Mpa K300 slum 12±2 cm wc = 0,52
413.0000 kg
Portland Cemen PC 681.0000
kg Pasir beton
1,021.0000 kg
Kerikil maksimum 30 mm 215.0000
ltr air
1.6500 oh
Pekerja 0.2750
oh Tukang batu
0.0280 oh
Kepala tukang 0.0830
oh Mandor
6 03-7394-2008
6.17 10 kg Pembesian dengan besi polos ulir
10.5000 kg
Besi polos ulir 0.1500
kg Kawat beton
0.0700 oh
Pekerja 0.0700
oh Tukang batu
0.0070 oh
Kepala tukang 0.0040
oh Mandor
1 kg Pembesian dengan besi polos ulir
7 03-7394-2008
6.21 1 M2 Memasang Bekisting untuk sloof
0.0450 m3
Kayu kelas III terentang 0.3000
kg Paku biasa 2-5
0.1000 ltr
Minyak bekisting 0.5200
oh Pekerja
0.2600 oh
Tukang batu 0.0260
oh Kepala tukang
0.0260 oh
Mandor 8
03-7394-2008 6.22
1 M2 Memasang Bekisting untuk kolom
0.0400 m3
Kayu kelas III terentang 0.4000
kg Paku biasa 2-5
0.2000 ltr
Minyak bekisting 0.0150
m3 Balok kayu kelas II
0.3500 lbr
Multiplex 6 mm 2.0000
btg Dolken kayu dia 8-10 cm 4 m
0.6600 oh
Pekerja 0.3300
oh Tukang batu
0.0330 oh
Kepala tukang 0.0330
oh Mandor
9 03-7394-2008
6.23 1 M2 Memasang Bekisting untuk balok
0.0400 m3
Kayu kelas III terentang 0.4000
kg Paku biasa 2-5
0.2000 ltr
Minyak bekisting 0.0180
m3 Balok kayu kelas II
0.3500 lbr
Multiplex 6 mm 2.0000
btg Dolken kayu dia 8-10 cm 4 m
0.6600 oh
Pekerja 0.3300
oh Tukang batu
0.0330 oh
Kepala tukang 0.0330
oh Mandor
10 03-7394-2008
6.24 1 M2 Memasang Bekisting untuk lantai
0.0400 m3
Kayu kelas III terentang 0.4000
kg Paku biasa 2-5
0.2000 ltr
Minyak bekisting 0.0150
m3 Balok kayu kelas II
0.3500 lbr
Multiplex 6 mm 2.0000
btg Dolken kayu dia 8-10 cm 4 m
0.6600 oh
Pekerja 0.3300
oh Tukang batu
0.0330 oh
Kepala tukang 0.0330
oh Mandor
11 03-7394-2008
6.26 1 M2 Memasang Bekisting untuk tangga
0.0300 m3
Kayu kelas III terentang 0.4000
kg Paku biasa 2-5
0.1500 ltr
Minyak bekisting 0.0150
m3 Balok kayu kelas II
0.3500 lbr
Multiplex 6 mm 2.0000
btg Dolken kayu dia 8-10 cm 4 m
0.6600 oh
Pekerja 0.3300
oh Tukang batu
0.0330 oh
Kepala tukang 0.0330
oh Mandor
12 Dihitung
1 M3 Beton bertulang praktis 15 x 15 :
1.0000 m3
Beton K 225 149.5207
kg Besi
13.3332 m2
Bekisting
Jml Total
13 Dihitung
1 M3 Beton bertulang sloof 15 x 20 :
1.0000 m3
Beton K 225 173.2849
kg Besi
13.3320 m2
Bekisting
Jml Total
14 Dihitung
1 M3 Beton bertulang sloof 15 x 25 Asrama :
1.0000 m3
Beton K 225 144.9191
kg Besi
13.3335 m2
Bekisting
Jml Total
15 Dihitung
1 M3 Beton bertulang sloof 20 x 40 Asrama :
1.0000 m3
Beton K 225 153.8700
kg Besi
10.0000 m2
Bekisting
Jml Total
16 Dihitung
1 M3 Beton bertulang sloof 20 x 30 Aula :
1.0000 m3
Beton K 225 197.3039
kg Besi
10.0002 m2
Bekisting
Jml Total
17 Dihitung
1 M3 Beton bertulang balok 20 x 40 B1 Aula :
1.0000 m3
Beton K 225 144.1000
kg Besi
12.5000 m2
Bekisting
Jml Total
18 Dihitung
1 M3 Beton bertulang balok 20 x 30 B2 Aula :
1.0000 m3
Beton K 225
177.6702 kg
Besi 13.3336
m2 Bekisting
Jml Total
19 Dihitung
1 M3 Beton bertulang balok 15 x 25 B3 Aula :
1.0000 m3
Beton K 225 187.2023
kg Besi
17.3336 m2
Bekisting
Jml Total
20 Dihitung
1 M3 Beton bertulang balok 15 x 20 B4 Aula :
1.0000 m3
Beton K 225 219.5311
kg Besi
18.3332 m2
Bekisting
Jml Total
21 Dihitung
1 M3 Beton bertulang balok 30 x 70 B1 Asrama :
1.0000 m3
Beton K 225 153.5364
kg Besi
5.2382 m2
Bekisting
Jml Total
21 Dihitung
1 M3 Beton bertulang balok 25 x 50 B2 Asrama :
1.0000 m3
Beton K 225 198.1280
kg Besi
10.0000 m2
Bekisting
Jml Total
22 Dihitung
1 M3 Beton bertulang balok 20 x 30 B3 Asrama :
1.0000 m3
Beton K 225 184.0703
kg Besi
13.3336 m2
Bekisting
Jml Total
23 Dihitung
1 M3 Beton bertulang balok 15 x 25 B3 Asrama :
1.0000 m3
Beton K 225 153.3032
kg Besi
17.3336 m2
Bekisting
Jml Total
24 Dihitung
1 M3 Beton bertulang balok 15 x 25 B4 Asrama :
1.0000 m3
Beton K 225 156.4393
kg Besi
17.3336 m2
Bekisting
Jml Total
25 Dihitung
1 M3 Beton bertulang plat konsol penyangga talang t = 15 cm :
1.0000 m3
Beton K 225 21.068
kg Besi
6.667 m2
Bekisting
Jml Total
26 Dihitung
1 M3 Beton bertulang ring balok 15 x 25 RB1 Asrama Aula :
1.0000 m3
Beton K 225 144.9191
kg Besi
13.3335 m2
Bekisting
Jml Total
27 Dihitung
1 M3 Beton bertulang ring balok 15 x 20 RB 2 Asrma :
1.0000 m3
Beton K 225 173.2849
kg Besi
13.3332 m2
Bekisting
Jml Total
28 Dihitung
1 M3 Beton bertulang ring balok 15 x 25 RB3 Aula :
1.0000 m3
Beton K 225 144.9191
kg Besi
13.3335 m2
Bekisting
Jml Total
29 Dihitung
1 M3 Beton bertulang kolom 30 x 50 K1 Asrama :
1.0000 m3
Beton K 225 149.3515
kg Besi
10.6672 m2
Bekisting
Jml Total
30 Dihitung
1 M3 Beton bertulang kolom 30 x 30 K2 Asrama :
1.0000 m3
Beton K 225 106.9012
kg Besi
13.3332 m2
Bekisting
Jml Total
31 Dihitung
1 M3 Beton bertulang kolom 20 x 20 Asrama Aula :
1.0000 m3
Beton K 225 135.8600
kg Besi
20.0000 m2
Bekisting
Jml Total
32 Dihitung
1 M3 Beton bertulang kolom atas talang 15 x 30 Asrama :
1.0000 m3
Beton K 225 126.0032
kg Besi
19.9998 m2
Bekisting
Jml Total
33 Dihitung
1 M3 Beton bertulang kolom 15 x 50 Asrama :
1.0000 m3
Beton K 225 79.2687
kg Besi
17.3329 m2
Bekisting
Jml Total
33 Dihitung
1 M3 Beton bertulang kolom 30 x 70 K1 Aula :
1.0000 m3
Beton K 225 169.9082
kg Besi
9.5240 m2
Bekisting
Jml Total
34 Dihitung
1 M3 Beton bertulang kolom 30 x 30 K2 Aula :
1.0000 m3
Beton K 225 157.8651
kg Besi
13.3332 m2
Bekisting
Jml Total
35 Dihitung
1 M3 Beton bertulang balok tangga 15 x 25 Asrama :
1.0000 m3
Beton K 225 192.2264
kg Besi
17.3336 m2
Bekisting
Jml Total
36 Dihitung
1 M3 Beton bertulang kolom 15 x 20 Pos jaga :
1.0000 m3
Beton K 225 169.3550
kg Besi
23.3331 m2
Bekisting
Jml Total
37 Dihitung
1 M3 Beton bertulang kuda-kuda 15 x 25 B3 Mushola :
1.0000 m3
Beton K 225 187.2023
kg Besi
17.3336 m2
Bekisting
Jml Total
38 Dihitung
1 M3 Beton bertulang kolom 30 x 30 Doorlupe :
1.0000 m3
Beton K 225 70.8615
kg Besi
13.3332 m2
Bekisting
Jml Total
39 Dihitung
1 M3 Beton bertulang pedestal 30x40 Aula :
1.0000 m3
Beton K 225 52.4896
kg Besi
5.8331 m2
Bekisting
Jml Total
40 Dihitung
1 M3 Beton bertulang pedestal 25x30 Asrama :
1.0000 m3
Beton K 225 76.1248
kg Besi
7.3332 m2
Bekisting
Jml Total
41 Dihitung
1 Bh Pondasi foot plat 175x175 F1 Asrama :
4.5938 m3
Galian tanah 1.8375
m3 Urugan kembali
0.3063 m3
Urugan pasir 0.1531
m3 Beton K 100
0.7656 m3
Beton K 225 81.7020
kg Besi
1.4000 m2
Bekisting
Jml Total
42 Dihitung
1 Bh Pondasi foot plat 100x100 F2 Asrama :
1.0000 m3
Galian tanah 0.4000
m3 Urugan kembali
0.1000 m3
Urugan pasir 0.0500
m3 Beton K 100
0.2500 m3
Beton K 225 32.7972
kg Besi
0.8000 m2
Bekisting
Jml Total
43 Dihitung
1 Bh Pondasi foot plat 80x80 F2 Asrama :
0.6400 m3
Galian tanah 0.2560
m3 Urugan kembali
0.0640 m3
Urugan pasir 0.0320
m3 Beton K 100
0.1600 m3
Beton K 225 21.5100
kg Besi
0.6400 m2
Bekisting
Jml Total
44 Dihitung
1 Bh Pondasi foot plat 120x120 F1 Aula :
1.5840 m3
Galian tanah 0.6336
m3 Urugan kembali
0.0720 m3
Urugan pasir 0.0720
m3 Beton K 100
0.3600 m3
Beton K 225 50.2048
kg Besi
0.9600 m2
Bekisting
Jml Total
45 Dihitung
1 Bh Pondasi foot plat tangga 60x150 F3 Asrama :
0.9750 m3
Galian tanah 0.3900
m3 Urugan kembali
0.0488 m3
Urugan pasir 0.0488
m3 Beton K 100
0.2438 m3
Beton K 225 26.1280
kg Besi
0.8600 m2
Bekisting
Jml Total
46 Dihitung
1 M3 Beton bertulang plat T = 10 cm
1.0000 m3
Beton K 225 62.000
kg Besi
10.000 m2
Bekisting
Jml Total
47 Dihitung
1 M3 Beton bertulang plat lantai T = 12 cm
1.0000 m3
Beton K 225 92.996
kg Besi
8.333 m2
Bekisting
Jml Total
48 Dihitung
1 M3 Beton bertulang plat tangga T = 12 cm
1.000 m3
Beton K 225 189.137
kg Besi
8.333 m2
Bekisting
Jml Total
49 Dihitung
1 M3 Beton bertulang plat T = 8 cm
1.0000 m3
Beton K 225 49.1250
kg Besi
12.500 m2
Bekisting
Jml Total
50 Dihitung
1 M3 Beton bertulang plat T = 6 cm
1.0000 m3
Beton K 225 65.2380
kg Besi
16.667 m2
Bekisting
Jml Total
51 Dihitung
1 Bh Beton bertulang poor mini pail 60x120 t= 40 cm Aula
0.288 m3
Beton K 300 48.980
kg Besi
1.440 m2
Bekisting
Jml Total F.
PEKERJAAN KAYU ATAP
1 03-3434-2008
6.15 1 M3 Memasang konstruksi gording kayu kelas II
1.1000 m3
Kayu kruing balok 15.0000
kg Besi strip
3.0000 kg
Paku biasa 2-5 2.4000
oh Pekerja
7.2000 oh
Tukang kayu 0.7200
oh Kepala tukang
0.1200 oh
Mandor 2
03-3434-2008 6,15a
1 M3 Memasang konstruksi nok jurai kayu kelas II
1.1000 m3
Kayu kruing balok 15.0000
kg Besi strip
3.0000 kg
Paku biasa 2-5 2.4000
oh Pekerja
7.2000 oh
Tukang kayu 0.7200
oh Kepala tukang
0.1200 oh
Mandor 3
03-3434-2008 6.16
1 M2 Memasang rangka atap genteng glazur, kayu kelas II
0.0140 m3
Kayu kelas II kruing 5x7 cm 0.0080
m3 Reng bengkirai 3x5 cm
0.2500 kg
Paku biasa 2-5 0.1000
oh Pekerja
0.1000 oh
Tukang kayu 0.0100
oh Kepala tukang
0.0050 oh
Mandor 4
03-3434-2008 6.22
1 M Memasang listplank Uk 3x30 cm kayu kelas II
0.0110 m3
Kayu kelas II bengkirai papan 0.0500
kg Paku biasa 2-5
0.1000 oh
Pekerja 0.2000
oh Tukang kayu
0.0200 oh
Kepala tukang 0.0050
oh Mandor
5 3434-2008
1 M Memasang reiter kayu kruing 2x20 cm
0.004 m3
Kayu kruing 0.040
kg Paku biasa 2-5
0.175 oh
Pekerja 0.175
oh Tukang kayu
0.010 oh
Kepala tukang 0.004
oh Mandor
G. PEKERJAAN PENUTUP ATAP