INTRODUCTION 1 LITERATURE REVIEW 5 REASEARCH METHODOLOGY 26 COMPANY BACKGROUND 39 RESULT AND DISCUSSION 41

v TABLE OF CONTENT Abstrak i Abstract ii Dedication iii Acknowledgement iv Table of Content v List of Tables ix List of Figures x List of Abbreviations, Symbols and Nomenclatures xi

CHAPTER 1: INTRODUCTION 1

1.1 Problem Statement 3 1.2 Objectives 3

1.3 Scope

4 1.4 Organization of the report 4

CHAPTER 2: LITERATURE REVIEW 5

2.1 Product Manufacturing

5 2.1.1 Production 5 2.1.2 Productivity 6 2.1.3 Productivity Improvement 6 2.2 Work Standardization 7 2.2.1 Cycle Time 8 2.2.2 Takt Time 8 2.3 Machine Efficiency 8 2.3.1 Maintenance 9 2.3.2 Preventive Maintenance PM 9 2.3.2.1 The Benefits of PM 10 2.3.3 Total Productive Maintenance TPM 11 2.3.3.1 The Benefits of TPM 15 2.3.4 Overall Equipment Effectiveness OEE 16 vi 2.3.4.1 The Benefits of OEE 21 2.3.5 Bottlenecks 22 2.3.6 Uses and Misuse of OEE 23 2.3.6.1 The uses of OEE 23 2.3.6.2 The Misuses of OEE 24 2.3.7 Benchmarking 25

CHAPTER 3: REASEARCH METHODOLOGY 26

3.1 Overview of Methodology 26 3.1.1 The Process Planning Flow Chart 28 3.1.2 The Explanation of Process Planning Flow Chart 29 3.1.2.1 Problem statement identification 29 3.1.2.2 Literature review 29 3.1.2.3 Study the machine performance at Jati Beringin Sdn. Bhd. 30 3.1.2.4 Propose and Implementation an improvement plans 30 3.1.2.5 Monitoring 31 3.1.2.6 Analyze the data 31 3.2 Overall Equipment Effectiveness 31 3.2.1 Know the OEE Factors 31 3.2.1.1 Plant Operating Time 32 3.2.1.2 Planned Production Time 32 3.2.1.3 Operating Time 32 3.2.1.4 Net Operating Time 32 3.2.2 Attacking the Six Big Losses 34 3.2.2.1 Defining the Six Big Losses 34 3.2.3 Analyze the Data 36 3.2.3.1 Observation 36 3.2.3.2 Operational Cycle Time 36 3.2.3.3 Time Observation Form 37 3.2.3.4 Product Demand 38 3.2.4 Calculating the OEE 38 vii

CHAPTER 4: COMPANY BACKGROUND 39

4.1 Factory Address 39 4.2 Company Background 39 4.3 Business Nature 40 4.4 Organization Chart 40

CHAPTER 5: RESULT AND DISCUSSION 41

5.1 Result and Discussion 41 5.2 Analysis of Current Data 42 5.2.1 Downtime and Scrap data 43 5.2.2 Machine Operating Time 43 5.2.3 Current Standard Operation Process SOP 45 5.2.4 Operation Cycle Time 48 5.2.5 Daily Demand 49 5.2.6 OEE Calculation for Current Data 50 5.3 Propose and Improvement 52 5.3.1 Improvement Plans 52 5.4 Analysis of After Improvement 53 5.4.1 New SOP 53 5.4.2 Operation Cycle Time of New SOP 55 5.4.3 New Daily Demand after Implement 56 5.4.4 OEE Calculation for Implemented Data 57 5.5 Discussion 58

CHAPTER 6: CONCLUSION AND FUTURE RECOMMENDATION 60