Load power and multi meter reading

LIST OF TABLES TABLE TITLE PAGE 4.1 Toaster analysis 38

4.2 Load power and multi meter reading

40 4.3 Maximum overloads level testing 45 4.4 Medium overloads level testing 45 4.5 Low overloads level testing 46 4.6 The total load power W when demand response controller 48 is activated 4.7 Off load 1, load 2 and load 3 according the range of trigger set point 48 4.8 Load power saved by the controller 49 LIST OF FIGURES FIGURE TITLE PAGE 1.1 Typical daily weekday system load profile 1 1.2 Ideal TNB electricity generation demand 2 3.1 Flowchart of the methodology 7 3.2 Flowchart of process involved in Energy Demand Response Control Interface 10 3.3 Block diagram about process involved in Energy Demand Response Control Interface 11 3.4 Flowchart of process involved in developing PIC microcontroller based on project 13 3.5 SK40C 14 3.6 Circuit diagram of SK40C 15 3.7 UIC00B with USB and rainbow cable 15 3.8 Current Sensor 16 3.9 Current Sensor ACS756 outputs an analog signal, V OUT 16 3.10 Relay schematic diagram 17 3.11 Liquid Crystal Display 18 3.12 3.13 3.14 3.15 3.16 3.17 3.18 Mounting Board of Demand Response Controller Flow chart of software development of the project Ironing Process Etching Process Drilling Process Soldering Process Testing and Troubleshooting 18 20 21 22 22 23 23 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 Demand Response Controller Load Monitoring Module Three Type of Loadlamps Voltage regulator, 12V and 24V Simulation circuit for Development of Energy Demand Response Control Interface Flowchart of Demand Response Controller Flowchart of TNB request „TIMER 1‟ Flowchart of TNB request „TIMER 2‟ Orcad Schematic Layout Schematic DC Voltage for Current Sensor Output waveform of current sensor when DC voltage increases Toaster analysis using current sensor Graph of V dc versus Time Graph of Current versus Time Graph of load power versus multi meter reading When using 25W load, the output measured is Vrms = 631mV When using 60W load, the output measured is Vrms = 1.00V When using 100W load, the output measured is Vrms = 1.27 V „OFF SETTING‟ display „Timer 1” is pressed Load 3 off “Timer 2” is pressed Load 1 and 2 off Power setting demand: 226W Maximum overload activated After load 1 is off: 142W Load1 activated again Power setting demand: 140W Load 1 and 2 off After load 1and 2 off: 80W Load 2 activated again 26 26 27 27 29 30 32 33 34 34 36 36 37 38 39 40 41 41 41 42 43 43 43 43 44 44 44 44 45 45 46 46 4.33 4.34 4.35 4.36 4.37 4.38 Power setting demand: 75W Load 1 off Load 1 and 2 off Load 1,2and 3 off When total power is below the set point When total power is below the set point, load 1 is turned on 46 46 47 47 47 47 LIST OF APPENDICES APPENDIX TITLE PAGE A Milestones 56 B Gantt chart 57 CHAPTER 1 INTRODUCTION

1.1 Research Motivation