Enhancing efficiency of die exchange process through single minute of exchanging die at a textile manufacturing company in Malaysia.
Time (min)
60
55
50
45
40
35
30
25
20
15
10
5
0
Prep machine-In
6
Collect tools -Ex
7
Disassemble mold (top)-In
Evaluation
End
7 square
Disassemble mold (base)-In
Collect mold-Ex
8
Prep machine-In
9
Assemble mold (base)-In
2 steps
4 steps
1 step
11
Mold quick check (top)-Ex
13
Assemble mold (top)-In
Identify internal/external activities
Puller setting-In
Convert internal activities to
external activities
Folding pressure setting-In
Apply 5S
Carrier clamp setting-In
Jig approach
Feed rate setting-In
Pressure setting
Main pressure setting-In
Changeover time evaluation after
implementing kaizen and SMED
Test run-In
17
Secure mold-In
15
Mould alignment (base)-In
(a)
(b)
(c)
(e)
(d)
(f)
A
A
B
60
55
50
45
40
35
30
25
20
15
10
5
0
Prep machine-In
6
Collect tools -Ex
7
Disassemble mold (top)-In
Evaluation
End
7 square
Disassemble mold (base)-In
Collect mold-Ex
8
Prep machine-In
9
Assemble mold (base)-In
2 steps
4 steps
1 step
11
Mold quick check (top)-Ex
13
Assemble mold (top)-In
Identify internal/external activities
Puller setting-In
Convert internal activities to
external activities
Folding pressure setting-In
Apply 5S
Carrier clamp setting-In
Jig approach
Feed rate setting-In
Pressure setting
Main pressure setting-In
Changeover time evaluation after
implementing kaizen and SMED
Test run-In
17
Secure mold-In
15
Mould alignment (base)-In
(a)
(b)
(c)
(e)
(d)
(f)
A
A
B