Enhancing efficiency of die exchange process through single minute of exchanging die at a textile manufacturing company in Malaysia.

Time (min)
60
55
50
45
40
35
30
25
20
15
10
5
0

Prep machine-In
6

Collect tools -Ex
7


Disassemble mold (top)-In

Evaluation

End

7 square

Disassemble mold (base)-In

Collect mold-Ex
8

Prep machine-In
9

Assemble mold (base)-In

2 steps


4 steps

1 step

11

Mold quick check (top)-Ex
13

Assemble mold (top)-In

Identify internal/external activities

Puller setting-In

Convert internal activities to
external activities

Folding pressure setting-In


Apply 5S

Carrier clamp setting-In

Jig approach

Feed rate setting-In

Pressure setting

Main pressure setting-In

Changeover time evaluation after
implementing kaizen and SMED

Test run-In

17

Secure mold-In


15

Mould alignment (base)-In

(a)

(b)

(c)

(e)

(d)

(f)

A

A


B