30 Jenis Pekerjaan : Penghamparan Latasir Kelas B SS-B tebal 20 mm
Satuan Pekerjaan : m2
A. Upah Tenaga 1. Pekerja
L.01 OH
0,0062 55.000,00
340,16 2. Mandor
L.04 OH
0,0009 80.000,00
70,68 410,84
B. B a h a n 1. Produksi agregat kasar terkirim ke lokasi pekerjaan
M3 0,0139
274.938,05 3.828,04
2. Pasir beton quarry - base camp M.8
M3 0,0139
253.600,00 3.530,95
3. Portland cement M.483
Kg 1,3860
1.475,00 2.044,35
4. Aspal curah M.842
Kg 4,0788
10.510,00 42.868,19
52.271,53 C. Peralatan
1. Wheel loader 1,0-1,6 m³ E.40
jam 0,0003
381.426,00 132,16
2. Asphalt Mixing Plant E.3
jam 0,0009
8.699.511,00 7.686,31
3. Generator set 135 KVA E.25
jam 0,0009
479.785,00 423,91
4. Dump truck 20 ton E.21
jam 0,0099
636.984,00 6.289,11
5. Asphalt Finisher E.2
jam 0,0013
692.044,00 882,32
6. Tandem roller 6-8 ton E.32
jam 0,0013
436.343,00 547,62
7. Pneumatic tire roller 8-10 ton E.30
jam 0,0004
472.455,00 169,60
8. Alat bantu E.45
set 0,0040
50.000,00 200,00
16.331,03 D
22.620,14 E
10 x D 2.262,01
F 24.882,00
31 Jenis Pekerjaan : Penghamparan HRS-WC hot roller sheet wearing course tebal 3,0 cm tanpa finisher
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,0864 55.000,00
4.752,00 2. Mandor
L.04 OH
0,0160 80.000,00
1.280,00 6.032,00
B. B a h a n 1. Produksi batu pecah 05-15 mm
m³ 0,0163
197.941,18 3.226,44
2. Produksi batu pecah 00-05 mm m³
0,0104 197.941,18
2.058,59 3. Pasir beton quarry - base camp
M.8 m³
0,0167 253.600,00
4.235,12 4. Portland cement
M.483 kg
1,5454 1.475,00
2.279,47 5. Aspal curah
kg 4,6857
10.510,00 49.246,71
61.046,32 C. Peralatan
1. Wheel loader 1,0-1,6 m³ E.40
jam 0,0000
381.426,00 3,89
2. Asphalt Mixing Plant E.3
jam 0,0019
8.699.511,00 16.529,07
3. Generator set 135 KVA E.25
jam 0,0019
479.785,00 911,59
4. Dump truck 7,5 ton E.22
jam 0,0139
322.111,00 4.477,34
5 Vibratory roller 1 ton E.36
jam 0,0264
91.996,00 2.428,69
6 Alat bantu E.45
set 0,0650
50.000,00 3.250,00
27.600,59 D
94.678,91 E
10 x D 9.467,89
F 104.146,00
E. PEKERJAAN PAVING BLOK
1. Jenis Pekerjaan
: Pasang paving block abu² trotoar, K-200 t=6 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2400 55.000,00
13.200,00 2. Tukang batu
L.02a OH
0,0800 70.000,00
5.600,00 3. Mandor
L.04 OH
0,0400 80.000,00
3.200,00 22.000,00
B. B a h a n 1. Paving block 6 cm abu-abu K-200
M.251 m²
1,0000 65.000,00
65.000,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 75.800,00
C. Peralatan 1. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 1.250,00
D 99.050,00
E 10 x D
9.905,00 F
108.955,00
Jumlah Rp.
Jumlah Harga Upah Tenaga
Jumlah Harga Bahan
Koefisien
Jumlah Harga Peralatan
Satuan
Overhead Profit Harga Satuan Pekerjaan D+E
Harga Satuan Rp.
U r a i a n
Jumlah A+B+C
Jumlah Harga Upah Tenaga
Harga Satuan Rp.
Kode
Jumlah Harga Bahan
Jumlah Rp.
U r a i a n Satuan
Jumlah Harga Peralatan
Satuan
Overhead Profit
Koefisien Harga Satuan
Rp. Jumlah
Rp.
Jumlah Harga Peralatan
Harga Satuan Pekerjaan D+E Jumlah A+B+C
Overhead Profit Harga Satuan Pekerjaan D+E
U r a i a n Kode
Koefisien Kode
Jumlah Harga Upah Tenaga
Jumlah Harga Bahan
Jumlah A+B+C
halaman 32
2. Jenis Pekerjaan : Pasang paving block warna trotoar, K-200 t=6 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2400 55.000,00
13.200,00 2. Tukang batu
L.02a OH
0,0800 70.000,00
5.600,00 3. Mandor
L.04 OH
0,0400 80.000,00
3.200,00 22.000,00
B. B a h a n 1. Paving block 6 cm warna K-200
M.252 m²
1,0000 72.000,00
72.000,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 82.800,00
C. Peralatan 1. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 1.250,00
D 106.050,00
E 10 x D
10.605,00 F
116.655,00 3. Jenis Pekerjaan
: Pasang paving block lama trotoar
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,4290 55.000,00
23.595,00 2. Tukang batu
L.02a OH
0,2000 70.000,00
14.000,00 3. Mandor
L.04 OH
0,0430 80.000,00
3.440,00 41.035,00
B. B a h a n 1. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 10.800,00
C. Peralatan 1. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 1.250,00
D 53.085,00
E 10 x D
5.308,50 F
58.393,00 4. Jenis Pekerjaan
: Pasang paving block abu² jalan lingkungan, K-300 t=6 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2400 55.000,00
13.200,00 2. Tukang batu
L.02a OH
0,0800 70.000,00
5.600,00 3. Mandor
L.04 OH
0,0400 80.000,00
3.200,00 22.000,00
B. B a h a n 1. Paving block 6 cm abu-abu K-300
M.253 m²
1,0000 77.725,00
77.725,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 88.525,00
C. Peralatan 1. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 1.250,00
D 111.775,00
E 10 x D
11.177,50 F
122.952,00 5. Jenis Pekerjaan
: Pasang paving block warna jalan lingkungan, K-300 t=6 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2400 55.000,00
13.200,00 2. Tukang batu
L.02a OH
0,0800 70.000,00
5.600,00 3. Mandor
L.04 OH
0,0400 80.000,00
3.200,00 22.000,00
B. B a h a n 1. Paving block 6 cm warna K-300
M.254 m²
1,0000 93.725,00
93.725,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 104.525,00
C. Peralatan 1. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 1.250,00
D 127.775,00
E 10 x D
12.777,50 F
140.552,00 Jumlah Harga Peralatan
Jumlah A+B+C
Jumlah Rp.
Jumlah Rp.
Jumlah Harga Upah Tenaga
Jumlah Rp.
Jumlah Rp.
Kode
Jumlah Harga Upah Tenaga
Kode
Harga Satuan Rp.
Satuan Harga Satuan
Rp.
Kode
Kode
Harga Satuan Rp.
Jumlah Harga Peralatan Overhead Profit
Harga Satuan Pekerjaan D+E Jumlah A+B+C
U r a i a n
Jumlah Harga Upah Tenaga
Jumlah Harga Peralatan Jumlah A+B+C
Overhead Profit Harga Satuan Pekerjaan D+E
Jumlah Harga Peralatan
Harga Satuan Rp.
U r a i a n
Jumlah Harga Bahan
Koefisien U r a i a n
Jumlah A+B+C Harga Satuan Pekerjaan D+E
Jumlah Harga Bahan
Satuan
Koefisien
Overhead Profit
U r a i a n
Jumlah Harga Bahan
Overhead Profit Harga Satuan Pekerjaan D+E
Jumlah Harga Upah Tenaga
Satuan Koefisien
Satuan
Jumlah Harga Bahan
Koefisien
halaman 33
6. Jenis Pekerjaan
: Pasang paving block lama jalan lingkungan
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,4290 55.000,00
23.595,00 2. Tukang batu
L.02a OH
0,2000 70.000,00
14.000,00 3. Mandor
L.04 OH
0,0430 80.000,00
3.440,00 41.035,00
B. B a h a n 1. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 10.800,00
C. Peralatan 1. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 1.250,00
D 53.085,00
E 10 x D
5.308,50 F
58.393,00 7. Jenis Pekerjaan
: Pasang paving block abu² jalan lokal, K-300 t=8 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2400 55.000,00
13.200,00 2. Tukang batu
L.02a OH
0,0800 70.000,00
5.600,00 3. Mandor
L.04 OH
0,0400 80.000,00
3.200,00 22.000,00
B. B a h a n 1. Paving block 8 cm abu-abu K-300
M.255 m²
1,0000 106.550,00
106.550,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 117.350,00
C. Peralatan 1. Vibratory plate tamper
E.35 jam
0,0240 48.839,00
1.172,14 2. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 2.422,14
D 141.772,14
E 10 x D
14.177,21 F
155.949,00 8. Jenis Pekerjaan
: Pasang paving block warna jalan lokal, K-300 t=8 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2400 55.000,00
13.200,00 2. Tukang batu
L.02a OH
0,0800 70.000,00
5.600,00 3. Mandor
L.04 OH
0,0400 80.000,00
3.200,00 22.000,00
B. B a h a n 1. Paving block 8 cm warna K-300
M.256 m²
1,0000 122.550,00
122.550,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 133.350,00
C. Peralatan 1. Vibratory plate tamper
E.35 jam
0,0240 48.839,00
1.172,14 2. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 2.422,14
D 157.772,14
E 10 x D
15.777,21 F
173.549,00 Harga Satuan Pekerjaan D+E
Jumlah Rp.
Harga Satuan Rp.
Jumlah Harga Bahan Jumlah Harga Upah Tenaga
Satuan Harga Satuan
Rp. Kode
Satuan Koefisien
U r a i a n
Jumlah Rp.
Jumlah A+B+C Overhead Profit
Jumlah Harga Peralatan Jumlah A+B+C
Overhead Profit
Harga Satuan Rp.
Jumlah Harga Peralatan
Koefisien Jumlah
Rp.
Jumlah A+B+C
Kode
Jumlah Harga Upah Tenaga Jumlah Harga Bahan
Overhead Profit Harga Satuan Pekerjaan D+E
U r a i a n
Jumlah Harga Upah Tenaga
U r a i a n
Jumlah Harga Peralatan Jumlah Harga Bahan
Kode Koefisien
Satuan
Harga Satuan Pekerjaan D+E
halaman 34
9. Jenis Pekerjaan : Pasang paving block lama jalan lokal
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,5000 55.000,00
27.500,00 2. Tukang batu
L.02a OH
0,2500 70.000,00
17.500,00 3. Mandor
L.04 OH
0,0500 80.000,00
4.000,00 49.000,00
B. B a h a n 1. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 10.800,00
C. Peralatan 1. Vibratory plate tamper
E.35 jam
0,0240 48.839,00
1.172,14 2. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 2.422,14
D 62.222,14
E 10 x D
6.222,21 F
68.444,00 10. Jenis Pekerjaan
: Pasang paving block abu² jalan kolektor, K-400 t=8 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2500 55.000,00
13.750,00 2. Tukang batu
L.02a OH
0,1000 70.000,00
7.000,00 3. Mandor
L.04 OH
0,0100 80.000,00
800,00 4. Operator alat berat
L.06 OH
0,0100 170.000,00
1.700,00 23.250,00
B. B a h a n 1. Paving block 8 cm abu-abu K-400
M.257 m²
1,0000 123.500,00
123.500,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 134.300,00
C. Peralatan 1. Vibratory roller 1 ton
E.36 jam
0,0240 91.996,00
2.207,90 2. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 3.457,90
D 161.007,90
E 10 x D
16.100,79 F
177.108,00 11. Jenis Pekerjaan
: Pasang paving block warna jalan kolektor, K-400 t=8 cm
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2500 55.000,00
13.750,00 2. Tukang batu
L.02a OH
0,1000 70.000,00
7.000,00 3. Mandor
L.04 OH
0,0100 80.000,00
800,00 4. Operator alat berat
L.06 OH
0,0100 170.000,00
1.700,00 23.250,00
B. B a h a n 1. Paving block 8 cm warna K-400
M.258 m²
1,0000 139.000,00
139.000,00 2. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 149.800,00
C. Peralatan 1. Vibratory roller 1 ton
E.36 jam
0,0240 91.996,00
2.207,90 2. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 3.457,90
D 176.507,90
E 10 x D
17.650,79 F
194.158,00
Satuan
Jumlah A+B+C Jumlah Harga Peralatan
Jumlah Harga Peralatan Jumlah A+B+C
Jumlah Harga Upah Tenaga Jumlah Harga Bahan
Koefisien U r a i a n
Jumlah Harga Upah Tenaga Jumlah Harga Bahan
Jumlah A+B+C
U r a i a n
Kode Harga Satuan
Rp. Jumlah
Rp.
Harga Satuan Rp.
Satuan
Harga Satuan Pekerjaan D+E Overhead Profit
Overhead Profit
Kode
Jumlah Rp.
Jumlah Harga Bahan Harga Satuan Pekerjaan D+E
Harga Satuan Rp.
Jumlah Harga Peralatan
Harga Satuan Pekerjaan D+E
U r a i a n Satuan
Jumlah Harga Upah Tenaga
Koefisien Kode
Jumlah Rp.
Koefisien
Overhead Profit
halaman 35
12. Jenis Pekerjaan : Pasang paving block lama jalan kolektor
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,5000 55.000,00
27.500,00 2. Tukang batu
L.02a OH
0,2500 70.000,00
17.500,00 3. Mandor
L.04 OH
0,0500 80.000,00
4.000,00 4. Operator alat berat
L.06 OH
0,0030 170.000,00
510,00 49.510,00
B. B a h a n 1. Pasir pasang
M.26 m³
0,0720 150.000,00
10.800,00 10.800,00
C. Peralatan 1. Vibratory roller 1 ton
E.36 jam
0,0240 91.996,00
2.207,90 2. Alat bantu
E.45 set
0,0250 50.000,00
1.250,00 3.457,90
D 63.767,90
E 10 x D
6.376,79 F
70.144,00 13. Jenis Pekerjaan
: Bongkar paving block
Satuan Pekerjaan : m²
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2145 55.000,00
11.797,50 2. Tukang batu
L.02a OH
0,1000 70.000,00
7.000,00 3. Mandor
L.04 OH
0,0215 80.000,00
1.720,00 20.517,50
B. B a h a n -
C. Peralatan 1. Alat bantu
E.45 set
0,0125 50.000,00
625,00 625,00
D 21.142,50
E 10 x D
2.114,25 F
23.256,00 14. Jenis Pekerjaan
: Pasang kerb tipe A 1316x30x50
Satuan Pekerjaan : m¹
A. Upah Tenaga 1. Pekerja
L.01 OH
0,0920 55.000,00
5.060,00 2. Tukang batu
L.02a OH
0,0200 70.000,00
1.400,00 3. Mandor
L.04 OH
0,0090 80.000,00
720,00 7.180,00
B. B a h a n 1. Kerb 1316x30x50 K-200 tipe A
M.260 bh
2,0000 39.000,00
78.000,00 2. Pasir pasang
M.26 m³
0,0128 150.000,00
1.920,00 3. Portland cement
M.483 kg
1,4314 1.475,00
2.111,32 82.031,32
C. Peralatan 1 Alat bantu
E.45 set
0,0100 50.000,00
500,00 500,00
D 89.711,32
E 10 x D
8.971,13 F
98.682,00 15. Jenis Pekerjaan
: Pasang kerb tipe A 1316x30x50 lama
Satuan Pekerjaan : m¹
A. Upah Tenaga 1. Pekerja
L.01 OH
0,0920 55.000,00
5.060,00 2. Tukang batu
L.02a OH
0,0200 70.000,00
1.400,00 3. Mandor
L.04 OH
0,0090 80.000,00
720,00 7.180,00
B. B a h a n 1. Pasir pasang
M.26 m³
0,0128 150.000,00
1.920,00 2. Portland cement
M.483 kg
1,4314 1.475,00
2.111,32 4.031,32
C. Peralatan 1 Alat bantu
E.45 set
0,0100 50.000,00
500,00 500,00
D 11.711,32
E 10 x D
1.171,13 F
12.882,00
Kode Kode
Jumlah Harga Peralatan Jumlah A+B+C
Harga Satuan Rp.
Jumlah Rp.
Jumlah Rp.
Jumlah Rp.
Jumlah Harga Upah Tenaga Jumlah Harga Bahan
Jumlah Harga Bahan
U r a i a n
Overhead Profit Harga Satuan Pekerjaan D+E
Kode
Jumlah Harga Peralatan
Harga Satuan Rp.
Satuan U r a i a n
Jumlah Rp.
Koefisien Kode
Jumlah Harga Bahan Jumlah Harga Peralatan
Jumlah A+B+C
Satuan
Koefisien Harga Satuan
Rp.
Jumlah Harga Upah Tenaga
Overhead Profit Harga Satuan Pekerjaan D+E
Satuan U r a i a n
Koefisien
Harga Satuan Pekerjaan D+E
Satuan Koefisien
Jumlah Harga Upah Tenaga
Jumlah A+B+C
U r a i a n
Overhead Profit
Harga Satuan Rp.
Jumlah Harga Upah Tenaga Jumlah Harga Bahan
Jumlah Harga Peralatan Jumlah A+B+C
Overhead Profit Harga Satuan Pekerjaan D+E
halaman 36
16. Jenis Pekerjaan : Pasang kerb tipe B 1821x30x50
Satuan Pekerjaan : m¹
A. Upah Tenaga 1. Pekerja
L.01 OH
0,0920 55.000,00
5.060,00 2. Tukang batu
L.02a OH
0,0200 70.000,00
1.400,00 3. Mandor
L.04 OH
0,0090 80.000,00
720,00 7.180,00
B. B a h a n 1. Kerb 1821x30x50 K-200 tipe B
M.261 bh
2,0000 56.000,00
112.000,00 2. Pasir pasang
M.26 m³
0,0161 150.000,00
2.415,00 3. Portland cement
M.483 kg
1,8403 1.475,00
2.714,44 117.129,44
C. Peralatan 1 Alat bantu
E.45 set
0,0100 50.000,00
500,00 500,00
D 124.809,44
E 10 x D
12.480,94 F
137.290,00 17. Jenis Pekerjaan
: Pasang kerb tipe B 1821x30x50 lama
Satuan Pekerjaan : m¹
A. Upah Tenaga 1. Pekerja
L.01 OH
0,0920 55.000,00
5.060,00 2. Tukang batu
L.02a OH
0,0200 70.000,00
1.400,00 3. Mandor
L.04 OH
0,0090 80.000,00
720,00 7.180,00
B. B a h a n 1. Pasir pasang
M.26 m³
0,0161 150.000,00
2.415,00 2. Portland cement
M.483 kg
1,8403 1.475,00
2.714,44 5.129,44
C. Peralatan 1 Alat bantu
E.45 set
0,0100 50.000,00
500,00 500,00
D 12.809,44
E 10 x D
1.280,94 F
14.090,00 18. Jenis Pekerjaan
: Pasang kanstin K-200, 10x20x50 cm
Satuan Pekerjaan : m¹
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2860 55.000,00
15.730,00 2. Tukang batu
L.02a OH
0,0710 70.000,00
4.970,00 3. Mandor
L.04 OH
0,0360 80.000,00
2.880,00 23.580,00
B. B a h a n 1. Kanstin K-200, 10x20x50 cm
M.259 buah
2,0000 17.250,00
34.500,00 2. Pasir pasang
M.26 m³
0,0061 150.000,00
915,00 3. Portland cement
M.483 kg
0,5453 1.475,00
804,32 36.219,32
C. Peralatan 1 Alat bantu
E.45 set
0,0100 50.000,00
500,00 500,00
D 60.299,32
E 10 x D
6.029,93 F
66.329,00
U r a i a n Jumlah
Rp.
U r a i a n Jumlah
Rp.
Jumlah Rp.
Satuan Satuan
Harga Satuan Rp.
U r a i a n Koefisien
Jumlah Harga Bahan Jumlah Harga Peralatan
Jumlah A+B+C
Harga Satuan Rp.
Kode
Koefisien
Overhead Profit Harga Satuan Pekerjaan D+E
Kode
Jumlah Harga Peralatan Jumlah A+B+C
Overhead Profit Harga Satuan Pekerjaan D+E
Jumlah Harga Peralatan
Harga Satuan Rp.
Koefisien
Jumlah Harga Upah Tenaga
Jumlah Harga Bahan
Satuan
Jumlah A+B+C Jumlah Harga Upah Tenaga
Jumlah Harga Bahan
Kode
Overhead Profit Harga Satuan Pekerjaan D+E
Jumlah Harga Upah Tenaga
halaman 37
19. Jenis Pekerjaan : Pasang kanstin K-200, 10x20x50 cm lama
Satuan Pekerjaan : m¹
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2860 55.000,00
15.730,00 2. Tukang batu
L.02a OH
0,0710 70.000,00
4.970,00 3. Mandor
L.04 OH
0,0360 80.000,00
2.880,00 23.580,00
B. B a h a n 1. Pasir pasang
M.26 m³
0,0061 150.000,00
915,00 2. Portland cement
M.483 kg
0,5453 1.475,00
804,32 1.719,32
C. Peralatan 1 Alat bantu
E.45 set
0,0100 50.000,00
500,00 500,00
D 25.799,32
E 10 x D
2.579,93 F
28.379,00 20. Jenis Pekerjaan
: Bongkar kerb kanstin
Satuan Pekerjaan : m¹
A. Upah Tenaga 1. Pekerja
L.01 OH
0,0690 55.000,00
3.795,00 2. Tukang batu
L.02a OH
0,0155 70.000,00
1.085,00 3. Mandor
L.04 OH
0,0070 80.000,00
560,00 5.440,00
B. B a h a n -
C. Peralatan 1. Alat bantu
E.45 set
0,0050 50.000,00
250,00 250,00
D 5.690,00
E 10 x D
569,00 F
6.259,00 21. Jenis Pekerjaan
: Pemasangan batu sikat tebal 3 cm
Satuan Pekerjaan : m2
A. Upah Tenaga 1. Pekerja
L.01 OH
0,2000 55.000,00
11.000,00 2. Tukang batu
L.02a OH
0,1500 70.000,00
10.500,00 3. Kepala Tukang
L.03 OH
0,0150 80.000,00
1.200,00 4. Mandor
L.04 OH
0,0100 80.000,00
800,00 23.500,00
B. B a h a n 1. Portland cement
M.483 kg
15,5520 1.475,00
22.939,20 2. Pasir beton quarry - lokasi pekerjaan
M.9 m³
0,0460 276.600,00
12.723,60 3. Batu sikat
M.59 kg
25,0000 3.500,00
87.500,00 123.162,80
C. Peralatan 1. Alat bantu
E.45 set
0,0040 50.000,00
200,00 200,00
D 146.862,80
E 10 x D
14.686,28 F
161.549,00
Satuan U r a i a n
U r a i a n
Jumlah Harga Peralatan Harga Satuan Pekerjaan D+E
Jumlah Harga Peralatan
Jumlah Rp.
Jumlah Rp.
Koefisien Koefisien
Harga Satuan Rp.
Kode
Koefisien Harga Satuan
Rp. Jumlah
Rp.
Jumlah A+B+C Overhead Profit
Jumlah Harga Upah Tenaga Jumlah Harga Bahan
Jumlah Harga Upah Tenaga Harga Satuan Pekerjaan D+E
Kode
Jumlah A+B+C Overhead Profit
Jumlah Harga Upah Tenaga
Satuan
Overhead Profit
Harga Satuan Rp.
U r a i a n
Jumlah Harga Bahan
Satuan
Harga Satuan Pekerjaan D+E Jumlah Harga Peralatan
Jumlah A+B+C
Kode
Jumlah Harga Bahan
halaman 38
F. PEKERJAAN BETON