Pembangkit PLN PLNS POWER PLANT Pembangkit Listrik Non PLN PRIVATES POWER

TABEL 1 SARANA PENYEDIAAN TENAGA LISTRIK NASIONAL NATIONAL ELECTRICITY SUPPLY FACILITIES U R A I A N D E S C R I P T I O N 2003 2004 2005 2006 2007 I. PEMBANGKIT POWER PLANT MW 25,139.47 26,424.15 26,601.66 29,738.87 30,300.17

a. Pembangkit PLN PLNS POWER PLANT

MW 21,206.33 22,340.59 22,515.10 24,846.21 25,223.49

b. Pembangkit Listrik Non PLN PRIVATES POWER

MW 3,933.14 4,083.56 4,086.56 4,892.66 5,076.68 - IPP MW 3,418.14 3,568.56 3,571.56 4,377.66 4,561.68 - Batamindo MW 115.00 115.00 115.00 115.00 115.00 - Krakatau Daya listrik MW 400.00 400.00 400.00 400.00 400.00 II. SARANA TRANSMISI PLN PLNS TRANSMISSION LINES - Transmisi TET 500 kV TL EHVTL kms 3,207.00 3,578.27 3,578.27 5,047.78 5,047.78 - Transmisi TT 25 kV s.d 150 kV TL HVTL kms 24,565.33 27,215.70 27,367.21 27,869.05 28,115.09 GARDU INDUK SUB STATION - Kapasitas Transformer Capacity MVA 53,400.00 54,128.00 53,976.00 54,527.00 58,713.00 - Jumlah Gardu Units unit 1,121.00 1,129.00 1,080.00 1,101.00 1,136.00 III. SARANA DISTRIBUSI PLN PLNS DISTRIBUTION LINES kms - J T M Medium Voltage 6 - 20 kV kms 233,388.15 236,386.36 239,384.16 246,775.43 253,908.02 - J T R Low Voltage 6 kV kms 313,828.78 322,702.79 324,454.18 326,274.01 344,589.67 GARDU DISTRIBUSI DISTRIBUTION SUBSTATION - Kapasitas Transformer Capacity MVA 30,255.52 30,595.13 31,734.42 32,873.70 33,826.37 - Jumlah Gardu Units unit 230,841.00 241,394.00 254,966.00 259,444.00 279,454.00 P L T NON - BBM NON OIL FIRED PP TAHUN PLTU-M PLTD PLTG-M PLTGU-M PLTA PLTP PLTU-B PLTU-G YEAR STEAM DIESEL OIL FIRED COMBINED HYDRO GEOTHER - STEAM STEAM OIL PP PP GAS TUR- CYCLE PP PP MAL PP COAL PP NATURAL BINE PP GAS PP 2003 1,155.00 2,730.60 1,082.27 2,737.98 3,167.78 805.00 7,640.00 955.00 2004 1,155.00 2,993.60 1,356.52 2,435.73 3,199.45 820.00 7,640.00 955.00 2005 6,770.00 3,042.12 1,865.63 6,220.97 3,220.96 820.00 2,980.00 - 2006 6,770.00 3,001.49 1,869.22 6,960.97 3,529.11 820.00 4,900.00 - 2007 6,984.00 3,069.77 1,925.63 6,960.97 3,506.54 932.50 5,030.00 - P L T BBMOIL FIRED PP Tidak termasuk captive power Not included captive power Tidak termasuk captive power dan listrik swasta Not included captive power and private power PLTG-G PLTGU-G PLTM-G PLTM PLTMH PLT Bayu JUMLAH NATURAL COMBINED MACHINE MINIHYDRO MICROHYDRO WIND POWER TOTAL GAS CYCLE PP GAS TURBINE PP 605.45 4,260.24 - -

0.14 -

25,139.46 1,446.05 4,410.54 12.00 - 0.26 - 26,424.15 1,321.00 345.00

12.42 3.00