PROYEK PEMBANGUNAN APARTEMENT & CONDOTEL MARQUIS DE LAFAYETTE SEMARANG KONSENTRASI: MANAJEMEN - Unika Repository

  Laporan Akhir Praktek Kerja PROYEK PEMBANGUNAN APARTEMENT & CONDOTEL MARQUIS DE LAFAYETTE SEMARANG

  KONSENTRASI: MANAJEMEN Disusun Oleh:

  Karina Riezki Putri 12.12.0018

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS KATOLIK SOEGIJAPRANATA 2016

  

Lembar Pengesahan Praktek Kerja

PROYEK PEMBANGUNAN APARTEMENT & CONDOTEL

  

MARQUIS DE LAFAYETTE

SEMARANG

  KONSENTRASI: MANAJEMEN Disusun Oleh:

  Karina Riezki Putri 12.12.0018

  Telah diperiksa dan setujui, Semarang, ………………………

  Ketua Program Studi Teknik Sipil Dosen Pembimbing ( Daniel Hartanto, ST., MT. ) ( Ir.Budi Setiyadi, MT )

LAMPIRAN KEPUTUSAN REKTOR UNIVERSITAS KATOLIK SOEGIJAPRANATA

  Nomor : 0047/SK.rek/X/2013 Tanggal : 07 Oktober 2013

  Tentang : PERNYATAAN KEASLIAN LAPORAN PRAKTIK KERJA PROYEK PEMBANGUNAN APARTEMENT & CONDOTEL MARQUIS DE

LAFAYETTE SEMARANG

  Dengan ini saya menyatakan bahwa dalam Laporan Praktek Kerja yang berjudul “PROYEK PEMBANGUNAN APARTEMENT & CONDOTEL MARQUIS DE

  

LAFAYETTE SEMARANG” ini tidak terdapat karya yang pernah diajukan untuk

  memperoleh gelar kesarjanaan di suatu perguruan tinggi, dan sepanjang pengetahuan saya juga tidak terdapat karya atau pendapat yang pernah ditulis atau diterbitkan oleh orang lain kecuali yang secara tertulis diacu dalam naskah ini dan disebutkan dalam daftar pustaka. Apabila di kemudian hari ternyata terbukti bahwa laporan ini sebagian atau seluruhnya merupakan hasil plagiasi, maka saya rela untuk dibatalkan, dengan segala akibat hukumnya sesuai peraturan yang berlaku pada Universitas Katolik Soegijapranata dan/atau peraturan perundang- undangan yang berlaku.

  Semarang, 2016 (Karina Riezki Putri)

  NIM: 12.12.0018

KATA PENGANTAR

  Puji dan syukur kepada Tuhan yang Maha Esa atas kesempatan dan berkat yang telah diberikan-Nya kepada penulis sehingga penulis dapat menyelesaikan pembuatan laporan Praktek Kerja ini dengan baik dan selesai pada waktunya serta sesuai dengan ketentuan yang berlaku.

  Laporan Praktek Kerja yang berjudul “PROYEK PEMBANGUNAN

  

APARTEMENT & CONDOTEL MARQUIS DE LAFAYETTE SEMARANG” ini

  disusun sebagai syarat untuk menempuh kegiatan perkuliahan serta memperoleh gelar kesarjanaan pada bidang studi Teknik Sipil Universitas Katolik Soegijapranata. Selain itu, laporan ini juga dibuat dengan maksud untuk menyampaikan ilmu yang telah kami terima dan serap dalam masa Praktek Kerja

  1 September 2015 – 31 Novenber 2015 yang lalu, tentang cara kerja pelaksanaan pekerjaan konstruksi hingga penyelesaian masalah konstruksi yang ditemui selama periode Praktek Kerja tersebut.

  Di lain hal, dalam kesempatan ini pula penulis berkenan untuk mengucapkan terima kasih kepada: a.

  Bapak Ir. Budi Setiyadi, MT yang telah membimbing penulis dalam kegiatan lapangan dan penulisan laporan praktek kerja selama 1 September 2015 – 31 Novenber 2015 serta telah memberikan banyak masukan sebagai dosen wali mahasiswa/i Teknik Sipil angkatan 2012.

  b.

  Bapak Ryan Florenda, ST (SEM) yang telah bersedia membimbing penulis selama kegiatan praktek kerja di lapangan berlangsung serta memberikan banyak ilmu dan pengetahuan lapangan yang tidak kami terima di bangku perkuliahan.

  c.

  Bapak Fahmi, Ibu Sri, Bapak Irawan, Bapak Sunaryo, Bapak Isro, Bapak Gani serta semua pihak yang tergabung dalam pelaksanaan proyek pembangunan

  Apartement & Condotel Marquis De Lafayette Semarang yang telah memberikan pengetahuan mengenai dunia konstruksi. d.

  Ferista Dea Caresa, yang telah bersama-sama dengan penulis dalam mengumpulkan serta mengolah data yang didapat dalam kegiatan praktek kerja lalu periode 1 September 2015 – 31 Novenber 2015.

  Seluruh pihak yang telah tersebutkan maupun yang tidak sempat tersebut di atas telah mendukung penulis dan berpartisipasi besar dalam proses pembuatan laporan praktek kerja ini dari awal hingga akhir.

  Penulis menyadari akan banyaknya kekurangan dalam laporan praktek kerja ini. Oleh karena itu, penulis memohon kritik dan saran membangun yang dapat digunakan sebagai bahan untuk memajukan penulis di kesempatan selanjutnya. Akhir kata, semoga laporan ini dapat bermanfaat bagi pembaca sekalian.

  Penulis

KARTU ASISTENSI

PERMOHONAN IJIN PRAKTEK KERJA

SURAT IJIN PRAKTEK KERJA DARI PROYEK

SURAT PERINTAH KERJA

BIMBINGAN KERJA PRAKTEK

KETERANGAN SELESAI KERJA PRAKTEK

UCAPAN TERIMA KASIH

  DAFTAR ISI HALAMAN JUDUL ········································································· i

LEMBAR PENGESAHAN ································································ ii

SURAT PERNYATAAN ··································································· iii

KATA PENGANTAR ······································································· iv

KARTU ASISTENSI ········································································ vi

SURAT PERMOHONAN IJIN PRAKTEK KERJA ································· vii

SURAT IJIN PRAKTEK KERJA DARI PROYEK ·································· viii

SURAT PERINTAH KERJA ······························································ ix

SURAT BIMBINGAN KERJA PRAKTEK ············································ x

SURAT KETERANGAN SELESAI KERJA PRAKTEK ··························· xi

SURAT UCAPAN TERIMA KASIH ···················································· xii

DAFTAR ISI ·················································································· xiii

DAFTAR TABEL ············································································ xv

DAFTAR GAMBAR ········································································ xvi

  BAB I PENDAHULUAN ··································································

  1

  1.1

  1 Latar Belakang Praktik Kerja ···············································

  1.2

  1 Latar Belakang Proyek ·······················································

  1.3

  2 Lokasi Proyek ·································································

  1.4

  3 Data Administrasi Proyek ···················································

  1.5

  4 Data Teknis Proyek ··························································

  1.6

  5 Tujuan Praktik Kerja ·························································

  1.7

  6 Pembatasan Masalah ·························································

  1.8

  6 Pengumpulan Data ···························································

  1.9

  7 Tata Cara Pelelangan ·························································

  BAB II PENGELOLA PROYEK ························································

  9

  2.1

  9 Pemilik Proyek ································································

  2.2

  9 Konsultan Perencana ·························································

  2.3

  11 Pelaksana Proyek ·····························································

  2.4

  22 Konsultan Pengawas ·························································

BAB III PELAKSANAAN ································································

  24

  3.1

  24 Metode Pelaksanaan Pekerjaan ·············································

  3.2

  24 Rencana Kerja ·································································

  3.2.1 Network Planning ······················································

  26

  3.2.2 Kurva S ··································································

  26

  3.3

  27 Sistem Kerja Proyek ··························································

  3.4

  27 Keamanan dan Keselamatan Kerja (K3)···································

  3.5

  31 Pekerjaan Struktur Atas ······················································

  3.5.1 Kolom ···································································

  32

  3.5.2 Shear Wall (Dinding Geser) ··········································

  37

  3.5.3 Balok dan Pelat Lantai ················································

  41

  3.5.4 Tangga ···································································

  51

  3.5.5 Dinding Parapet ·······················································

  55

  3.6

  58 Alat-Alat Kerja ································································

  3.7

  68 Bahan – Bahan ································································

  3.8

  74 Sistem Pengawasan dan Pengendalian Proyek ····························

  3.8.1 Pengendalian Mutu (Quality Control) ······························

  74

  3.8.2 Pengendalian Biaya (Budget Control)·······························

  77

  3.8.3 Pengendalian Waktu (Time Control) ································

  78

  3.8.4 Pengendalian Sumber Daya Manusia ·······························

  80

  3.9

  81 Permasalahan dan Pemecahannya ··········································

  3.9.1 Faktor Alam ····························································

  81

  3.9.2 Faktor Manusia ·························································

  82

  3.9.3 Faktor Alat ······························································

  88 BAB IV PENUTUP ··········································································

  89

  4.1

  89 Kesimpulan ····································································

  4.2

  90 Saran ············································································

  DAFTAR PUSTAKA ········································································

  92 LAMPIRAN ···················································································

  DAFTAR TABEL Tabel 1.1 Luas bangunan Marquis De Lafayette tiap Lantai .....................................

  5 Tabel 3.1 Tabel kolom tower .....................................................................................

  31 Tabel 3.2 Tabel kolom podium ..................................................................................

  32 Tabel 3.3 Tabel kolom transfer ..................................................................................

  32 Tabel 3.4 Tabel nilai slump test .................................................................................

  74

  DAFTAR GAMBAR Gambar 1.1 Peta Lokasi Proyek ................................................................................

  30 Gambar 3.12 Kolom ...................................................................................................

  42 Gambar 3.24 Proses pemasangan bekisting balok .....................................................

  41 Gambar 3.23 Cek Bodeman .......................................................................................

  39 Gambar 3.22 Proses pemasangan perancah ..............................................................

  38 Gambar 3.21 Pengecoran Shear Wall .......................................................................

  37 Gambar 3.20 Bekisting Shear Wall yang sudah terpasang .......................................

  36 Gambar 3.19 Penulangan Shear Wall .......................................................................

  35 Gambar 3.18 Letak shear wall proyek pembangunan Marquis De Lafayette ..........

  34 Gambar 3.17 Pengecoran Kolom ..............................................................................................

  33 Gambar 3.16 Pemasangan Bekisting Kolom ............................................................

  33 Gambar 3.15 Pemasangan Besi Steck Kolom .......................................................................

  32 Gambar 3.14 Panjang Penyaluran Tulangan Kolom (4D) .........................................

  31 Gambar 3.13 Tulangan Kolom Yang Sudah di Fabrikasi ..........................................

  29 Gambar 3.11 Railing Pengaman dan Safety Net ........................................................

  2 Gambar 1.2 Viw Design Marquis De Lafayette Apartement & Condotel Semarang .

  29 Gambar 3.10 Penempatan Rambu K3 ........................................................................

  28 Gambar 3.9 Body Harness .........................................................................................

  28 Gambar 3.8 Sepatu Kerja (Safety Shoes) ...................................................................

  27 Gambar 3.7 Sarung Tangan .......................................................................................

  27 Gambar 3.6 Rompi .....................................................................................................

  27 Gambar 3.5 Masker ....................................................................................................

  26 Gambar 3.4 Safety Helmet..........................................................................................

  24 Gambar 3.3 Safety Talk ..............................................................................................

  23 Gambar 3.2 Akses Mobilitasi Proyek ........................................................................

  22 Gambar 3.1 Lay Out Marquis De Lafayette ...............................................................

  12 Gambar 2.3 Bagan Struktur Organisasi Konsultan Pengawas ...................................

  9 Gambar 2.2 Bagan Struktur Organisasi Kontraktor Pelaksana ..................................

  3 Gambar 2.1 Bagan Struktur Organisasi Pemilik Proyek (Owner) .............................

  42

Gambar 3.25 Pemasangan bekisting pelat konvensional ...........................................

  54 Gambar 3.41 Tulangan dinding parapet yang telah terpasang ...................................

  62 Gambar 3.53 Bekisting kolom (atas) dan balok (bawah) yang digunakan ................

  62 Gambar 3.52 Auto level ..............................................................................................

  62 Gambar 3.51 Theodolite .............................................................................................

  61 Gambar 3.50 Alat Bar Bender ...................................................................................

  60 Gambar 3.49 Perancah ...............................................................................................

  60 Gambar 3.48 Alat Gerinda Potong .............................................................................

  59 Gambar 3.47 Alat Trowel ...........................................................................................

  58 Gambar 3.46 Alat Air Compressor ............................................................................

  58 Gambar 3.45Concrete bucket .....................................................................................

  56 Gambar 3.44 Mesin Concrete Vibrator .....................................................................

  56 Gambar 3.43 Dinding parapet yang telah selesai dicor (tampak atas) .......................

  55 Gambar 3.42 Bekisting dinding parapet.....................................................................

  53 Gambar 3.40 Tangga yang sudah dicor......................................................................

  43 Gambar 3.26 Lubang pelat untuk bekisting dengan material steel deck ....................

  53 Gambar 3.39 Tulangan pelat tangga dan bordes yang telah terpasang ......................

  51 Gambar 3.38 Visualisasi penulangan pelat tangga dan anak tangga .........................

  51 Gambar 3.37 Bekisting pelat tangga yang sudah terpasang .......................................

  49 Gambar 3.36 Visualisasi pemasangan bekisting plat tangga dan bordes ...................

  49 Gambar 3.35 Proses pembongkaran bekisting secara bertahap .................................

  48 Gambar 3.34 Proses finishing setelah pengecoran selesai .........................................

  48 Gambar 3.33 Beton ready mix dengan penggaruk dan dipadatkan dengan menggunakan concrete vibrator ................................................................................

  48 Gambar 3.32 Ready mix yang keluar dari pipa baja ...................................................

  47 Gambar 3.31 Pembersihan area yang akan dicor menggunakan air compressor ......

  46 Gambar 3.30 Wiremesh M8-150 yang sudah terpasang pada pelat lantai .................

  45 Gambar 3.29 Proses pemasangan wiremesh M8-150 ................................................

  44 Gambar 3.28 Proses penulangan pada balok..............................................................

  44 Gambar 3.27 Bekisting pelat lantai yang sudah terpasang ........................................

  63

Gambar 3.54 Gerobak dorong ....................................................................................

  73 Gambar 3.70 Kawat pengikat (Bendrat) ....................................................................

  85 Gambar 3.82 Shear Wall masih keropos ketika bekisting dilepas .............................

  85 Gambar 3.81 Pembobokan pelat lantai yang terjadi di retak struktur ........................

  84 Gambar 3.80 Retak struktur pada pelat lantai ............................................................

  84 Gambar 3.79 Beton Yang Menyisakan Rongga .........................................................

  83 Gambar 3.78 Cetakan Belum Siap Cor ......................................................................

  82 Gambar 3.77 Balok Tidak Sesuai cetakan .................................................................

  82 Gambar 3.76 Contoh Surat Peringatan Untuk Pekerja Yang Tidak Menggunakan APD ............................................................................................................................

  82 Gambar 3.75 Pekerja yang tidak memakai helm proyek ...........................................

  75 Gambar 3.74 Body harness dan helm proyek yang tidak digunakan .........................

  75 Gambar 3.73 Uji Kuat Tekan Beton ..........................................................................

  75 Gambar 3.72 Sampel Beton Ready Mix .....................................................................

  73 Gambar 3.71 Slump Test ............................................................................................

  72 Gambar 3.69 Sumber air ............................................................................................

  64 Gambar 3.55 Tower crane .........................................................................................

  71 Gambar 3.68 Busa ......................................................................................................

  71 Gambar 3.67 Plywood ................................................................................................

  70 Gambar 3.66 Cakar ayam ...........................................................................................

  70 Gambar 3.65 Sunmortar Utama .................................................................................

  69 Gambar 3.64 Bata ringan ...........................................................................................

  69 Gambar 3.63 Beton Tahu ...........................................................................................

  68 Gambar 3.62 Beton Ready Mix ..................................................................................

  67 Gambar 3.61 Besi tulangan ........................................................................................

  67 Gambar 3.60 Semen Indocement ...............................................................................

  66 Gambar 3.59 Dump truck ...........................................................................................

  66 Gambar 3.58 Truk molen ...........................................................................................

  65 Gambar 3.57 Elevator ................................................................................................

  65 Gambar 3.56 Concrete pump jenis fixed ....................................................................

  86

  Proyek Pembangunan Marquis De Lafayette, Semarang

BAB I PENDAHULUAN

  1.1 Latar Belakang Praktik Kerja

  Kerja praktek pada Program Studi Teknik Sipil Fakultas Teknik UNIKA Soegijapranata adalah sebuah mata kuliah yang wajib dan salah satu syarat untuk menyelesaikan pendidikan S-1. Ilmu dan pengetahuan dasar telah banyak didapatkan di bangku perkuliahan, namun kegiatan belajar tidak cukup hanya bergantung pada perkuliahan di dalam kelas saja. Dengan mempelajari dan mengamati kondisi pelaksanaan pembangunan di lapangan secara langsung, sehingga dapat belajar dan mendapat pengalaman secara langsung pada lapangan.

  Kerja Praktek dilaksanakan 90 hari kalender. Dalam 90 hari kalender tersebut diharapkan dapat mempelajari secara langsung proses berjalannya suatu proyek mulai dari tahap bersosialisasi dengan pihak penyedia jasa konstruksi, persiapan pekerjaan, pelaksanaan, manajemen, penyelesaian permasalahan, dan hal-hal penting lainnya yang berkaitan dalam proses pengerjaan suatu konstruksi.

  1.2 Latar Belakang Proyek

  Semarang merupakan kota besar yang ada di Indonesia. Untuk mendukung pertumbuhan kota Semarang menjadi kota metropolitan di Indonesia dibutuhkan berbagaifasilitas pendukung diantaranya hotel, apartemen, mall dan sebagainya.

  Sebagai pemilik proyek PT. Pahala Agung membangun Apartemen dan Kondotel Marquis De Lafayette Semarang sebagai hunian dengan fasilitas lengkap dan lokasi yang terletak di Central Business District (CBD) Semarang.

  

Marquis De Lafayette Semarang memiliki total 645 unit apartemen dan 140 unit

  kondominium hotel (kondotel). Pembangunan Marquis De Lafayette Apartement

  

& Condotel Semarang merupakan proyek yang dikerjakan oleh PT. PP (Persero),

Dokumen yang terkait

PERENCANAAN PONDASI TIANG PANCANG PADA PEMBANGUNAN CONDOTEL M-SQUARE MALANG

3 34 16

ANALISIS PENYELESAIAN KLAIM PADA PROYEK PEMBANGUNAN CONDOTEL DEVASA SURABAYA

4 31 15

FAKTOR-FAKTOR PENGARUH MANAJEMEN RISIKO KONSTRUKSI PADA PROYEK PEMBANGUNAN WADUK BAJULMATI DI BANYUWANGI AKTOR PENGARUH MANAJEMEN RISIKOKONSTRUKSI PADA PROYEK PEMBANGUNAN AKTOR PENGARUH MANAJEMEN RISIKO KONSTRUKSI PADA PROYEK PEMBANGUNAN WADUK BAJULMATI D

0 5 13

STUDI PENERAPAN MANAJEMEN RANTAI PASOK (SUPPLY CHAIN MANAGEMENT) PADA PROYEK PEMBANGUNAN GERBANG UTAMA INSTITUT TEKNOLOGI SUMATERA

4 47 42

STUDI PERBANDINGAN DAYA DUKUNG TIANG PANCANG BERDASARKAN DATA SPT, UJI PEMBEBANAN STATIK DAN PDA PADA PROYEK PEMBANGUNAN APARTEMENT BIRD’S PARK – CEMARA ASRI

0 0 16

ANALISIS MANAJEMEN RISIKO PEMBIAYAAN PADA BNI SYARIAH CABANG SEMARANG TUGAS AKHIR - ANALISIS MANAJEMEN RISIKO PEMBIAYAAN PADA BNI SYARIAH CABANG SEMARANG TUGAS AKHIR - Test Repository

0 0 99

ANALISA REKAYASA NILAI DENGAN METODEFASTANALYTICAL HIERARCHY PROSES PADA PROYEK GEDUNG REGIONAL INDOSAT SEMARANG TUGAS AKHIR - ANALISA REKAYASA NILAI DENGAN METODE FAST & ANALYTICAL HIERARCHY PROSES PADA PROYEK GEDUNG REGIONAL INDOSAT SEMARANG

0 0 20

SISTEM INFORMASI MANAJEMEN PROYEK PEMBANGUNAN PADA PT ARTON JAYA DENGAN PENDEKATAN BERORIENTASI OBJEK

0 0 11

PERENCANAAN MANAJEMEN PROYEK SMART (SYSTEM MANAGEMENT FOR RELIABLE TRAINING) PADA PODC (PEOPLE & ORGANIZATION DEVELOPMENT CENTER) TELTICS MEDIA - Binus e-Thesis

0 0 12

MEMBANGUNSISTEM INFORMASI MANAJEMEN PROYEK DI PT. KONINDO CIPTA SEJAHTERA - Repository UNIKOM

0 0 10