LPSE Kabupaten Bolaang Mongondow KOREKSI DI. MENDENG

TABEL KOREKSI ARITMATIK
KEGIATAN
PEKERJAAN
LOKASI

:
:
:

HPS

No. Mata
Pembayaran

I.
1
2
3
4
5
6

7
8
II.
1
2
3
4
III.
1
2
3
4

REHAB./PEMEL. JARINGAN IRIGASI
REHABILITASI JARINGAN IRIGASI D.I MENDENG (DAK/DAU)
KEC. BOLAANG

Uraian

PEKERJAAN KONSTRUKSI

PEKERJAAN BENDUNG (1 Bh)
Bongkaran Pasangan Lama (Man)
Galian Tanah Berbatu (Alat)
Pasangan Batu Kali Sp. 1 : 4
Siaran Sp. 1 : 2
Plesteran Sp 1 : 3
Cor beton Bertulang Sp. 1 : 2 : 3 ( 110 Kg + bekesting )
Pintu besi pengatur (Penguras) B = 1.00 M
Pintu besi pengatur (Intek) B = 0.80 M

Satuan

Kuantitas

32,35
318,24
198,79
124,80
120,50
0,15

1,00
1,00

345.400,00
87.219,34
988.757,22
51.634,17
69.665,97
5.244.965,00
11.550.000,00
9.625.000,00

3

60.087,50
988.757,22
51.634,17
69.665,97

60.087,50

988.757,22
51.634,17
69.665,97

M
M3
M2
M2

19,65
51,44
61,24
73,49

PEKERJAAN BANGUNAN BOX (2 Bh)
Galian Tanah Biasa (Man)
Pasangan Batu Kali Sp. 1 : 4
Siaran Sp. 1 : 2
Plesteran Sp 1 : 3


M3
M3
M2
M2

5,80
9,58
12,59
18,85

PPN 10%
JUMLAH + PPN

Dibulatkan
Penawaran :
Selisih Koreksi

CV. DEBRYAN JAYA
Jumlah
Harga-harga

(Rupiah)

Harga
Satuan
(Rupiah)

272.285.856,92

M3
M3
M3
M2
M2
M3
Bh
Bh

PEKERJAAN SALURAN
Galian Tanah Biasa (Man)
Pasangan Batu Kali Sp. 1 : 4

Siaran Sp. 1 : 2
Plesteran Sp 1 : 3

Jumlah

Harga
Satuan
(Rupiah)

11.173.690,00
27.756.681,23
196.555.047,76
6.443.943,79
8.394.749,39
786.744,75
11.550.000,00
9.625.000,00

50.861.671,40
3.162.076,26

5.119.752,14

9.472.294,17
650.074,14
1.313.203,53

Satuan
(Rupiah)

11.173.690,00
22.822.425,66
186.406.138,40
6.380.911,68
8.275.891,80
770.129,25
11.550.000,00
6.050.000,00

6.788.343,71
48.235.483,47

3.131.146,08
5.047.263,80

2.003.320,00
8.983.202,40
643.715,37
1.294.610,46

9.679.120,00
37.701.892,80
157.369.431,76
5.635.646,02
7.322.539,18
679.230,75
10.450.000,00
8.250.000,00
48.969.152,09

51.700,00
791.636,56

45.157,42
60.767,96

12.924.848,23

345.400,00
937.703,80
51.129,10
68.679,60

Jumlah
Harga-harga
(Rupiah)

237.087.860,51

299.200,00
118.470,00
791.636,56
45.157,42

60.767,96
4.528.205,00
10.450.000,00
8.250.000,00

63.202.237,07

345.400,00
937.703,80
51.129,10
68.679,60

11.784.079,34
348.507,50

Harga

253.429.186,79

345.400,00
71.714,51
937.703,80
51.129,10
68.679,60
5.134.195,00
11.550.000,00
6.050.000,00

60.324.433,79
1.180.934,00

CV. SUMBER ABADI

Jumlah
Harga-harga
(Rupiah)

1.016.089,66
40.721.784,65
2.765.440,40
4.465.837,38
9.597.746,21

51.700,00
791.636,56
45.157,42
60.767,96

299.860,00
7.583.878,24
568.531,92
1.145.476,05

344.394.370,06

329.556.272,10

34.439.437,01

32.955.627,21

29.565.475,88

378.833.807,06

362.511.899,31

325.220.234,69

378.833.000,00

362.511.000,00

325.220.000,00

362.510.500,00

325.220.000,00

500,00

295.654.758,81

-

CV. TANEL
Harga
Satuan
(Rupiah)

CV. TOMBOLISIK

Jumlah
Harga-harga
(Rupiah)

Harga

Satuan
(Rupiah)

-

-

-

-

-

Satuan
(Rupiah)

9.679.120,00
39.918.434,40
157.519.351,23
5.705.548,99
7.438.334,86
670.593,00
11.000.000,00
8.800.000,00

1.016.089,66
40.760.578,64
2.799.742,15
4.536.458,33

299.860,00
7.591.103,10
575.583,83
1.163.590,14

Harga

Satuan
(Rupiah)

2.172.626,00
20.170.452,18
191.431.728,51
7.357.208,35
9.330.337,90
184.035,94
9.900.000,00
6.150.000,00

1.319.933,88
49.535.932,97
3.610.219,87
5.690.344,66

389.528,00
9.225.393,43
742.205,55
1.459.559,08

Harga
Satuan
(Rupiah)

7.686.360,00
26.429.832,00
154.179.969,46
4.922.634,91
6.574.731,85
693.902,55
11.550.000,00
7.150.000,00

789.090,91
39.896.461,74
2.415.562,20
4.009.767,99

232.870,00
7.430.173,08
496.602,35
1.028.495,40

9.821.460,00
40.327.372,80
161.678.435,61
5.741.928,19
7.490.559,56
671.071,50
11.550.000,00
9.350.000,00
50.244.203,22

51.975,00
813.312,72
46.009,04
62.162,32

9.188.140,83

40.150,00
775.592,18
39.444,19
54.562,09

Jumlah
Harga-harga
(Rupiah)

246.630.827,66

303.600,00
126.720,00
813.312,72
46.009,04
62.162,32
4.473.810,00
11.550.000,00
9.350.000,00

47.110.882,84

40.150,00
775.592,18
39.444,19
54.562,09

11.816.686,06

67.160,00
962.984,70
58.951,99
77.430,19

CV. NIRWANA KARYA

Jumlah
Harga-harga
(Rupiah)

219.187.430,77

237.600,00
83.050,00
775.592,18
39.444,19
54.562,09
4.626.017,00
11.550.000,00
7.150.000,00

60.156.431,38

67.160,00
962.984,70
58.951,99
77.430,19

9.630.137,07

51.700,00
792.390,72
45.717,54
61.728,92

CV. PELANGI

Jumlah
Harga-harga
(Rupiah)

246.696.388,88

67.160,00
63.381,26
962.984,70
58.951,99
77.430,19
1.226.906,25
9.900.000,00
6.150.000,00

49.112.868,78

51.700,00
792.390,72
45.717,54
61.728,92

-

-

Harga

240.731.382,48

299.200,00
125.435,00
792.390,72
45.717,54
61.728,92
4.470.620,00
11.000.000,00
8.800.000,00

-

-

CV. KARUNIKA

Jumlah
Harga-harga
(Rupiah)

1.021.494,40
41.836.806,32
2.817.593,61
4.568.308,90
9.844.004,40

51.975,00
813.312,72
46.009,04
62.162,32

301.455,00
7.791.535,86
579.253,81
1.171.759,73

299.474.388,33

318.669.506,32

275.486.454,44

29.947.438,83

31.866.950,63

27.548.645,44

30.671.903,53

329.421.827,16

350.536.456,96

303.035.099,88

337.390.938,81

329.421.000,00

350.536.000,00

303.035.000,00

337.390.000,00

329.390.000,00

350.536.000,00

303.030.000,00

337.390.000,00

31.000,00

-

5.000,00

Lolak,
Juni 2014
POKJA JASA KONSTRUKSI

306.719.035,28

-