REVISI HASIL KOREKSI ARITMATIK PAKET 12, 49, 58.

REVI SI HASI L KOREKSI ARI TMATI K

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN ROWO BENING, OVERLAY HOTMIX PANJANG 1,000 KM LEBAR 4 M,
JALAN ALJIHAT, BENING II, OVERLAY HOTMIX PANJANG 0,400 KM LEBAR 4 M,
JALAN HARAPAN LANJUTAN, OVERLAY HOTMIX PANJANG 0,300 KM LEBAR 4 M,
JALAN KARYA BAKTI, PENGASPALAN HOTMIX PANJANG 0,200 KM LEBAR 4 M,
JALAN PELITA KEL. SIDOMULYO BARAT, OVERLAY HOTMIX PANJANG 0,500 KM LEBAR 4 M

LOKASI
KOTA

: KECAMATAN TAMPAN
: PEKANBARU

HPS / OE

:

Rp


1,939,052,000.00

NO

NAMA PERUSAHAAN

1

2

TOTAL HARGA
TOTAL HARGA
PROSENTASE
URUTAN
TERKOREKSI
HARGA TERKOREKSI PERI NGKAT
PENAWARAN
TERHADAP
SAAT PEMBUKAAN TERHADAP VOLUME
PENAWARAN

HPS / OE
HPS / OE
( Rp.)
( Rp.)
(% )
3

4

5 = 4: HPS X 100

6

1,862,420,000.00

1,862,420,000.00

96.05

1


1,871,110,364.00

1,871,110,000.00

96.50

2

1,902,126,000.00

1,902,126,000.00

98.10

3

1

PT. TI GA PI LAR SEJATI


2

PT. VI RAJAYA RI AUPUTRA

3

PT. BAI K PANJANG

4

PT. MEKAR YAKI N SEJAHTERA

1,902,955,000.00

1,902,955,000.00

98.14

4


5

PT. FI TRA WI KA

1,913,374,000.00

1,913,374,000.00

98.68

5

Pekanbaru,

KETERANGAN

7

Pembulatan Harga


10 FEBRUARI 2011

TTD
PANITIA PENGADAAN BARANG/JASA
SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM
KOTA PEKANBARU

REVISI HASIL KOREKSI ARITMATIK
KEGIATAN

: KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN : JL. IKAN PARANG LANJUTAN
PENGASPALAN HOTMIX PJG : 2,000 KM, LEBAR 4,5 M
PELEBARAN/ OVERLAY HOTMIX PJG : 0,500 KM, LEBAR 4,5 M
OVERLAY HOTMIX PJG : 0,400 KM, LEBAR : 4 M
PEMBUATAN PARIT COR UK. 60 CM PJG : 250 M
PEMBUATANBOX CULVERT UK. 1 X 1 M, PJG : 18 M


LOKASI
KOTA

: KECAMATAN RUMBAI
: PEKANBARU

HPS / OE

:

Rp

3,781,613,000.00

NO

NAMA PERUSAHAAN

TOTAL HARGA

PENAWARAN
SAAT PEMBUKAAN
PENAWARAN
(Rp.)

1

2

3

TOTAL HARGA
TERKOREKSI
TERHADAP VOLUME
HPS / OE
(Rp.)

PERSENTASE
HARGA TERKOREKSI
TERHADAP

HPS/ OE
(%)

URUTAN
PERINGKAT

KETERANGAN

4

5 = 4:HPS X 100

6

7

PEMBULATAN HARGA

1


PT. CANDRA CIPTA SARANA

3,576,023,800.00

3,576,023,000.00

94.56

1

2

PT. BINTAN USAHA ABADI

3,676,296,000.00

3,676,296,000.00

97.22


2

3

PT. RIAU YAKIN TEGUH

3,763,999,000.00

3,763,999,000.00

99.53

3

4

PT. BINTAN KONSTRUKSI PERKASA

3,642,064,500.00

-

-

4

TIDAK MELAMPIRKAN DKH

Pekanbaru, 10 Februari 2011
dto
PANI TI A PENGADAAN BARANG / JASA
DI LI NGKUNGAN DI NAS PEKERJAAN UMUM KOTA PEKANBARU
BI DANG BI NA MARGA

REVI SI HASI L KOREKSI ARI TMATI K

KEGI ATAN

: PEMBANGUNAN JEMBATAN
APBD KOTA PEKANBARU TAHUN ANGGARAN 2011

PEKERJAAN : JALAN MELATI
PEMBUATAN BOX UKURAN 3 X 3 M PANJANG : 5,00 M1
RETAI NI NG WALL H = 2,5 M, PJG : 2,50 M

LOKASI

: KECAMATAN MARPOYAN DAMAI

KOTA

: PEKANBARU

HPS / OE

:

Rp

1

240,000,000.00

NO

NAMA PERUSAHAAN

TOTAL HARGA
PENAWARAN
SAAT PEMBUKAAN
PENAWARAN
( Rp.)

1

2

3

TOTAL HARGA
TERKOREKSI
TERHADAP VOLUME
HPS / OE
( Rp.)

PROSENTASE
HARGA TERKOREKSI
TERHADAP
HPS / OE
(% )

URUTAN
PERI NGKAT

KETERANGAN

4

5 = 4:HPS X 100

6

7

1

CV. BI NA PRI MA JAYA

187,481,000.00

187,481,000.00

78.12

1

2

CV. ALTO ZAMELI SSA

191,500,000.00

191,500,000.00

79.79

2

3

CV. CAHAYA THAYYI BAH

193,153,990.00

194,119,000.00

80.88

3

4

CV. MUARA KEMI LAU

196,367,700.00

196,367,000.00

81.82

4

5

CV. KHARI SMA PUTRI

197,603,000.00

197,603,000.00

82.33

5

6

CV. USAHA SENDI RI

198,559,831.00

198,559,000.00

82.73

6

Pembulatan Penjumlahan

7

CV. RI AU KATA BERTUAH

199,835,130.00

199,835,000.00

83.26

7

8

CV. WAHYU PANCA UTAMA

195,840,000.00

-

-

8

9

CV. FAJAR I NSANI

186,072,000.00

-

-

9

Pembulatan Penjumlahan
Tidak Ada I tem K-125 pada
DKH
Tidak Ada I tem K-125 pada
DKH

Perbedaan nilai antara surat
penawaran dengan DKH

Pekanbaru, 10 Februari 2011
dto
PANI TI A PENGADAAN BARANG / JASA
DI LI NGKUNGAN DI NAS PEKERJAAN UMUM KOTA PEKANBARU
BI DANG BI NA MARGA