REVISI HASIL KOREKSI ARITMATIK PAKET 12, 49, 58.
REVI SI HASI L KOREKSI ARI TMATI K
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN ROWO BENING, OVERLAY HOTMIX PANJANG 1,000 KM LEBAR 4 M,
JALAN ALJIHAT, BENING II, OVERLAY HOTMIX PANJANG 0,400 KM LEBAR 4 M,
JALAN HARAPAN LANJUTAN, OVERLAY HOTMIX PANJANG 0,300 KM LEBAR 4 M,
JALAN KARYA BAKTI, PENGASPALAN HOTMIX PANJANG 0,200 KM LEBAR 4 M,
JALAN PELITA KEL. SIDOMULYO BARAT, OVERLAY HOTMIX PANJANG 0,500 KM LEBAR 4 M
LOKASI
KOTA
: KECAMATAN TAMPAN
: PEKANBARU
HPS / OE
:
Rp
1,939,052,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA
TOTAL HARGA
PROSENTASE
URUTAN
TERKOREKSI
HARGA TERKOREKSI PERI NGKAT
PENAWARAN
TERHADAP
SAAT PEMBUKAAN TERHADAP VOLUME
PENAWARAN
HPS / OE
HPS / OE
( Rp.)
( Rp.)
(% )
3
4
5 = 4: HPS X 100
6
1,862,420,000.00
1,862,420,000.00
96.05
1
1,871,110,364.00
1,871,110,000.00
96.50
2
1,902,126,000.00
1,902,126,000.00
98.10
3
1
PT. TI GA PI LAR SEJATI
2
PT. VI RAJAYA RI AUPUTRA
3
PT. BAI K PANJANG
4
PT. MEKAR YAKI N SEJAHTERA
1,902,955,000.00
1,902,955,000.00
98.14
4
5
PT. FI TRA WI KA
1,913,374,000.00
1,913,374,000.00
98.68
5
Pekanbaru,
KETERANGAN
7
Pembulatan Harga
10 FEBRUARI 2011
TTD
PANITIA PENGADAAN BARANG/JASA
SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM
KOTA PEKANBARU
REVISI HASIL KOREKSI ARITMATIK
KEGIATAN
: KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN : JL. IKAN PARANG LANJUTAN
PENGASPALAN HOTMIX PJG : 2,000 KM, LEBAR 4,5 M
PELEBARAN/ OVERLAY HOTMIX PJG : 0,500 KM, LEBAR 4,5 M
OVERLAY HOTMIX PJG : 0,400 KM, LEBAR : 4 M
PEMBUATAN PARIT COR UK. 60 CM PJG : 250 M
PEMBUATANBOX CULVERT UK. 1 X 1 M, PJG : 18 M
LOKASI
KOTA
: KECAMATAN RUMBAI
: PEKANBARU
HPS / OE
:
Rp
3,781,613,000.00
NO
NAMA PERUSAHAAN
TOTAL HARGA
PENAWARAN
SAAT PEMBUKAAN
PENAWARAN
(Rp.)
1
2
3
TOTAL HARGA
TERKOREKSI
TERHADAP VOLUME
HPS / OE
(Rp.)
PERSENTASE
HARGA TERKOREKSI
TERHADAP
HPS/ OE
(%)
URUTAN
PERINGKAT
KETERANGAN
4
5 = 4:HPS X 100
6
7
PEMBULATAN HARGA
1
PT. CANDRA CIPTA SARANA
3,576,023,800.00
3,576,023,000.00
94.56
1
2
PT. BINTAN USAHA ABADI
3,676,296,000.00
3,676,296,000.00
97.22
2
3
PT. RIAU YAKIN TEGUH
3,763,999,000.00
3,763,999,000.00
99.53
3
4
PT. BINTAN KONSTRUKSI PERKASA
3,642,064,500.00
-
-
4
TIDAK MELAMPIRKAN DKH
Pekanbaru, 10 Februari 2011
dto
PANI TI A PENGADAAN BARANG / JASA
DI LI NGKUNGAN DI NAS PEKERJAAN UMUM KOTA PEKANBARU
BI DANG BI NA MARGA
REVI SI HASI L KOREKSI ARI TMATI K
KEGI ATAN
: PEMBANGUNAN JEMBATAN
APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN : JALAN MELATI
PEMBUATAN BOX UKURAN 3 X 3 M PANJANG : 5,00 M1
RETAI NI NG WALL H = 2,5 M, PJG : 2,50 M
LOKASI
: KECAMATAN MARPOYAN DAMAI
KOTA
: PEKANBARU
HPS / OE
:
Rp
1
240,000,000.00
NO
NAMA PERUSAHAAN
TOTAL HARGA
PENAWARAN
SAAT PEMBUKAAN
PENAWARAN
( Rp.)
1
2
3
TOTAL HARGA
TERKOREKSI
TERHADAP VOLUME
HPS / OE
( Rp.)
PROSENTASE
HARGA TERKOREKSI
TERHADAP
HPS / OE
(% )
URUTAN
PERI NGKAT
KETERANGAN
4
5 = 4:HPS X 100
6
7
1
CV. BI NA PRI MA JAYA
187,481,000.00
187,481,000.00
78.12
1
2
CV. ALTO ZAMELI SSA
191,500,000.00
191,500,000.00
79.79
2
3
CV. CAHAYA THAYYI BAH
193,153,990.00
194,119,000.00
80.88
3
4
CV. MUARA KEMI LAU
196,367,700.00
196,367,000.00
81.82
4
5
CV. KHARI SMA PUTRI
197,603,000.00
197,603,000.00
82.33
5
6
CV. USAHA SENDI RI
198,559,831.00
198,559,000.00
82.73
6
Pembulatan Penjumlahan
7
CV. RI AU KATA BERTUAH
199,835,130.00
199,835,000.00
83.26
7
8
CV. WAHYU PANCA UTAMA
195,840,000.00
-
-
8
9
CV. FAJAR I NSANI
186,072,000.00
-
-
9
Pembulatan Penjumlahan
Tidak Ada I tem K-125 pada
DKH
Tidak Ada I tem K-125 pada
DKH
Perbedaan nilai antara surat
penawaran dengan DKH
Pekanbaru, 10 Februari 2011
dto
PANI TI A PENGADAAN BARANG / JASA
DI LI NGKUNGAN DI NAS PEKERJAAN UMUM KOTA PEKANBARU
BI DANG BI NA MARGA
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN ROWO BENING, OVERLAY HOTMIX PANJANG 1,000 KM LEBAR 4 M,
JALAN ALJIHAT, BENING II, OVERLAY HOTMIX PANJANG 0,400 KM LEBAR 4 M,
JALAN HARAPAN LANJUTAN, OVERLAY HOTMIX PANJANG 0,300 KM LEBAR 4 M,
JALAN KARYA BAKTI, PENGASPALAN HOTMIX PANJANG 0,200 KM LEBAR 4 M,
JALAN PELITA KEL. SIDOMULYO BARAT, OVERLAY HOTMIX PANJANG 0,500 KM LEBAR 4 M
LOKASI
KOTA
: KECAMATAN TAMPAN
: PEKANBARU
HPS / OE
:
Rp
1,939,052,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA
TOTAL HARGA
PROSENTASE
URUTAN
TERKOREKSI
HARGA TERKOREKSI PERI NGKAT
PENAWARAN
TERHADAP
SAAT PEMBUKAAN TERHADAP VOLUME
PENAWARAN
HPS / OE
HPS / OE
( Rp.)
( Rp.)
(% )
3
4
5 = 4: HPS X 100
6
1,862,420,000.00
1,862,420,000.00
96.05
1
1,871,110,364.00
1,871,110,000.00
96.50
2
1,902,126,000.00
1,902,126,000.00
98.10
3
1
PT. TI GA PI LAR SEJATI
2
PT. VI RAJAYA RI AUPUTRA
3
PT. BAI K PANJANG
4
PT. MEKAR YAKI N SEJAHTERA
1,902,955,000.00
1,902,955,000.00
98.14
4
5
PT. FI TRA WI KA
1,913,374,000.00
1,913,374,000.00
98.68
5
Pekanbaru,
KETERANGAN
7
Pembulatan Harga
10 FEBRUARI 2011
TTD
PANITIA PENGADAAN BARANG/JASA
SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM
KOTA PEKANBARU
REVISI HASIL KOREKSI ARITMATIK
KEGIATAN
: KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN : JL. IKAN PARANG LANJUTAN
PENGASPALAN HOTMIX PJG : 2,000 KM, LEBAR 4,5 M
PELEBARAN/ OVERLAY HOTMIX PJG : 0,500 KM, LEBAR 4,5 M
OVERLAY HOTMIX PJG : 0,400 KM, LEBAR : 4 M
PEMBUATAN PARIT COR UK. 60 CM PJG : 250 M
PEMBUATANBOX CULVERT UK. 1 X 1 M, PJG : 18 M
LOKASI
KOTA
: KECAMATAN RUMBAI
: PEKANBARU
HPS / OE
:
Rp
3,781,613,000.00
NO
NAMA PERUSAHAAN
TOTAL HARGA
PENAWARAN
SAAT PEMBUKAAN
PENAWARAN
(Rp.)
1
2
3
TOTAL HARGA
TERKOREKSI
TERHADAP VOLUME
HPS / OE
(Rp.)
PERSENTASE
HARGA TERKOREKSI
TERHADAP
HPS/ OE
(%)
URUTAN
PERINGKAT
KETERANGAN
4
5 = 4:HPS X 100
6
7
PEMBULATAN HARGA
1
PT. CANDRA CIPTA SARANA
3,576,023,800.00
3,576,023,000.00
94.56
1
2
PT. BINTAN USAHA ABADI
3,676,296,000.00
3,676,296,000.00
97.22
2
3
PT. RIAU YAKIN TEGUH
3,763,999,000.00
3,763,999,000.00
99.53
3
4
PT. BINTAN KONSTRUKSI PERKASA
3,642,064,500.00
-
-
4
TIDAK MELAMPIRKAN DKH
Pekanbaru, 10 Februari 2011
dto
PANI TI A PENGADAAN BARANG / JASA
DI LI NGKUNGAN DI NAS PEKERJAAN UMUM KOTA PEKANBARU
BI DANG BI NA MARGA
REVI SI HASI L KOREKSI ARI TMATI K
KEGI ATAN
: PEMBANGUNAN JEMBATAN
APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN : JALAN MELATI
PEMBUATAN BOX UKURAN 3 X 3 M PANJANG : 5,00 M1
RETAI NI NG WALL H = 2,5 M, PJG : 2,50 M
LOKASI
: KECAMATAN MARPOYAN DAMAI
KOTA
: PEKANBARU
HPS / OE
:
Rp
1
240,000,000.00
NO
NAMA PERUSAHAAN
TOTAL HARGA
PENAWARAN
SAAT PEMBUKAAN
PENAWARAN
( Rp.)
1
2
3
TOTAL HARGA
TERKOREKSI
TERHADAP VOLUME
HPS / OE
( Rp.)
PROSENTASE
HARGA TERKOREKSI
TERHADAP
HPS / OE
(% )
URUTAN
PERI NGKAT
KETERANGAN
4
5 = 4:HPS X 100
6
7
1
CV. BI NA PRI MA JAYA
187,481,000.00
187,481,000.00
78.12
1
2
CV. ALTO ZAMELI SSA
191,500,000.00
191,500,000.00
79.79
2
3
CV. CAHAYA THAYYI BAH
193,153,990.00
194,119,000.00
80.88
3
4
CV. MUARA KEMI LAU
196,367,700.00
196,367,000.00
81.82
4
5
CV. KHARI SMA PUTRI
197,603,000.00
197,603,000.00
82.33
5
6
CV. USAHA SENDI RI
198,559,831.00
198,559,000.00
82.73
6
Pembulatan Penjumlahan
7
CV. RI AU KATA BERTUAH
199,835,130.00
199,835,000.00
83.26
7
8
CV. WAHYU PANCA UTAMA
195,840,000.00
-
-
8
9
CV. FAJAR I NSANI
186,072,000.00
-
-
9
Pembulatan Penjumlahan
Tidak Ada I tem K-125 pada
DKH
Tidak Ada I tem K-125 pada
DKH
Perbedaan nilai antara surat
penawaran dengan DKH
Pekanbaru, 10 Februari 2011
dto
PANI TI A PENGADAAN BARANG / JASA
DI LI NGKUNGAN DI NAS PEKERJAAN UMUM KOTA PEKANBARU
BI DANG BI NA MARGA