REVISI HASIL KOREKSI ARITMATIK AKAP

REVISI HASIL KOREKSI ARITMATIK
KEGIATAN
PEKERJAAN
LOKASI
KOTA

:
:
:
:

HPS / OE

:

: Rehabilitasi/Pemeliharaan Terminal/Pelabuhan
: Pekerjaan Pengaspalan Halaman parkir AKDP dan Jalur bus AKAP, AKDP dan DK
: Terminal Bandar Raya Payung Sekaki (BRPS)
PEKANBARU

Rp


259,608,000.00

NO

NAMA PERUSAHAAN

TOTAL HARGA
PENAWARAN
SAAT PEMBUKAAN
PENAWARAN
(Rp.)

1

2

3

TOTAL HARGA

TERKOREKSI
TERHADAP VOLUME
HPS / OE
(Rp.)
4

PERSENTASE
URUTAN
HARGA TERKOREKSI PERINGKAT
TERHADAP
HPS/ OE
(%)
5 = 4:HPS X 100

6

KETERANGAN

7


1

CV. PUTRA INDONESIA

250,355,000.00

250,355,000.00

96.44

1

2

CV. KARYA WARDANA

255,984,000.00

255,984,000.00


98.60

2

3

CV. L O T U S

258,071,000.00

258,071,000.00

99.41

3

4

CV. KENADE


204,900,000.00

-

-

4

RAB TIDAK TERLAMPIR

5

CV. SYARIF BROTHER

228,750,000.00

-

-


5

RAB TIDAK TERLAMPIR

Pekanbaru, 10 Agustus 2011
dto
PANI TI A PENGADAAN BARANG / JASA
DI LI NGKUNGAN DI NAS PERHUBUNGAN, KOMUNI KASI DAN I NFORMATI KA
KOTA PEKANBARU