addendum Pusat Riset ITS.zip gambar potongan-2
rencana Galian /
Pengupasan lapisan lumpur
Luas Area = 164.04 m2
-0.04
- 2.50 +0.08
- 2.50 +0.00
- 2.50
- 2.50 +0.16
-1.46
- 2.50
-1.47
- 2.50
-1.46
-1.48
- 2.50
- 2.50
-1.43
-1.26
- 2.50
- 2.50
-0.10
rencana Urugan Sirtu
Peninggian level bangunan 40 cm
Luas Area = 20,16 m2
- 2.50 +0.00
rencana Urugan Perbaikan tanah
sirtu (dipadatkan)
Luas Area = 255,036 m2
- 2.50
Elevasi rencana dasar Galian
-0.04
- 2.50
Elevasi Existing
- 2.50
-0.10
Jarak
Elevasi tanah existing
- 2.50 +0.00
- 2.50 +0.00
- 2.50 +0.40
- 2.50
+0.40
- 2.50 +0.00
- 2.50 +0.40
- 2.50
- 2.50 +0.40
- 2.50 +0.40
- 2.50
- 2.50 +0.40
- 2.50 +0.40
- 2.50
- 2.50 +0.40
- 2.50 +0.40
Elevasi dasar
- 2.50 +0.00
- 2.50
Elevasi urugan sirtu
- 2.50 +0.00
Jarak
rencana Galian /
Pengupasan lapisan lumpur
Luas Area = 144,359 m2
- 2.50 +0.04
- 2.50 +0.00
0.09
- 2.50
- 2.50 +0.00
-0.16
- 2.50
-1.21
-1.39
-1.43
- 2.50 +0.00
rencana Urugan Sirtu
Peninggian level bangunan 40 cm
Luas Area = 20,16 m2
rencana Urugan tanah /
sirtu (dipadatkan)
Luas Area = 223,64 m2
- 2.50
Elevasi rencana dasar Galian
-1.47
-1.22
- 2.50
0.00
-0.02
-1.00
-1.14
-0.15
-0.13
Elevasi Existing
0.06
Jarak
Elevasi tanah existing
- 2.50 +0.00
- 2.50 +0.40
- 2.50 +0.40
- 2.50 +0.40
- 2.50 +0.40
- 2.50 +0.40
Elevasi dasar
- 2.50 +0.00
Elevasi urugan sirtu
- 2.50 +0.00
Jarak
POTONGAN LAHAN
LAHAN PUSAT RISET ITS -SUKOLILO
SURABAYA
-
1:750
Pengupasan lapisan lumpur
Luas Area = 164.04 m2
-0.04
- 2.50 +0.08
- 2.50 +0.00
- 2.50
- 2.50 +0.16
-1.46
- 2.50
-1.47
- 2.50
-1.46
-1.48
- 2.50
- 2.50
-1.43
-1.26
- 2.50
- 2.50
-0.10
rencana Urugan Sirtu
Peninggian level bangunan 40 cm
Luas Area = 20,16 m2
- 2.50 +0.00
rencana Urugan Perbaikan tanah
sirtu (dipadatkan)
Luas Area = 255,036 m2
- 2.50
Elevasi rencana dasar Galian
-0.04
- 2.50
Elevasi Existing
- 2.50
-0.10
Jarak
Elevasi tanah existing
- 2.50 +0.00
- 2.50 +0.00
- 2.50 +0.40
- 2.50
+0.40
- 2.50 +0.00
- 2.50 +0.40
- 2.50
- 2.50 +0.40
- 2.50 +0.40
- 2.50
- 2.50 +0.40
- 2.50 +0.40
- 2.50
- 2.50 +0.40
- 2.50 +0.40
Elevasi dasar
- 2.50 +0.00
- 2.50
Elevasi urugan sirtu
- 2.50 +0.00
Jarak
rencana Galian /
Pengupasan lapisan lumpur
Luas Area = 144,359 m2
- 2.50 +0.04
- 2.50 +0.00
0.09
- 2.50
- 2.50 +0.00
-0.16
- 2.50
-1.21
-1.39
-1.43
- 2.50 +0.00
rencana Urugan Sirtu
Peninggian level bangunan 40 cm
Luas Area = 20,16 m2
rencana Urugan tanah /
sirtu (dipadatkan)
Luas Area = 223,64 m2
- 2.50
Elevasi rencana dasar Galian
-1.47
-1.22
- 2.50
0.00
-0.02
-1.00
-1.14
-0.15
-0.13
Elevasi Existing
0.06
Jarak
Elevasi tanah existing
- 2.50 +0.00
- 2.50 +0.40
- 2.50 +0.40
- 2.50 +0.40
- 2.50 +0.40
- 2.50 +0.40
Elevasi dasar
- 2.50 +0.00
Elevasi urugan sirtu
- 2.50 +0.00
Jarak
POTONGAN LAHAN
LAHAN PUSAT RISET ITS -SUKOLILO
SURABAYA
-
1:750