addendum Pusat Riset ITS.zip Gambar potongan-1

rencana Galian /
Pengupasan lapisan lumpur
Luas Area = 135,54 m2

- 2.50 +0.30

- 2.50 +0.13

- 2.50 +0.04

- 2.50 +0.00

- 2.50 +0.00

- 2.50 +0.00

- 2.50

- 2.50

- 2.50 +0.04


- 2.50 +0.00

- 2.50 +0.00

- 2.50 +0.00

-0.80
- 2.50
- 2.50 +0.00
- 2.50 +0.00

-1.13
- 2.50
- 2.50 +0.00

-1.37
- 2.50
- 2.50 +0.00


-1.42
- 2.50
- 2.50 +0.00

- 2.50

-1.37
- 2.50
- 2.50 +0.00
- 2.50

rencana Urugan tanah /
sirtu (dipadatkan)
Luas Area = 192,5 m2

- 2.50 +0.00

Elevasi rencana dasar Galian

- 2.50


Elevasi Existing

- 2.50 0.012

0.01

Jarak

Elevasi tanah existing

- 2.50 +0.00

Jarak
Elevasi urugan sirtu
Elevasi dasar

rencana Galian /
Pengupasan lapisan lumpur
Luas Area = 161,91 m2


0.09

-0.16

-1.21
- 2.50
- 2.50 +0.00

-1.43

-1.39
- 2.50
- 2.50 +0.40

rencana Urugan Sirtu
Peninggian level bangunan 40 cm
Luas Area = 20,16 m2

rencana Urugan tanah /

sirtu (dipadatkan)
Luas Area = 223,64 m2

- 2.50

Elevasi rencana dasar Galian

-1.47

-1.22
- 2.50

0.00

-0.02

-1.00

-1.14


-0.15

-0.13

Elevasi Existing

0.06

Jarak

Elevasi tanah existing

+0.40

- 2.50 +0.40

- 2.50 +0.40

- 2.50 +0.40


- 2.50 +0.40

- 2.50 +0.40

Elevasi dasar

- 2.50 +0.00

Elevasi urugan sirtu

- 2.50 +0.00

Jarak

POTONGAN LAHAN
LAHAN PUSAT RISET ITS -SUKOLILO
SURABAYA

-


1:750