Koreksi Disperindag. TU rev

HASI L KOREKSI ARI TMATI K
KEGI ATAN

: PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN

: PEMBANGUNAN GEDUNG KANTOR DI SPERI NDAG

LOKASI

: JL. TERATAI - KECAMATAN SUKAJADI

NI LAI OE ( Rp.)

:

TAHUN ANGGARAN

: 2010


NO
1

17,869,000,000.00

NAMA PERUSAHAAN
2

HARGA
PENAWARAN
( Rp) .

HARGA
TERKOREKSI

PERSENTASE
TERHADAP HPS

( Rp) .


( % )

3

4

5

6

1

PT. ADHI KARYA (Persero) Tbk

13,542,900,000.00

13,543,000,000.00

75.79


2

PT. BONAI RI AU JAYA

13,792,100,000.00

13,792,000,000.00

77.18

3

PT. WASKI TA KARYA

14,286,900,000.00

14,317,000,000.00

80.12


4

PT. DHARMA ABDI PRI MAJU

14,590,920,000.00

14,591,000,000.00

81.66

5

PT. MI TRA GUSNI TA NANDA

14,641,000,000.00

14,641,000,000.00

81.94


6

PT. BELI A ADI GRAHA

15,886,000,000.00

15,886,000,000.00

88.90

7

PT. TAMAKO RAYA PERDANA

15,928,967,000.00

15,929,000,000.00

89.14


Pekanbaru,

Juli 2010

PANI TI A PELAKSANAAN PENGADAAN BARANG / JASA
SECARA ELEKTRONI K
DI NAS PEKERJAAN UMUM KOTA PEKANBARU

KETERANGAN