LPSE Kabupaten Boyolali DOk. MAN 2 BOYOLALI

KEMENTERIAN AGAMA
MADRASAH ALIYAH NEGERI (MAN) 2 BOYOLALI
Alamat : Jl. Singoprono Utara, Walen , No. 13 Simo Boyolali

STANDAR DOKUMEN PENGADAAN
PEKERJAAN KONSTRUKSI
DENGAN PASCA KUALIFIKASI
(PEMILIHAN LANGSUNG)

untuk
Pengadaan Pekerjaan Konstruksi

Rehabilitasi Ruang Kelas (3 Ruang) pada MAN 2 Boyolali Kabupaten Boyolali

Lokasi
Madrasah Aliyah Negeri (MAN) 2 Boyolali
Kabupaten Boyolali

Tahun Anggaran
2012


Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

DAFTAR ISI

BAB I. UMUM ............................................................................................................................................................. 2
BAB II. PENGUMUMAN PELELANGAN UMUM DENGAN PASCAKUALIFIKASI ....................................... 3
BAB III. INSTRUKSI KEPADA PESERTA (IKP).................................................................................................... 5
A. UMUM .......................................................................................................................................................................
1. LINGKUP PEKERJAAN ......................................................................................................................................
2. SUMBER DANA...................................................................................................................................................
3. PESERTA PELELANGAN UMUM .....................................................................................................................
4. LARANGAN KORUPSI, KOLUSI, DAN NEPOTISME (KKN) SERTA PENIPUAN ......................................
5. LARANGAN PERTENTANGAN KEPENTINGAN ...........................................................................................
6. PENDAYAGUNAAN PRODUKSI DALAM NEGERI .......................................................................................
7. SATU PENAWARAN TIAP PESERTA ...............................................................................................................

5
5

5
5
5
6
7
8

B. DOKUMEN PENGADAAN .....................................................................................................................................
8. ISI DOKUMEN PENGADAAN............................................................................................................................
9. BAHASA DOKUMEN PENGADAAN ................................................................................................................
10. PEMBERIAN PENJELASAN .............................................................................................................................
11. PERUBAHAN DOKUMEN PENGADAAN ......................................................................................................
12. TAMBAHAN WAKTU PEMASUKAN DOKUMEN PENAWARAN .............................................................

8
8
9
9
11
11


C. PENYIAPAN DOKUMEN PENAWARAN ...........................................................................................................
13. BIAYA DALAM PENYIAPAN PENAWARAN ...............................................................................................
14. BAHASA PENAWARAN ...................................................................................................................................
15. DOKUMEN PENAWARAN ...............................................................................................................................
16. HARGA PENAWARAN .....................................................................................................................................
17. MATA UANG PENAWARAN DAN CARA PEMBAYARAN.........................................................................
18. MASA BERLAKU PENAWARAN DAN JANGKA WAKTU PELAKSANAAN ...........................................
19. BENTUK DOKUMEN PENAWARAN ..............................................................................................................
20. PAKTA INTEGRITAS ........................................................................................................................................
21. PENGISIAN DOKUMEN ISIAN KUALIFIKASI .............................................................................................
22. JAMINAN PENAWARAN .................................................................................................................................

11
11
11
11
12
13
13

13
14
14
14

D. PEMASUKAN DOKUMEN PENAWARAN .........................................................................................................
23. PENYAMPULAN DAN PENANDAAN SAMPUL PENAWARAN .................................................................
24. PENYAMPAIAN DOKUMEN PENAWARAN .................................................................................................
25. BATAS AKHIR WAKTU PEMASUKAN PENAWARAN ...............................................................................
26. PENAWARAN TERLAMBAT ...........................................................................................................................

15
15
16
16
16

E. PEMBUKAAN DAN EVALUASI PENAWARAN ................................................................................................
27. PEMBUKAAN PENAWARAN ..........................................................................................................................
28. EVALUASI PENAWARAN ...............................................................................................................................

29. EVALUASI KUALIFIKASI ...............................................................................................................................
30. PEMBUKTIAN KUALIFIKASI .........................................................................................................................

17
17
18
26
26

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

F. PENETAPAN PEMENANG PELELANGAN........................................................................................................
31. PENGUMUMAN PEMENANG .........................................................................................................................
32. SANGGAHAN ....................................................................................................................................................
33. SANGGAHAN BANDING .................................................................................................................................

26
26

27
27

G. PENUNJUKAN PEMENANG PENGADAAN ...................................................................................................... 28
34. PENUNJUKAN PENYEDIA BARANG/JASA .................................................................................................. 28
35. KERAHASIAAN PROSES ................................................................................................................................. 29
H. PELELANGAN GAGAL ......................................................................................................................................... 29
36. PELELANGAN GAGAL .................................................................................................................................... 29
I. SURAT JAMINAN PELAKSANAAN ..................................................................................................................... 31
37. SURAT JAMINAN PELAKSANAAN ............................................................................................................... 31
J. PENANDATANGANAN KONTRAK ..................................................................................................................... 32
38. PENANDATANGANAN KONTRAK................................................................................................................ 32
BAB IV. LEMBAR DATA PEMILIHAN (LDP) ........................................................................................................ 34
A.
B.
C.
D.
E.
F.
G.

H.
I.
J.
K.
L.
M.
N.

LINGKUP PEKERJAAN ..................................................................................................................................
SUMBER DANA ..............................................................................................................................................
PEMBERIAN PENJELASAN DOKUMEN PENGADAAN DAN PENINJAUAN LAPANGAN .................
DOKUMEN PENAWARAN ............................................................................................................................
MATA UANG PENAWARAN DAN CARA PEMBAYARAN ......................................................................
MASA BERLAKUNYA PENAWARAN .........................................................................................................
JAMINAN PENAWARAN ...............................................................................................................................
PEMASUKAN DOKUMEN PENAWARAN ...................................................................................................
BATAS AKHIR WAKTU PENYAMPAIAN PENAWARAN ........................................................................
PEMBUKAAN PENAWARAN .......................................................................................................................
[AMBANG BATAS SISTIM GUGUR] ...............................................................................................................
SANGGAHAN, SANGGAHAN BANDING DAN PENGADUAN ................................................................

JAMINAN SANGGAHAN BANDING ............................................................................................................
JAMINAN PELAKSANAAN ...........................................................................................................................

34
34
34
34
35
35
35
36
36
36
36
36
37
37

BAB V. LEMBAR DATA KUALIFIKASI (LDK) ..................................................................................................... 38
A. LINGKUP KUALIFIKASI ............................................................................................................................... 38

B. PERSYARATAN KUALIFIKASI .................................................................................................................... 38
BAB VI BENTUK DOKUMEN PENAWARAN ........................................................................................................ 39
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.

BENTUK SURAT PENAWARAN PESERTA BADAN USAHA/KEMITRAAN (KSO) ..............................
BENTUK SURAT PENAWARAN PESERTA PERORANGAN ....................................................................
BENTUK SURAT KUASA ..............................................................................................................................
BENTUK PERJANJIAN KEMITRAAN/KERJA SAMA OPERASI (KSO) ...................................................
BENTUK DOKUMEN PENAWARAN TEKNIS ............................................................................................
BENTUK FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM
NEGERI (TKDN) ..............................................................................................................................................

BENTUK JAMINAN PENAWARAN DARI BANK .......................................................................................
BENTUK JAMINAN PENAWARAN DARI ASURANSI/PERUSAHAAN PENJAMINAN ........................
PAKTA INTEGRITAS .....................................................................................................................................
BENTUK FORMULIR ISIAN KUALIFIKASI................................................................................................

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

39
41
43
45
47
48
49
51
53
56


J.1. FORMULIR ISIAN KUALIFIKASI BADAN USAHA ................................................................................... 56
J.2. FORMULIR ISIAN KUALIFIKASI PERORANGAN..................................................................................... 62

BAB VII. PETUNJUK PENGISIAN FORMULIR ISIAN KUALIFIKASI .............................................................
VII.1. PENGISIAN FORMULIR ISIAN KUALIFIKASI BADAN USAHA .............................................................
A. DATA ADMINISTRASI ..................................................................................................................................
B. IZIN USAHA ....................................................................................................................................................
C. IZIN LAINNYA (APABILA DIPERSYARATKAN .......................................................................................
D. LANDASAN HUKUM PENDIRIAN BADAN USAHA .................................................................................
E. PENGURUS ......................................................................................................................................................
F. DATA KEUANGAN ........................................................................................................................................
G. DATA PERSONALIA ......................................................................................................................................
H. DATA FASILITAS/PERALATAN/PERLENGKAPAN ..................................................................................
I.
DATA PENGALAMAN PERUSAHAAN .......................................................................................................
J. DATA PEKERJAAN YANG SEDANG DILAKSANAKAN ..........................................................................
K. MODAL KERJA ...............................................................................................................................................
L. KEMITRAAN/KSO ..........................................................................................................................................
VII.2. PENGISIAN FORMULIR ISIAN KUALIFIKASI PERORANGAN .........................................................
A. DATA ADMINISTRASI ..................................................................................................................................
B. IZIN USAHA (APABILA DIPERSYARATKAN)...........................................................................................
C. IZIN LAINNYA (APABILA DIPERSYARATKAN .......................................................................................
D. DATA KEUANGAN ........................................................................................................................................
E. DATA PERSONALIA ......................................................................................................................................
F. DATA FASILITAS/PERALATAN/PERLENGKAPAN.................................................................................
G. DATA PENGALAMAN ...................................................................................................................................
H. DATA PEKERJAAN YANG SEDANG DILAKSANAKAN ..........................................................................
I.
MODAL KERJA ...............................................................................................................................................

66
66
66
66
66
66
66
66
67
67
67
67
67
67
68
68
68
68
68
68
68
69
69
69

BAB VIII. TATA CARA EVALUASI KUALIFIKASI .............................................................................................. 70
BAB IX. BENTUK KONTRAK ................................................................................................................................... 73
BENTUK SURAT PERJANJIAN ............................................................................................................................. 73
BENTUK SURAT PERINTAH KERJA (SPK) ........................................................................................................ 77
BAB X. SYARAT-SYARAT UMUM KONTRAK (SSUK) ....................................................................................... 80
A. KETENTUAN UMUM .............................................................................................................................................
1. DEFINISI ...............................................................................................................................................................
2. PENERAPAN ........................................................................................................................................................
3. BAHASA DAN HUKUM .....................................................................................................................................
4. LARANGAN KORUPSI, KOLUSI, DAN NEPOTISME (KKN) SERTA PENIPUAN ......................................
5. ASAL MATERIAL/BAHAN ................................................................................................................................
6. KORESPONDENSI ...............................................................................................................................................
7. WAKIL SAH PARA PIHAK ........................................................................................................... .....................
8. PEMBUKUAN ......................................................................................................................................................
9. PERPAJAKAN ........................................................................................................................... ...........................
10. PENGALIHAN DAN/ATAU SUBKONTRAK ..................................................................................................
11. PENGABAIAN....................................................................................................................................................
12. PENYEDIA MANDIRI ............................................................................................................ ...........................
13. KEMITRAAN/KSO.............................................................................................................................................
14. PENGAWASAN PELAKSANAAN PEKERJAAN............................................................................................

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

80
82
82
82
83
83
83
84
84
84
84
85
85
85
85

15. PERSETUJUAN PENGAWAS PEKERJAAN ...................................................................................................
16. PERINTAH ..........................................................................................................................................................
17. PENEMUAN-PENEMUAN ................................................................................................................................
18. AKSES KE LOKASI KERJA ..............................................................................................................................

85
85
86
86

B. PELAKSANAAN, PENYELESAIAN, ADENDUM DAN PEMUTUSAN KONTRAK ..................................... 86
19. JADWAL PELAKSANAAN PEKERJAAN ....................................................................................................... 86
B.1 PELAKSANAAN PEKERJAAN ........................................................................................................................... 86
20. PENYERAHAN LOKASI KERJA ......................................................................................................................
21. SURAT PERINTAH MULAI KERJA (SPMK) ..................................................................................................
22. PROGRAM MUTU .............................................................................................................................................
23. RAPAT PERSIAPAN PELAKSANAAN KONTRAK .......................................................................................
24. MOBILISASI .......................................................................................................................................................
25. PEMERIKSAAN BERSAMA .............................................................................................................................

86
87
87
87
88
88

B.2 PENGENDALIAN WAKTU ..................................................................................................................................
26. WAKTU PENYELESAIAN PEKERJAAN ........................................................................................................
27. PERPANJANGAN WAKTU...............................................................................................................................
28. PENUNDAAN OLEH PENGAWAS PEKERJAAN ..........................................................................................
29. RAPAT PEMANTAUAN ....................................................................................................................................
30. PERINGATANN DINI ........................................................................................................................................

89
89
89
90
90
90

B.3. PENYELESAIAN KONTRAK .............................................................................................................................
31. SERAH TERIMA PEKERJAAN ........................................................................................................................
32. PENGAMBILALIHAN .......................................................................................................................................
33. PEDOMAN PENGOPERASIAN DAN PERAWATAN .....................................................................................

90
90
91
91

B.4. ADENDUM ............................................................................................................................................................. 92
34. PERUBAHAN KONTRAK ................................................................................................................................. 92
35. PERUBAHAN LINGKUP PEKERJAAN ........................................................................................................... 92
36. PERUBAHAN JADWAL PELAKSANAAN PEKERJAAN .............................................................................. 99
B.5. KEADAAN KAHAR.............................................................................................................................................. 92
37. KEADAAN KAHAR ........................................................................................................................................... 92
B.6. KEADAAN KAHAR.............................................................................................................................................. 93
38. PENGHENTIAN DAN PEMUTUSAN KONTRAK .......................................................................................... 93
39. PENINGGALAN ................................................................................................................................................. 96
C. HAK DAN KEWAJIBAN KEWAJIBAN PARA PIHAK..................................................................................... 96
40. HAK DAN KEWAJIBAN PARA PIHAK ..........................................................................................................
41. PENGGUNAAN DOKUMEN-DOKUMEN KONTRAK DAN INFORMASI ..................................................
42. HAK KEKAYAAN INTELEKTUAL .................................................................................................................
43. PENANGGUNGAN DAN RISIKO ....................................................................................................................
44. PERLINDUNGAN TENAGA KERJA ................................................................................................................
45. PEMELIHARAAN LINGKUNGAN ..................................................................................................................
46. ASURANSI..........................................................................................................................................................
47. TINDAKAN PENYEDIA YANG MENSYARATKAN PERSETUJUAN PPK ATAU PENGAWA
PEKERJAAN ......................................................................................................................................................

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

96
97
97
97
98
98
99
99

48. LAPORAN HASIL PEKERJAAN ...................................................................................................................... 99
49. KEPEMILIKAN DOKUMEN ............................................................................................................................. 100
50. KERJASAMA ANTARA PENYEDIA DAN SUB PENYEDIA ........................................................................ 100
51. USAHA MIKRO, USAHA KECIL DAN KOPERASI KECIL........................................................................... 101
52. PENYEDIA LAIN ............................................................................................................................................... 101
53. KESELAMATAN ................................................................................................................................................ 101
54. PEMBAYARAN DENDA ................................................................................................................................... 101
55. JAMINAN............................................................................................................................................................ 101
D. PERSONIL DAN/ ATAU PERALATAN DENDA ................................................................................................ 103
56. PERSONIL INTI DAN/ATAU PERALATAN ................................................................................................... 103
E. KEWAJIBAN PPK ................................................................................................................................................... 103
57. FASILITAS.......................................................................................................................................................... 103
58. PERISTIWA KOMPENSASI .............................................................................................................................. 103
F. PEMBAYARAN DENDA KEPADA PENYEDIA ................................................................................................. 104
59. HARGA KONTRAK ........................................................................................................................................... 104
60. PEMBAYARAN .................................................................................................................................................. 105
61. HARI KERJA ...................................................................................................................................................... 107
62. PERHITUNGAN AKHIR.................................................................................................................................... 107
63. PENANGGUHAN ............................................................................................................................................... 107
64. [PENYESUAIAN HARGA (UNTUK KONTRAK HARGA SATUAN ATAU KONTRAK GABUNGAN HARGA
SATUAN DAN LUMP SUM)] ............................................................................................................................... 108
G. PENGAWASAN MUTU .......................................................................................................................................... 109
65. PENGAWASAN DAN PEMERIKSAAN ........................................................................................................... 109
66. PENILAIAN PEKERJAAN SEMENTARA OLEH PPK ................................................................................... 109
67. CACAT MUTU ................................................................................................................................................... 110
68. PENGUJIAN........................................................................................................................................................ 110
69. PERBAIKAN CACAT MUTU............................................................................................................................ 110
70. KEGAGALAN BANGUNAN ............................................................................................................................. 111
H. PENYELESAIAN PERSELISIHAN ...................................................................................................................... 111
71. PENYELESAIAN PERSELISIHAN ................................................................................................................... 111
72. ITIKAD BAIK ..................................................................................................................................................... 111
BAB XI. SYARAT-SYARAT KHUSUS KONTRAK (SSKK) .................................................................................. 113
A. KORESPONDENSI .......................................................................................................................................... 113
B. WAKIL SAH PARA PIHAK ............................................................................................................................ 113
C. TANGGAL BERLAKU KONTRAK................................................................................................................ 113
D. MASA PEMELIHARAAN ............................................................................................................................... 113
E. UMUR KONTRUKSI ....................................................................................................................................... 113
F. PEDOMAN PENGOPERASIAN DAN PERAWATAN .................................................................................. 113
G. PEMBAYARAN TAGIHAN ............................................................................................................................ 114
H. PENCAIRAN JAMINAN ................................................................................................................................. 114
I.
TINDAKAN PENYEDIA YANG MENSYARATKAN PERSETUJUAN PPK ATAU PENGAWAS
PEKERJAAN .................................................................................................................................................... 114
J. KEPEMILIKAN DOKUMEN........................................................................................................................... 114
K. FASILITAS ....................................................................................................................................................... 114
L. SUMBER PEMBIAYAAN ............................................................................................................................... 114

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

M.
N.
O.
P.
Q.

PEMBAYARAN UANG MUKA...................................................................................................................... 114
PEMBAYARAN PRESTASI PEKERJAAN .................................................................................................... 114
PENYESUAIAN HARGA ................................................................................................................................ 115
DENDA ............................................................................................................................................................. 115
PENYELESAIAN PERSELISIHAN ................................................................................................................ 115
LAMPIRAN A – SYARAT-SYARAT KHUSUS KONTRAK ........................................................................ 116

BAB XII. SPESIFIKASI TEKNIS DAN GAMBAR .................................................................................................. 117
A. SYARAT – SYARAT TEKNIS BAHANBANGUNAN ...................................................................................... 117
B. SYARAT – SYARAT PELAKSANAAN PEKERJAAN ..................................................................................... 124
BAB XIII. DAFTAR KUANTITAS DAN HARGA .................................................................................................... 137
KETERANGAN (UNTUK KONTRAK HARGA SATUAN ATAU KONTRAK GABUNGAN HARGA SATUAN
DAN LUMP SUM) .................................................................................................................................................. 137
KETERANGAN (UNTUK KONTRAK LUMP SUM) ............................................................................................. 138
BAB XIV. BENTUK DOKUMEN LAIN ..................................................................................................................... 139
A. BENTUK SURAT PENUNJUKAN PENYEDIA/ JASA (SPPBJ) ................................................................... 139
B. BENTUK SURAT PERINTAH MULAI KERJA (SPMK) .............................................................................. 140
C. BENTUK SURAT-SURAT JAMINAN ............................................................................................................ 142
Jaminan Sanggahan Banding dari Bank.................................................................................................................... 142
Jaminan Pelaksanaan dari Bank............................................................................................................................... 144
Jaminan Pelaksanaan dari Asuransi/Perusahaan Penjaminan................................................................................. 146
Jaminan Uang Muka dari Bank................................................................................................................................. 148
Jaminan Uang Muka dari Asuransi/Perusahaan Penjamin...................................................................................... 150
Jaminan Pemeliharaan dari Bank............................................................................................................................ 152
Jaminan Pemeliharaan dari Asuransi/Perusahaan Penjaminan............................................................................ 154

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

KOP PERUSAHAAN
ANALISA HARGA SATUAN PEKERJAAN
Kegiatan
: PENINGKATAN AKSES DAN MUTU MADRASAH ALIYAH
Pekerjaan
: REHAB 3 RUANG MADRASAH ALIYAH
Lokasi
: MAN 2 BOYOLALI KEC.SIMO BOYOLALI
Sumber Dana
: APBN
Tahun Anggaran
: 2012
DD.8

DD.13

PL.3

PL.9

PEKERJAAN TANAH
PEKERJAAN DINDING
1 M2 PEK PASANG DINDING BATA MERAH TEBAL 1/2 BATA CAMPURAN 1 pc : 3 pp
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah ( Rp )
70.0000
Bahan
Bata merah
Buah
14.3700
Portland cement
KG
Pasir pasang
M3
0.0400
0.3000
Tenaga Kerja
Pekerja
OH
Tukang batu
OH
0.1000
0.0100
Kepala tukang
OH
0.0150
Mandor
OH
Jumlah harga per-satuan pekerjaan
1 M2 PEK PASANG DINDING BATA MERAH TEBAL 1/2 BATA CAMPURAN 1 pc : 8 pp
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah ( Rp )
Bahan
Bata merah
Buah
Portland cement
KG
Pasir pasang
M3
Tenaga Kerja
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Jumlah harga per-satuan pekerjaan
PEKERJAAN PLESTERAN
1 M2 PEK PLESTER BETON 1 pc : 3 pp TEBAL 15 mm + Acian
Satuan
Indeks
Harga Satuan
Kebutuhan
Bahan / Upah ( Rp )
7.7760
Bahan
Portland cement
KG
0.0230
Pasir pasang
M3
Tenaga Kerja
Pekerja
OH
0.3000
0.1500
Tukang batu
OH
0.0150
Kepala tukang
OH
Mandor
OH
0.0150
Jumlah harga per-satuan pekerjaan
1 M2 PEK PLESTER DINDING 1 pc : 8 pp TEBAL 15 mm + Acian
Satuan
Indeks
Kebutuhan
Bahan
Tenaga Kerja

PLSP

Portland cement
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor

KG
M3
OH
OH
OH
OH

1 M' PEK PLESTER SPONENGAN SUDUT 1 pc : 2 pp
Satuan
Kebutuhan
Bahan
Tenaga Kerja

Portland cement
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor

KG
M3
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
Jumlah harga per-satuan pekerjaan

Indeks

Harga Satuan
Bahan / Upah ( Rp )
0.5000
0.0020
0.0570
0.0380
0.0380
0.0020
Jumlah harga per-satuan pekerjaan

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

KA.2

PEKERJAAN KAYU PINTU DAN JENDELA
1 M3 PEK PASANG KUSEN PINTU/JENDELA KAYU KRUING
Kebutuhan
Satuan
Indeks
Bahan

Tenaga Kerja

KA.5

Tenaga Kerja

Tenaga Kerja

Tenaga Kerja

Papan kayu kruing
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

M3
KG
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
0.0240
0.3000
0.8000
2.4000
0.2400
0.0400
Jumlah harga per-satuan pekerjaan

Papan kayu kruing
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

M3
KG
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
0.0640
0.5000
1.0000
3.0000
0.3000
0.0500
Jumlah harga per-satuan pekerjaan

1 M2 PEK PASANG RANGKA PARTISI TRIPEX 3 MM KAYU KRUING
Satuan
Indeks
Kebutuhan
Bahan

Tenaga Kerja

KA.10

M3
KG
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
0.0400
0.5000
1.0000
3.0000
0.3000
0.0500
Jumlah harga per-satuan pekerjaan

1 M2 PEK PASANG DAUN PINTU DAN JENDELA JALUSI KAYU KRUING
Kebutuhan
Satuan
Indeks
Bahan

KP.01

Papan kayu kruing
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Indeks

1 M2 PEK PASANG DAUN PINTU DAN JENDELA KACA KAYU KRUING
Satuan
Indeks
Kebutuhan
Bahan

KA.7

M3
KG
KG
OH
OH
OH
OH

1 M2 PEK PASANG DAUN PINTU PANEEL KAYU KRUING
Kebutuhan
Satuan
Bahan

KA.6

Balok kayu kruing
Paku 10 cm
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Harga Satuan
Bahan / Upah ( Rp )
1.2000
1.2500
1.0000
6.0000
18.0000
1.8000
0.3000
Jumlah harga per-satuan pekerjaan

Kaso 5/7 kayu kruing
Paku 5 dan 10 cm
Triplex 3 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor

M3
KG
M2
OH
OH
OH
OH

1 M2 PEK PASANG JALUSI MATI KUSEN KAYU KAMPER
Satuan
Kebutuhan
Bahan
Tenaga Kerja

Papan kayu kamper
Paku 1 - 2.5 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

M3
KG
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
0.0140
0.2000
0.3500
0.1500
0.3000
0.0300
0.0750
Jumlah harga per-satuan pekerjaan

Indeks

Harga Satuan
Bahan / Upah ( Rp )
0.0600
0.1500
0.6700
2.0000
0.2000
0.3350
Jumlah harga per-satuan pekerjaan

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

KK.2

PEKERJAAN KUNCI DAN KACA
1 BUAH MEMASANG KUNCI TANAM BIASA
Satuan
Kebutuhan
Bahan
Tenaga Kerja

Kunci
Pekerja
Tukang kayu
Kepala tukang
Mandor

BH
OH
OH
OH
OH

Indeks
1.0000

Harga Satuan
Bahan / Upah ( Rp )
-

0.5000
0.0500

-

Jumlah
( Rp )
-

Jumlah harga per-satuan pekerjaan
KK.5

1 BUAH MEMASANG ENGSEL PINTU
Kebutuhan
Bahan
Tenaga Kerja

Engsel pintu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan
BH
OH
OH
OH
OH

Indeks

-

1.0000

Harga Satuan
Bahan / Upah ( Rp )
-

0.1250
0.0130

-

Jumlah
( Rp )
-

Jumlah harga per-satuan pekerjaan
KK.8

1 BUAH MEMASANG ENGSEL JENDELA KUPU-KUPU
Kebutuhan
Satuan
Bahan
Tenaga Kerja

Engsel jendela
Pekerja
Tukang kayu
Kepala tukang
Mandor

BH
OH
OH
OH
OH

Indeks

-

1.0000

Harga Satuan
Bahan / Upah ( Rp )
-

0.1000
0.0100

-

Jumlah
( Rp )
-

Jumlah harga per-satuan pekerjaan
KK.9

1 BUAH MEMASANG KAIT ANGIN
Kebutuhan
Bahan
Tenaga Kerja

Kait angin
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan
BH
OH
OH
OH
OH

Indeks

-

1.0000

Harga Satuan
Bahan / Upah ( Rp )
-

0.1000
0.0100

-

Jumlah
( Rp )
-

Jumlah harga per-satuan pekerjaan
KK.14

1 BUAH MEMASANG GRENDEL
Kebutuhan

1.0000

Harga Satuan
Bahan / Upah ( Rp )
-

0.1000
0.0100

-

-

Jumlah harga per-satuan pekerjaan
1 M2 PEK PASANG KACA MATI BENING POLOS TEBAL 5MM
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah ( Rp )
1.1000
Bahan
Kaca bening polos
BH
0.1600
Tenaga Kerja
Pekerja
OH
Tukang kayu
OH
0.1600
0.0160
Kepala tukang
OH
Mandor
OH
0.0080
Jumlah harga per-satuan pekerjaan

-

Bahan
Tenaga Kerja

KK.16

KA.14

Grendel
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan
BH
OH
OH
OH
OH

Indeks

-

PEKERJAAN KAYU KONSTRUKSI ATAP
1 M3 PEK PASANG KONSTRUKSI KUDA-KUDA KAYU KRUING
Satuan
Indeks
Kebutuhan
Bahan

Tenaga Kerja

Balok kayu kruing
Besi strip tebal 5 mm
Paku 12 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

M3
KG
KG
OH
OH
OH
OH

1.2000
15.000
5.6000
6.7000
20.1000
2.0100
0.3350

Harga Satuan
Bahan / Upah ( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

KA.15

KA.16

AT.1

Jumlah harga per-satuan pekerjaan
1 M3 PEK PAS. KONST. RANGKA ATAP (GORDING, NOK, MUURPLAT, JURAI) KAYU KRUING
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah ( Rp )
1.1000
Bahan
Balok kayu kruing
M3
15.000
Besi strip tebal 5 mm
KG
Paku 12 cm
KG
3.0000
2.4000
Tenaga Kerja
Pekerja
OH
7.2000
Tukang kayu
OH
0.7200
Kepala tukang
OH
0.1200
Mandor
OH
Jumlah harga per-satuan pekerjaan
1 M2 PEK PASANG KASO 5/7 KAYU KRUING DAN RENG 2/3 KAYU KRUING ATAP GENTENG
Satuan
Indeks
Harga Satuan
Kebutuhan
Bahan / Upah ( Rp )
Bahan
Kaso 5/7 kayu kruing
M3
0.0140
0.0036
Reng 2/3 kayu kruing
M3
Paku 5 dan 10 cm
KG
0.2500
0.1000
Tenaga Kerja
Pekerja
OH
0.1000
Tukang kayu
OH
Kepala tukang
OH
0.0100
0.0050
Mandor
OH
Jumlah harga per-satuan pekerjaan
PEKERJAAN PENUTUP ATAP
1 M2 PEK PASANG PENUTUP GENTENG MAGAS KECIL KEBUMEN
Kebutuhan
Satuan
Indeks
Bahan
Tenaga Kerja

AT.3

Genteng Magas
Pekerja
Tukang kayu
Kepala tukang
Mandor

BH
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
25.0000
0.1500
0.0750
0.0080
0.0080
Jumlah harga per-satuan pekerjaan

1 M1 PEK PASANG BUBUNGAN PADA GENTENG MAGAS KEBUMEN
Kebutuhan
Satuan
Indeks
Bahan

Tenaga Kerja

Bubungan
Portland cement
Pasir pasang
Pekerja
Tukang kayu
Kepala tukang
Mandor

BH
KG
M3
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
5.0000
10.800
0.0320
0.4000
0.2000
0.0200
0.0020
Jumlah harga per-satuan pekerjaan

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

PEKERJAAN BETON
BT.5

1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Kebutuhan
Satuan
Indeks
Bahan

Tenaga Kerja

BT.17

Portland semen
Pasir beton
Krikil (max. 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

KG
M3
M3
Tangki
OH
OH
OH
OH

1 KG PEK PEMBESIAN BETON BERTULANG (POLOS/ULIR)
Kebutuhan
Satuan
Bahan
Tenaga Kerja

Besi beton (polos/ulir)
Kawat beton
Pekerja
Tukang batu
Kepala tukang
Mandor

M3
M3
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
326.0000
760.0000
1,029.000
215.0000
1.6500
0.2750
0.0280
0.0830
Jumlah harga per-satuan pekerjaan
Indeks
1.0500
0.0150
0.0070
0.0070
0.0007
0.0004

Harga Satuan
Bahan / Upah ( Rp )
-

Jumlah
( Rp )
Jumlah
( Rp )
-

Jumlah harga per-satuan pekerjaan
BT.21

1 M2 PEK BEKISTING SLOOF
Kebutuhan
Bahan

Tenaga Kerja

BT.22

1 M2 PEK BEKISTING KOLOM
Kebutuhan
Bahan

Tenaga Kerja

BT.24

Tenaga Kerja

Kayu papan sengon
Paku biasa 5- 10 cm
Minyak bekisting
Kayu balok Meranti
Multipleks tebal 9 mm
Bambu apus Ø 8-10 / 4 m1
Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M2 PEK BEKISTING BALOK
Kebutuhan
Bahan

Tenaga Kerja

SN.32

Kayu papan sengon
Paku biasa 5- 10 cm
Minyak bekisting
Kayu balok Meranti
Multipleks tebal 9 mm
Bambu apus Ø 8-10 / 4 m1
Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M2 PEK BEKISTING UNTUK PLAT DAG
Kebutuhan
Bahan

BT.23

Kayu papan sengon
Paku biasa 5- 10 cm
Minyak bekisting
Pekerja
Tukang kayu
Kepala tukang
Mandor

Kayu papan sengon
Paku biasa 5- 10 cm
Minyak bekisting
Kayu balok Meranti
Multipleks tebal 9 mm
Bambu apus Ø 8-10 / 4 m1
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan
M3
M3
ltr
OH
OH
OH
OH

Satuan
M3
M3
ltr
M3
Lembar
Batang
OH
OH
OH
OH

Satuan
M3
M3
ltr
M3
Lembar
Batang
OH
OH
OH
OH

Satuan
M3
M3
ltr
M3
Lembar
Batang
OH
OH
OH
OH

Indeks

Harga Satuan
Bahan / Upah ( Rp )
0.0450
0.3000
0.1000
0.5200
0.2600
0.0260
0.0260
Jumlah harga per-satuan pekerjaan

Indeks

Harga Satuan
Bahan / Upah ( Rp )
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
Jumlah harga per-satuan pekerjaan

Indeks

Harga Satuan
Bahan / Upah ( Rp )
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.6600
0.3300
0.0330
0.0330
Jumlah harga per-satuan pekerjaan

Indeks

Harga Satuan
Bahan / Upah ( Rp )
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
Jumlah harga per-satuan pekerjaan

PEKERJAAN SANITASI DAN ALAT SANITAIR
1 M' PEK PASANG PIPA PVC AW 4"
Kebutuhan
Satuan
Indeks
Bahan
Tenaga Kerja

Pipa PVC AW 4"
Perlengk 17.5% harga pipa
Pekerja
Tukang batu
Kepala tukang batu
Mandor

BH
OH
OH
OH
OH

Harga Satuan
Bahan / Upah ( Rp )
1.2000
0.1750
0.0810
0.1350
0.1350
0.0041
Jumlah harga per-satuan pekerjaan

-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

Jumlah
( Rp )
-

-0-

KEMENTERIAN AGAMA
MADRASAH ALIYAH NEGERI (MAN) 2 BOYOLALI
Alamat : Jl. Singoprono Utara, Walen , No. 13 Simo Boyolali

Dokumen Pengadaan

Pengadaan Pekerjaan
Rehabilitasi Ruang MA (3 Ruang) pada MAN 2 Boyolali Kabupaten Boyolali

- Metoda Pemilihan Langsung dengan Pascakualifikasi -

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

-1-

D O KU M EN P EN GADAAN
Nomor : Pan.Lang.MAN/001/IV/2012
Tanggal: 14 APRIL 2012

untuk
Pengadaan
REHABILITASI RUANG MA (3 RUANG)
MAN 2 BOYOLALI KABUPATEN BOYOLALI

KEMENTERIAN AGAMA KABUPATEN BOYOLALI
TAHUN ANGGARAN 2012

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

-2-

BAB I. UMUM

A. Dokumen Pengadaan ini disusun berdasarkan Peraturan Presiden Republik Indonesia Nomor
54 Tahun 2010 tentang Pengadaan Barang/Jasa Pemerintah.
B. Dalam dokumen ini dipergunakan pengertian, istilah dan singkatan sebagai berikut:
- Pekerjaan
Konstruksi

: seluruh pekerjaan yang berhubungan dengan pelaksanaan konstruksi
bangunan atau pembuatan wujud fisik lainnya;

- HPS

: Harga Perkiraan Sendiri

- HEA

: Harga Evaluasi Akhir;

- Kemitraan/
Kerja sama
Operasi
(KSO)

: kerja sama usaha antar penyedia yang masing-masing pihak mempunyai hak,
kewajiban dan tanggung jawab yang jelas berdasarkan perjanjian tertulis;

- LDP

: Lembar Data Pemilihan

- LDK

: Lembar Data Kualifikasi

- Pokja ULP

: Kelompok Kerja ULP yang berfungsi untuk melaksanakan Pengadaan
Barang/Jasa

- PPK

: Pejabat Pembuat Komitmen adalah pejabat yang bertanggung jawab atas
pelaksanaan Pengadaan Barang/Jasa.

- SPPBJ

: Surat Penunjukan Penyedia Barang/Jasa;

- SPMK

: Surat Perintah Mulai Kerja

- TKDN

: Tingkat Komponen Dalam Negeri

C. [Pelelangan Umum/Pemilihan Langsung] dengan pascakualifikasi ini dibiayai dari sumber
pendanaan yang tercantum dalam LDP.
D. [Pelelangan Umum/Pemilihan Langsung] ini terbuka dan dapat diikuti oleh semua peserta
yang berbentuk badan usaha atau kemitraan/KSO serta perorangan.

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

-3-

BAB II. PENGUMUMAN PEMILIHAN LANGSUNG DENGAN PASCAKUALIFIKASI

KEMENTERIAN AGAMA
MADRASAH ALIYAH NEGERI (MAN) 2 BOYOLALI
Alamat : Jl. Singoprono Utara, Walen , No. 13 Simo Boyolali

PENGUMUMAN PEMILIHAN LANGSUNG DENGAN PASCAKUALIFIKASI
Nomor : P
Panitia Pengadaan Pekerjaan Jasa Konstruksi pada satuan kerja Madrasah Aliyah Negeri (MAN) 2
Boyolali Kabupaten Boyolali, akan melaksanakan Pemilihan Langsung P e n g a d a a n J a s a
K o n s t r u k s i dengan pascakualifikasi untuk paket pekerjaan konstruksi sebagai berikut :
1. Paket Pekerjaan
Nama paket pekerjaan
: Rehabilitasi Ruang MA (3 Ruang)
Lingkup pekerjaan
: Rehabilitasi Ruang MA (3 Ruang) MAN 2 Boyolali, Kab
: Boyolali
: Tahun Anggaran 2012
: Rp
!
!
Nilai total HPS
"
#
#
$
)
Sumber pendanaan
: APBNTahun Anggaran 2012
2. Persyaratan Peserta
a) Peserta Pemilihan Langsung pengadaan jasa konstruksi ini adalah perusahaan yang
memiliki IUJK yang dikeluarkan Pemerintah Kab/Kota yang masih berlaku, kualifikasi
kecil klasifikasi Bidang Arsitektural Sub bidang Bangunan-bangunan non perumahan
lainnya termasuk pemeliharaannya [21005] ;
b) Memiliki Sertifikat Badan Usaha (SBU) yang sesuai dengan Klasifikasi Kecil;
c) Memiliki Akte pendirian perusahaan termasuk perubahan – perubahanya;
d) Tidak dalam pengawasan pengadilan, tidak bangkrut, kegiatan usahanya tidak sedang
dihentikan, dan/atau tidak sedang menjalani sanksi pidana;
e) Secara Hukum mempunyai kapasitas menandatangani kontrak pengadaan;
f) Memiliki kinerja baik dan tidak masuk dalam daftar sanksi atau daftar hitam di suatu
instansi;
g) Memiliki bukti lunas pajak tahunan terakhir (SPT/PPh Tahun 2010) serta memiliki
laporan bulanan PPh pasal 25 atau 21/23 atau PPN sekurang – kuranya 3 bulan terakhir;
h) Mempunyai pengalaman pekerjaan dalam kurun waktu 4 tahun terakhir baik di
lingkungan pemerintah maupun swasta , kecuali bagi penyedia barang / jasa yang baru
berdiri kurang dari 3 tahun
3. Pelaksanaan Pengadaan
Tempat dan alamat
: Madrasah Aliyah Negeri (MAN) 2 Boyolali Kab. Boyolali
: Jl. Singoprono Utara, Walen , No. 13 Simo Boyolali
Website
: www.boyolalikab.go.id.

Standar Dokumen Pengadaan
Pekerjaan Konstruksi
(dengan Pascakualifikasi)

-4-

4. Jadwal Pelaksanaan Pengadaan
No.
a.
b.
c.
d.
e.
f.
g.
h.

Kegiatan
Pendaftaran dan Pengambilan
Dokumen Pengadaan
Pemberian Penjelasan
Pemasukan Dokumen Penawaran
Pembukaan Dokumen Penawaran
Evaluasi Penawaran
Pengumuman Pemenang
Masa Sanggah
Penerbitan SPPBJ

Hari/Tanggal
Sabtu s.d. Rabu
14 Ap