LPSE Kementrian Perhubungan 4. 4
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
Jl. Medan Merdeka Barat No. 8, Jakarta 10110
Phone No. : (021) 352 - 3643, Fax No. : (021) 352 - 3643
ANNOUNCEMENT OF PREQUALIFICATION RESULT
Reference No. A.02/PLS-548-Konstruksi/XI/2012
Regarding Prequalification Result for Construction of Railway Double Tracking on Java South Line (III)
between Kroya-Kutoarjo Project, Directorate General of Railways (DGR), Ministry of Transportation
Republic of Indonesia, we hereby inform you as follows :
No.
1.
Firms
Joint Operation
-Tekken Corporation
-PT. Wijaya Karya (Persero)
Jl. RS. Fatmawati 20
Komplek Famawati Mas
II/207 Cilandak, Jakarta
12430
Phone
Fax
2.
3.
4.
Result of the
Prequalification
Address
Passed
: 021-7693560
: 021-7654940
Joint Operation
-Tokyu Corporation
-PT. Adhi Karya
(Persero)
Wisma HAKA 2nd Floor
Jl. Wahid Hasyim
No.71, Jakarta Pusat
Joint Operation
-PT. Leighton
Contractor Indonesia
-PT. Hutama Karya (Persero)
-Itochu Corporation
Talavera Office Park
Jl. TB. Simatupang Kav
22-26 Cilandak Barat,
Jakarta 12430
Joint Operation
-PT.PP (Persero)Tbk.
-PT. Yasa Pola
Jl. Pemuda No. 165,
Semarang
Phone
Notes
Passed
: 021-3147613
Phone :
021-30002323
Fax
:
021-30002321
Phone : 024 3516490
Passed
Fail
Did Not Pass Criteria of
Evaluation
1. Eligibility
2. Financial Situation
3. Experience
Criteria of Evaluation
1. Eligibility
2. Historical Contract
3. Financial Situation
4. Experience
In accordance with the procedure, if there is any objection to the prequalification result, the objection
letter has to be received by the Tender Committee within 5 (five) working days after the issuance date
of the announcement letter, which is not later than Monday, December 3hd 2012, at 15.00 WIB.
This announcement also available at website : www.dephub.go.id and lpse.dephub.go.id
Yogyakarta, November 26th , 2012
Tender Committee,
DIRECTORATE GENERAL OF RAILWAYS
Jl. Medan Merdeka Barat No. 8, Jakarta 10110
Phone No. : (021) 352 - 3643, Fax No. : (021) 352 - 3643
ANNOUNCEMENT OF PREQUALIFICATION RESULT
Reference No. A.02/PLS-548-Konstruksi/XI/2012
Regarding Prequalification Result for Construction of Railway Double Tracking on Java South Line (III)
between Kroya-Kutoarjo Project, Directorate General of Railways (DGR), Ministry of Transportation
Republic of Indonesia, we hereby inform you as follows :
No.
1.
Firms
Joint Operation
-Tekken Corporation
-PT. Wijaya Karya (Persero)
Jl. RS. Fatmawati 20
Komplek Famawati Mas
II/207 Cilandak, Jakarta
12430
Phone
Fax
2.
3.
4.
Result of the
Prequalification
Address
Passed
: 021-7693560
: 021-7654940
Joint Operation
-Tokyu Corporation
-PT. Adhi Karya
(Persero)
Wisma HAKA 2nd Floor
Jl. Wahid Hasyim
No.71, Jakarta Pusat
Joint Operation
-PT. Leighton
Contractor Indonesia
-PT. Hutama Karya (Persero)
-Itochu Corporation
Talavera Office Park
Jl. TB. Simatupang Kav
22-26 Cilandak Barat,
Jakarta 12430
Joint Operation
-PT.PP (Persero)Tbk.
-PT. Yasa Pola
Jl. Pemuda No. 165,
Semarang
Phone
Notes
Passed
: 021-3147613
Phone :
021-30002323
Fax
:
021-30002321
Phone : 024 3516490
Passed
Fail
Did Not Pass Criteria of
Evaluation
1. Eligibility
2. Financial Situation
3. Experience
Criteria of Evaluation
1. Eligibility
2. Historical Contract
3. Financial Situation
4. Experience
In accordance with the procedure, if there is any objection to the prequalification result, the objection
letter has to be received by the Tender Committee within 5 (five) working days after the issuance date
of the announcement letter, which is not later than Monday, December 3hd 2012, at 15.00 WIB.
This announcement also available at website : www.dephub.go.id and lpse.dephub.go.id
Yogyakarta, November 26th , 2012
Tender Committee,