USK PP 05R BAB XII SPEK. TEKNIS
BAB XII. SPESIFIKASI TEKNIS
PEKERJAAN
: PENGADAAN MEUBELAIR UNIVERSITAS SYIAH KUALA
PAKET
: USK-PP-05
LOKASI
: KAMPUS UNSYIAH BANDA ACEH
TAHUN
: 2012
NO
NAMA ALAT
DESKRIPSI/SPESIFIKASI
MERK
TYPE
NEGARA
ASAL
VOL
HARGA(Rp.)
Kap. : 450.000 BTU/h
Listrik : 380V/3Ph/50 Hz - 49,45 KW
……… ……… …………
3
Unit
Satuan
Jumlah
……………. …………….
AC SPLIT DUCT
Kap. : 600.000 BTU/h
Listrik : 380V/3Ph/50 Hz - 66,91 KW
……… ……… …………
3
Unit
……………. …………….
3
INSTALASI PIPA KONDENSOR
Pipa refrigerant dia. 1 3/8"
Pipa refrigerant dia. 3/4"
Hand Valve dia. 1 3/8"
Hand Valve dia. 3/4"
Filter Dryer dia. 3/4"
Sight Glass dia. 3/4"
Kabel tray : 600 x 10 mm
750
750
20
40
20
20
35
Mtr
Mtr
Buah
Buah
Buah
Buah
Mtr
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
4
INSTALASI LISTRIK
Kabel Control NYY 3x2,5 mm2
Kabel power Indoor NYY 4x6 mm2
Kabel power Outdoor NYY 4x10 mm2
Panel Outdoor & Indoor Lt. 1 s/d Lt. 3
Kabel tray : 300 x 10 mm
800
70
800
5
30
Mtr
Mtr
Mtr
Buah
Mtr
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
5
INSTALASI DUCTING
Penggantian Planum R. AHU (BJLS 100)
Perbaikan instalasi Ducting
6
6
Set
Set
……………. …………….
……………. …………….
6
BONGKAR INSTALASI EXISTING Bongkar unit AC merk YORK EWX 450 & 520
& PEKERJAAN LAIN-LAIN
Bongkar cooling tower LCT-250
Bongkar pompa kondensor 22 KW
8
2
2
Buah ……………. …………….
Buah ……………. …………….
Buah ……………. …………….
1
AC SPLIT DUCT
2
R-22
Bongkar Instalasi pipa kondensor
Bongkar panel AC dan kabel power AC Existing
Bongkar pintu + dinding R. AHU
Perbaikan kembali pintu & dinding R. AHU
Pondasi Outdoor unit
1
1
1
1
21
Lot
Lot
Lot
Lot
Buah
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
7
ALAT BANTU
1
Lot
……………. …………….
8
TESTING & COMMISIONING
1
Lot
……………. …………….
JUMLAH
……………………….….……………….
DIBULATKAN ……………………….….……………….
TERBILANG: ……………………………………….……………….…………………………………………………………………………………..…..(Dengan Huruf)
………………………………………..
…………………….,
PENAWAR,
PT/CV, ……………………………………………..
..
PEKERJAAN
: PENGADAAN MEUBELAIR UNIVERSITAS SYIAH KUALA
PAKET
: USK-PP-05
LOKASI
: KAMPUS UNSYIAH BANDA ACEH
TAHUN
: 2012
NO
NAMA ALAT
DESKRIPSI/SPESIFIKASI
MERK
TYPE
NEGARA
ASAL
VOL
HARGA(Rp.)
Kap. : 450.000 BTU/h
Listrik : 380V/3Ph/50 Hz - 49,45 KW
……… ……… …………
3
Unit
Satuan
Jumlah
……………. …………….
AC SPLIT DUCT
Kap. : 600.000 BTU/h
Listrik : 380V/3Ph/50 Hz - 66,91 KW
……… ……… …………
3
Unit
……………. …………….
3
INSTALASI PIPA KONDENSOR
Pipa refrigerant dia. 1 3/8"
Pipa refrigerant dia. 3/4"
Hand Valve dia. 1 3/8"
Hand Valve dia. 3/4"
Filter Dryer dia. 3/4"
Sight Glass dia. 3/4"
Kabel tray : 600 x 10 mm
750
750
20
40
20
20
35
Mtr
Mtr
Buah
Buah
Buah
Buah
Mtr
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
4
INSTALASI LISTRIK
Kabel Control NYY 3x2,5 mm2
Kabel power Indoor NYY 4x6 mm2
Kabel power Outdoor NYY 4x10 mm2
Panel Outdoor & Indoor Lt. 1 s/d Lt. 3
Kabel tray : 300 x 10 mm
800
70
800
5
30
Mtr
Mtr
Mtr
Buah
Mtr
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
5
INSTALASI DUCTING
Penggantian Planum R. AHU (BJLS 100)
Perbaikan instalasi Ducting
6
6
Set
Set
……………. …………….
……………. …………….
6
BONGKAR INSTALASI EXISTING Bongkar unit AC merk YORK EWX 450 & 520
& PEKERJAAN LAIN-LAIN
Bongkar cooling tower LCT-250
Bongkar pompa kondensor 22 KW
8
2
2
Buah ……………. …………….
Buah ……………. …………….
Buah ……………. …………….
1
AC SPLIT DUCT
2
R-22
Bongkar Instalasi pipa kondensor
Bongkar panel AC dan kabel power AC Existing
Bongkar pintu + dinding R. AHU
Perbaikan kembali pintu & dinding R. AHU
Pondasi Outdoor unit
1
1
1
1
21
Lot
Lot
Lot
Lot
Buah
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
…………….
7
ALAT BANTU
1
Lot
……………. …………….
8
TESTING & COMMISIONING
1
Lot
……………. …………….
JUMLAH
……………………….….……………….
DIBULATKAN ……………………….….……………….
TERBILANG: ……………………………………….……………….…………………………………………………………………………………..…..(Dengan Huruf)
………………………………………..
…………………….,
PENAWAR,
PT/CV, ……………………………………………..
..